Created by JJMC89 bot III
Last edited August 15, 2023
imported>JJMC89 bot III
 
robot: Update article (please report if you notice any mistake or error in this edit)
Line 1: Line 1:
{{EngvarB|date=January 2014}}
{{EngvarB|date=January 2014}}
{{Use dmy dates|date=January 2014}}
{{Use dmy dates|date=January 2014}}
 
{{Infobox dam
'''Uri Dam''' is a 480 [[Megawatt|MW]] [[hydroelectric]] power station on the [[Jhelum River]] near [[Uri (India)|Uri]] in [[Baramula district]] of the [[Jammu and Kashmir (union territory)|Jammu and Kashmir]], [[India]]. It is located very near to the [[Line of Control]], the de facto [[Indo-Pakistani border|border between India and Pakistan]].<ref name="indianexpress">{{cite news|url=http://www.indianexpress.com/res/web/pIe/ie/daily/19981021/29450514.html|title=Uri's Little Europe builds an Indian dream|author=Pranjal Sharma|date=21 October 1998|work=[[The Indian Express]]|access-date=26 November 2009}}</ref> The station is largely built under a hill with a 10&nbsp;km tunnel. It is of the [[Run-of-the-river hydroelectricity|run-of-the-river]] type without a large dam, since the [[Indus Waters Treaty]] gives Pakistan the exclusive right to regulate the Jhelum River.<ref name="tribuneindia">{{cite news|url=http://www.tribuneindia.com/1998/98oct21/j&k.htm|title=Uri project a boon to J-K|date=20 October 1998|work=[[The Tribune (Chandigarh)|The Tribune]] |access-date=26 November 2009}}</ref> On 4 July 2014 a 240 [[megawatt|MW]] Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.<ref>{{cite web|title=Modi inaugurates 240 MW Uri-II power project in Kashmir superb|url=http://news.biharprabha.com/2014/07/modi-inaugurates-240-mw-uri-ii-power-project-in-kashmir/|work=IANS|publisher=news.biharprabha.com|access-date=5 July 2014}}</ref>  
| name                                = Uri Dam
| name_official                        =
| image                                =
| image_size                          =
| image_caption                        =
| image_alt                            =
| location_map                        =
| location_map_size                    =
| location_map_caption                =
| location_map_alt                    =
| coordinates                          = <!-- {{coord|..|..|type:landmark|display=inline,title}}-->
| country                              = [[India]]
| location                            =
| purpose                              =
| status                              =
| construction_began                  =
| opening                              = 1997
| demolished                          =
| cost                                =
| builder                              =
| designed_by                          =
| owner                                =
| operator                            =
| dam_type                            =
| dam_crosses                          =
| dam_height_foundation                =
| dam_height_thalweg                  =
| dam_length                          =
| dam_elevation_crest                  =
| dam_width_crest                      =
| dam_width_base                      =
| dam_volume                          =
| spillway_count                      =
| spillway_type                        =
| spillway_length                      =
| spillway_capacity                    =
| spillway_volumetric_flow_rate        =
| spillway_type2                      =
| spillway_length2                    =
| spillway_capacity2                  =
| spillway_volumetric_flow_rate2      =
| spillway_type3                      =
| spillway_length3                    =
| spillway_capacity3                  =
| spillway_volumetric_flow_rate3      =
| res_name                            =
| res_capacity_total                  =
| res_capacity_active                  =
| res_capacity_inactive                =
| res_catchment                        =
| res_surface                          =
| res_max_length                      =
| res_max_width                        =
| res_max_depth                        =
| res_elevation                        =
| res_tidal_range                      =
| lower_dam_type                      =
| lower_dam_crosses                    =
| lower_dam_height_foundation          =
| lower_dam_height_thalweg            =
| lower_dam_length                    =
| lower_dam_elevation_crest            =
| lower_dam_width_crest                =
| lower_dam_width_base                =
| lower_dam_volume                    =
| lower_spillway_count                =
| lower_spillway_type                  =
| lower_spillway_length                =
| lower_spillway_capacity              =
| lower_spillway_volumetric_flow_rate  =
| lower_spillway_type2                =
| lower_spillway_length2              =
| lower_spillway_capacity2            =
| lower_spillway_volumetric_flow_rate2 =
| lower_spillway_type3                =
| lower_spillway_length3              =
| lower_spillway_capacity3            =
| lower_spillway_volumetric_flow_rate3 =
| lower_res_name                      =
| lower_res_capacity_total            =
| lower_res_capacity_active            =
| lower_res_capacity_inactive          =
| lower_res_catchment                  =
| lower_res_surface                    =
| lower_res_max_length                =
| lower_res_max_width                  =
| lower_res_max_depth                  =
| lower_res_elevation                  =
| lower_res_tidal_range                =
| plant_name                          =
| plant_coordinates                    = <!-- {{coord|..|..|type:landmark|display=inline}}-->
| plant_operator                      =
| plant_commission                    =
| plant_decommission                  =
| plant_type                          =
| plant_hydraulic_head                =
| plant_turbines                      =
| plant_pumpgenerators                =
| plant_pumps                          =
| plant_capacity                      =
| plant_capacity_factor                =
| plant_efficiency                    =
| plant_storage_hours                  =
| plant_annual_gen                    =
| plant_annual_gen_year                =
| website                              =
| extra                                =
}}
'''Uri Dam''' is a 480 [[Megawatt|MW]] [[hydroelectric]] power station on the [[Jhelum River]] near [[Uri (India)|Uri]] in [[Baramula district]] of the [[Jammu and Kashmir (union territory)|Jammu and Kashmir]], [[India]]. It is located very near to the [[Line of Control]], the de facto [[Indo-Pakistani border|border between India and Pakistan]].<ref name="indianexpress">{{cite news|url=http://www.indianexpress.com/res/web/pIe/ie/daily/19981021/29450514.html|title=Uri's Little Europe builds an Indian dream|author=Pranjal Sharma|date=21 October 1998|work=[[The Indian Express]]|access-date=26 November 2009}}</ref> The station is largely built under a hill with a 10&nbsp;km tunnel. It is of the [[Run-of-the-river hydroelectricity|run-of-the-river]] type without a large dam, since the [[Indus Waters Treaty]] gives Pakistan the exclusive right to regulate the Jhelum River.<ref name="tribuneindia">{{cite news|url=http://www.tribuneindia.com/1998/98oct21/j&k.htm|title=Uri project a boon to J-K|date=20 October 1998|work=[[The Tribune (Chandigarh)|The Tribune]] |access-date=26 November 2009}}</ref> On 4 July 2014 a 240 [[megawatt|MW]] Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.<ref>{{cite web|title=Modi inaugurates 240 MW Uri-II power project in Kashmir superb|url=http://news.biharprabha.com/2014/07/modi-inaugurates-240-mw-uri-ii-power-project-in-kashmir/|work=IANS|publisher=news.biharprabha.com|access-date=5 July 2014}}</ref>


