Kengeri metro station: Difference between revisions

Created by Sam2905
Last edited November 30, 2025
->Sam2905
mNo edit summary
 
robot: Update article (please report if you notice any mistake or error in this edit)
Line 1: Line 1:
{{refimprove|date=August 2021}}
{{more citations needed|date=August 2021}}
{{Infobox station
{{Infobox station
| name = Kengeri
| name =Kengeri
| style = Namma Metro
| style = Namma Metro
| type = [[Namma Metro]] station
| type = [[Namma Metro]] station
| image = Kengeri Metro Station.jpg
| image = Kengeri metro station.jpg
| caption = This metro station serving the suburbs of Kengeri City.
| caption = This metro station serving the suburbs of Kengeri City.
| address = 133/2B, BSM Extension, Kengeri Satellite Town, Bengaluru, Karnataka 560060
| address = 133/2B, BSM Extension, Kengeri Satellite Town, Bengaluru, Karnataka 560060
| coordinates = {{coord|12.907954019924839|77.4765117501386|display=inline,title}}
| coordinates = {{coord|12.9080|77.4765|display=inline,title}}
| owned = [[Namma Metro]]
| owned = [[Namma Metro]]
| operator = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL)
| operator = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL)
| lines = {{color box|#{{Namma Metro color|Purple}}}} [[Purple Line (Namma Metro)|Purple Line]]
| lines = {{color box|#{{rail color|Namma Metro|Purple}}; font-size:100%|[[Purple Line (Namma Metro)|<span style="color:white;">'''Purple Line'''</span>]]|}}
| platforms = [[Side platform]]<br />  
| platforms = [[Side platform]]<br />  
Platform-1 → [[Baiyappanahalli metro station|Baiyappanahalli]] <br />Platform-2 → Train Terminates Here
Platform-1 → [[Baiyappanahalli metro station|Baiyappanahalli]] <br />Platform-2 → Train Terminates Here <small><i>(To be extended to <b>[[Challaghatta metro station|Challeghatta]]</b> in the near future)</i></small>
| tracks = 2
| tracks = 2
| structure = [[Elevated]]
| structure = [[Elevated]]
| levels = 2
| levels = 2
| parking = {{parking symbol}} Available
| status = Staffed
| code = KGIT
| opened = {{start date and age|2021|August|30|df=yes}}
| opened = {{start date and age|2021|August|30|df=yes}}
| electrified = 750 [[Volt|V]] [[Direct current|DC]] [[third rail]]
| electrified = 750 [[Volt|V]] [[Direct current|DC]] [[third rail]]
| services = {{s-rail|title=Namma Metro}}
| services = {{adjacent stations|system=Namma Metro|line=Purple |left=Kengeri Bus Terminal |right=|type2=|notemid=}}
{{s-line|system=Namma Metro|line=Purple |previous=Kengeri Bus Terminal |next=|type2=|notemid=}}
| route_map = {{BMR Purple Line}}
| route_map = {{BMR Purple Line}}
| map_state = collapsed
| map_state = collapsed
Line 28: Line 30:
}}
}}