== Construction ==
== Construction ==
The project was awarded by the [[NHPC Limited|National Hydroelectric Power Corporation]] in October 1989 to a European consortium called ''Uri Civil'' led by Swedish [[Skanska]] and including Swedish [[Nordic Construction Company|NCC]] and [[ABB Group|ABB]] and British [[Kvaerner Boving]].<ref name="Qazi">{{cite book|last=Qazi|first=S. A.|title=Systematic geography of Jammu and Kashmir|publisher=APH Publishing|place=New Delhi|year=2005|pages=97–98|isbn=81-7648-786-4|url=https://books.google.com/books?id=ZZh3Zkoqtc4C&pg=PA97|access-date=26 November 2009}}</ref> It was partially funded by the Swedish and British governments.<ref>{{cite web|title=Uri Hydro-Electric Project, India: Evaluation of the Swedish Support |url=https://www.sida.se/contentassets/4ac20e376ff64464bf75729713a8a4d1/200841-uri-hydro-electric-project-india-evaluation-of-the-swedish-support_1918.pdf|access-date=23 November 2018}}</ref>  
The project was awarded by the [[NHPC Limited|National Hydroelectric Power Corporation]] in October 1989 to a European consortium called ''Uri Civil'' led by Swedish [[Skanska]] and including Swedish [[Nordic Construction Company|NCC]] and [[ABB Group|ABB]] and British [[Kvaerner Boving]].<ref name="Qazi">{{cite book|last=Qazi|first=S. A.|title=Systematic geography of Jammu and Kashmir|publisher=APH Publishing|place=New Delhi|year=2005|pages=97–98|isbn=81-7648-786-4|url=https://books.google.com/books?id=ZZh3Zkoqtc4C&pg=PA97|access-date=26 November 2009}}</ref> It was partially funded by the Swedish and British governments.<ref>{{cite web|title=Uri Hydro-Electric Project, India: Evaluation of the Swedish Support |url=https://www.sida.se/contentassets/4ac20e376ff64464bf75729713a8a4d1/200841-uri-hydro-electric-project-india-evaluation-of-the-swedish-support_1918.pdf|access-date=23 November 2018}}</ref>  
The workforce included about 200 foreigners and 4,000 Indians, many from the local area.<ref name="tribuneindia" /> <ref name="Santhanam">{{cite book|author=K. Santhanam|title=Jihadis in Jammu and Kashmir: a portrait gallery|publisher=SAGE|year=2003|pages=241–242|isbn=0-7619-9785-7|url=https://books.google.com/books?id=qLyfMmZuByQC&pg=PA241|access-date=27 November 2009}}</ref><ref>[[Sveriges Radio P3]] Dokumentär: ''[http://www.sr.se/sida/artikel.aspx?programid=2519&artikel=2499342 Kidnappningen i Kashmir]'' by Fredrik Johnsson and Kristofer Hansson. First broadcast on 7 December 2008. Radio documentary with interviews.</ref> This together with shelling across the border and unrest related to the burning of [[Charari Sharief]] and the siege of [[Hazratbal Shrine]] led to an 18-month delay.<ref name="indianexpress" />
The workforce included about 200 foreigners and 4,000 Indians, many from the local area.<ref name="tribuneindia" /><ref name="Santhanam">{{cite book|author=K. Santhanam|title=Jihadis in Jammu and Kashmir: a portrait gallery|publisher=SAGE|year=2003|pages=241–242|isbn=0-7619-9785-7|url=https://books.google.com/books?id=qLyfMmZuByQC&pg=PA241|access-date=27 November 2009}}</ref><ref>[[Sveriges Radio P3]] Dokumentär: ''[http://www.sr.se/sida/artikel.aspx?programid=2519&artikel=2499342 Kidnappningen i Kashmir]'' by Fredrik Johnsson and Kristofer Hansson. First broadcast on 7 December 2008. Radio documentary with interviews.</ref> This together with shelling across the border and unrest related to the burning of [[Charari Sharief]] and the siege of [[Hazratbal Shrine]] led to an 18-month delay.<ref name="indianexpress" />


The project cost about [[Indian rupee|Rs.]] 33&nbsp;billion (about 450 million EUR or 660 million USD) and was completed in 1997.<ref name="indianexpress" />
The project cost about [[Indian rupee|Rs.]] 33&nbsp;billion (about 450 million EUR or US$660 million) and was completed in 1997.<ref name="indianexpress" />


== Operation ==
== Operation ==
The station is operated by the [[NHPC]]. Plans to expand it with a 250 MW Uri-II plant were announced in 1998. The government of Pakistan has objected to this, saying it violates the [[Indus Waters Treaty]].<ref>{{cite web|url=http://www.nhpcindia.com/Projects/English/Scripts/Prj_Introduction.aspx?Vid=21|title=Uri-II Project|work=[[NHPC]] website|access-date=27 November 2009}}</ref><ref name="business-standard">{{cite news|url=http://www.business-standard.com/india/news/pakistan-now-objects-to-250-mw-uri-hydel-project/289375/|title=Pakistan now objects to 250-Mw Uri hydel project|author=Gopal Sharma|date=28 June 2007|work=[[Business Standard]]|access-date=27 November 2009}}</ref>On 4 July 2014 a 240 [[Megawatt|MW]] Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.<ref>{{Cite web|url=https://news.biharprabha.com/2014/07/modi-inaugurates-240-mw-uri-ii-power-project-in-kashmir/|title=Modi inaugurates 240 MW Uri-II power project in Kashmir|website=The Biharprabha News|language=en-US|access-date=2019-08-28}}</ref>
The station is operated by the [[NHPC]]. Plans to expand it with a 250 MW Uri-II plant were announced in 1998. The government of Pakistan has objected to this, saying it violates the [[Indus Waters Treaty]].<ref>{{cite web|url=http://www.nhpcindia.com/Projects/English/Scripts/Prj_Introduction.aspx?Vid=21|title=Uri-II Project|work=[[NHPC]] website|access-date=27 November 2009}}</ref><ref name="business-standard">{{cite news|url=http://www.business-standard.com/india/news/pakistan-now-objects-to-250-mw-uri-hydel-project/289375/|title=Pakistan now objects to 250-Mw Uri hydel project|author=Gopal Sharma|date=28 June 2007|work=[[Business Standard]]|access-date=27 November 2009}}</ref> On 4 July 2014 a 240 [[Megawatt|MW]] Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.<ref>{{Cite web|url=https://news.biharprabha.com/2014/07/modi-inaugurates-240-mw-uri-ii-power-project-in-kashmir/|title=Modi inaugurates 240 MW Uri-II power project in Kashmir|website=The Biharprabha News|language=en-US|access-date=2019-08-28}}</ref>