'''Kengeri''' is a metro station on the [[Purple Line (Namma Metro)|Purple Line]] of the [[Namma Metro]] serving the suburbs of [[Kengeri]] bordered by [[Nagarbhavi]] to the north and [[Rajarajeshwari Nagar, Bangalore|Rajarajeshwari Nagar]] to the east. Kengeri is a suburb of [[Bangalore]] in [[Karnataka]], [[India]]. It was inaugurated on 29th August 2021 and was commenced to the public on 30th August 2021.<ref>{{Cite news|others=Special Correspondent|date=2021-08-29|title=Kengeri metro line inaugurated, commercial operations from August 30|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/cities/bangalore/bengaluru-metros-extended-purple-line-on-mysuru-road-inaugurated/article36161802.ece|access-date=2021-08-29|issn=0971-751X}}</ref><ref>{{Cite web|title=Bengaluru Metro: 7.5-km Purple line from Mysore Road to Kengeri inaugurated|url=https://www.timesnownews.com/business-economy/companies/article/bengaluru-metro-7-5-km-purple-line-from-mysore-road-to-kengeri-inaugurated/805214|access-date=2021-08-29|website=www.timesnownews.com|language=en}}</ref>
'''Kengeri''' is a western terminal metro station on the [[Purple Line (Namma Metro)|Purple Line]] of the [[Namma Metro]] serving the suburbs of [[Kengeri]] city bordered by [[Nagarbhavi]] to the north and [[Rajarajeshwari Nagar, Bangalore|Rajarajeshwari Nagar]] to the east. [[Kengeri]] is a suburb of [[Bangalore]] in [[Karnataka]], India. It was inaugurated on 29 August 2021 and was commenced to the public on 30 August 2021.<ref>{{Cite news|others=Special Correspondent|date=2021-08-29|title=Kengeri metro line inaugurated, commercial operations from August 30|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/cities/bangalore/bengaluru-metros-extended-purple-line-on-mysuru-road-inaugurated/article36161802.ece|access-date=2021-08-29|issn=0971-751X}}</ref><ref>{{Cite web|title=Bengaluru Metro: 7.5-km Purple line from Mysore Road to Kengeri inaugurated|url=https://www.timesnownews.com/business-economy/companies/article/bengaluru-metro-7-5-km-purple-line-from-mysore-road-to-kengeri-inaugurated/805214|access-date=2021-08-29|website=www.timesnownews.com|language=en}}</ref>
 
== Station layout ==
== Station layout ==
{| class="wikitable"
{|table border=0 cellspacing=0 cellpadding=3
|'''G'''
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=50 valign=top|'''G'''
|Street level
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=100 valign=top|Street level
|Exit/Entrance
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance
|-
|valign=top|'''L1'''
|valign=top|Mezzanine
|valign=top|Fare control, station agent, Metro Card vending machines, crossover<br/>
|-
|-
|'''L1'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=50 rowspan=4 valign=top|'''L2'''
|Mezzanine
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] No- 1, doors will open on the left {{access icon}}</small>
|Fare control, station agent, Metro Card vending machines, crossover
|-
|-
| rowspan="4" |'''L2'''
|style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{rail color|Namma Metro|Purple}}>'''Eastbound'''</span>
| colspan="2" |<small>[[Side platform]] No- 1, doors will open on the left</small>
|style="border-bottom:solid 1px gray;" width=500|Towards → [[Baiyappanahalli metro station|Baiyappanahalli]] <small>next station is [[Kengeri Bus Terminal metro station|Kengeri Bus Terminal]]</small>
|-
|-
|'''Eastbound'''
|<span style=color:#{{rail color|Namma Metro|Purple}}>'''South West bound'''</span>
|Towards [[Baiyappanahalli metro station|Baiyappanahalli]] <small>next station is [[Kengeri Bus Terminal metro station|Kengeri Bus Terminal]]</small>
|Towards ← Train Terminates Here <small>(''to be further extended to <b>[[Challaghatta metro station|Challeghatta]]</b> metro station in the near future'')</small>
|-
|-
|'''South West bound'''
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2  align=center|<small>[[Side platform]] No- 2, doors will open on the left {{access icon}}</small>
|Towards ← Train Terminates Here
|-
|-
| colspan="2" |<small>[[Side platform]] No- 2, doors will open on the left</small>
|style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|'''L2'''
|style="border-bottom:solid 1px gray;" width=100|
|style="border-bottom:solid 1px gray;" width=500|
|-
|-
| rowspan="2" |'''L2'''
|
|}
|}


Line 62: Line 67:
* [[Rapid transit in India|List of rapid transit systems in India]]
* [[Rapid transit in India|List of rapid transit systems in India]]
* [[Metro in bangalore]]
* [[Metro in bangalore]]
* [[Portal:Bangalore|Bangalore portal]]{{Routemap
* [[Portal:Bangalore|Bangalore portal]]{{Routemap
| title = Kengeri track layout
| title = Kengeri track layout
| title bg color = #{{Namma Metro color|Purple}}
| title bg color = #{{rail color|Namma Metro|Purple}}
| collapsible = no
| collapsible = no
| legend = track
| legend = track
| footnote = <div style="width:30em;text-align:center">Station with two tracks and two side platforms</div>
| footnote = <div style="width:30em;text-align:center">Station with two tracks and two side platforms</div>
| map = vCONTgfa
| map = vCONTgfa
cBS\vSTR\cBS ~~ ~~ ~~ to Train Terminates Here
cBS\vSTR\cBS
cBS\vSTR\cBS ~~ ~~ ~~ to [[Kengeri Bus Terminal metro station|Kengeri Bus Terminal]]
cBS\vSTR\cBS ~~ ~~ ~~ to [[Kengeri Bus Terminal metro station|Kengeri Bus Terminal]]
cBS\vSTR\cBS
cBS\vSTR\cBS ~~ ~~ ~~ to Train Terminates here
vCONTgfe
vCONTgfe
}}
}}
Line 79: Line 83:
{{reflist}}
{{reflist}}


 
[[Category:Namma Metro stations]]
 
__FORCETOC__
 
[[Category:Bangalore]]
[[Category:Karnataka]]
[[Category:India]]

Revision as of 07:48, 14 June 2022

Kengeri
Namma Metro station
This metro station serving the suburbs of Kengeri City.
Location133/2B, BSM Extension, Kengeri Satellite Town, Bengaluru, Karnataka 560060
Coordinates12°54′29″N 77°28′35″E / 12.9080°N 77.4765°E / 12.9080; 77.4765
Owned byNamma Metro
Operated byBangalore Metro Rail Corporation Ltd (BMRCL)
Line(s) Purple Line 
PlatformsSide platform
Platform-1 → Baiyappanahalli
Platform-2 → Train Terminates Here (To be extended to Challeghatta in the near future)
Tracks2
Construction
Structure typeElevated
Platform levels2
ParkingCar parking Available
Other information
StatusStaffed
Station codeKGIT
History
Opened30 August 2021; 5 years ago (2021-08-30)
Electrified750 V DC third rail
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Kengeri is located in Bengaluru
Kengeri
Kengeri
Location in Bangalore
Kengeri is located in Karnataka
Kengeri
Kengeri
Location in Karnataka
Kengeri is located in India
Kengeri
Kengeri
Location in India

Kengeri is a western terminal metro station on the Purple Line of the Namma Metro serving the suburbs of Kengeri city bordered by Nagarbhavi to the north and Rajarajeshwari Nagar to the east. Kengeri is a suburb of Bangalore in Karnataka, India. It was inaugurated on 29 August 2021 and was commenced to the public on 30 August 2021.[1][2]

Station layout

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform No- 1, doors will open on the left Disabled access
Eastbound Towards → Baiyappanahalli next station is Kengeri Bus Terminal
South West bound Towards ← Train Terminates Here (to be further extended to Challeghatta metro station in the near future)
Side platform No- 2, doors will open on the left Disabled access
L2

See also

style="color:;background:#Template:Rail color;text-align:center;padding:5px"|
Kengeri track layout
to Train Terminates Here
Station with two tracks and two side platforms

References

  1. "Kengeri metro line inaugurated, commercial operations from August 30". The Hindu. Special Correspondent. 2021-08-29. ISSN 0971-751X. Retrieved 2021-08-29.{{cite news}}: CS1 maint: others (link)
  2. "Bengaluru Metro: 7.5-km Purple line from Mysore Road to Kengeri inaugurated". www.timesnownews.com. Retrieved 2021-08-29.