== References ==
== References ==
Line 31: Line 139:
[[Category:1997 establishments in Jammu and Kashmir]]
[[Category:1997 establishments in Jammu and Kashmir]]
[[Category:Dams completed in 1997]]
[[Category:Dams completed in 1997]]
[[Category:Uri, Jammu and Kashmir]]

Revision as of 14:37, 13 June 2022


Uri Dam
CountryIndia
Opening date1997

Uri Dam is a 480 MW hydroelectric power station on the Jhelum River near Uri in Baramula district of the Jammu and Kashmir, India. It is located very near to the Line of Control, the de facto border between India and Pakistan.[1] The station is largely built under a hill with a 10 km tunnel. It is of the run-of-the-river type without a large dam, since the Indus Waters Treaty gives Pakistan the exclusive right to regulate the Jhelum River.[2] On 4 July 2014 a 240 MW Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.[3]

Construction

The project was awarded by the National Hydroelectric Power Corporation in October 1989 to a European consortium called Uri Civil led by Swedish Skanska and including Swedish NCC and ABB and British Kvaerner Boving.[4] It was partially funded by the Swedish and British governments.[5] The workforce included about 200 foreigners and 4,000 Indians, many from the local area.[2][6][7] This together with shelling across the border and unrest related to the burning of Charari Sharief and the siege of Hazratbal Shrine led to an 18-month delay.[1]

The project cost about Rs. 33 billion (about 450 million EUR or US$660 million) and was completed in 1997.[1]

Operation

The station is operated by the NHPC. Plans to expand it with a 250 MW Uri-II plant were announced in 1998. The government of Pakistan has objected to this, saying it violates the Indus Waters Treaty.[8][9] On 4 July 2014 a 240 MW Uri-II power project which is a new project located just downstream of Uri I, was inaugurated.[10]

References

  1. 1.0 1.1 1.2 Pranjal Sharma (21 October 1998). "Uri's Little Europe builds an Indian dream". The Indian Express. Retrieved 26 November 2009.
  2. 2.0 2.1 "Uri project a boon to J-K". The Tribune. 20 October 1998. Retrieved 26 November 2009.
  3. "Modi inaugurates 240 MW Uri-II power project in Kashmir superb". IANS. news.biharprabha.com. Retrieved 5 July 2014.
  4. Qazi, S. A. (2005). Systematic geography of Jammu and Kashmir. New Delhi: APH Publishing. pp. 97–98. ISBN 81-7648-786-4. Retrieved 26 November 2009.
  5. "Uri Hydro-Electric Project, India: Evaluation of the Swedish Support" (PDF). Retrieved 23 November 2018.
  6. K. Santhanam (2003). Jihadis in Jammu and Kashmir: a portrait gallery. SAGE. pp. 241–242. ISBN 0-7619-9785-7. Retrieved 27 November 2009.
  7. Sveriges Radio P3 Dokumentär: Kidnappningen i Kashmir by Fredrik Johnsson and Kristofer Hansson. First broadcast on 7 December 2008. Radio documentary with interviews.
  8. "Uri-II Project". NHPC website. Retrieved 27 November 2009.
  9. Gopal Sharma (28 June 2007). "Pakistan now objects to 250-Mw Uri hydel project". Business Standard. Retrieved 27 November 2009.
  10. "Modi inaugurates 240 MW Uri-II power project in Kashmir". The Biharprabha News. Retrieved 28 August 2019.

External links

Template:Hydrography of Jammu and Kashmir Template:Power Plants of Jammu and Kashmir Template:Jhelum River dams

34°08′40″N 74°11′08″E / 34.1444°N 74.18545°E / 34.1444; 74.18545