Gundavali metro station: Difference between revisions

Created by Ajay Kumar
Last edited January 16, 2026
Created a new article
Tag: nowiki added
 
No edit summary
 
Line 1: Line 1:
{{Short description|A Mumbai Metro station on Line 7}}
{{Short description|Mumbai Metro's Red Line 7 terminal metro station}}
{{Use dmy dates|date=August 2023}}
{{Use dmy dates|date=August 2023}}
{{Use Indian English|date=August 2023}}
{{Use Indian English|date=August 2023}}
{{Infobox station
{{Infobox station
| name              = Gundavali
| name              = Gundavali
| type              = [[Mumbai Metro]] station
| native_name        = {{white|{{nobold|गुंदवली}}}}
| style              = Mumbai Metro
| style              = Mumbai Metro
| image              = Gundavali metro station (Jan '23).jpg
| style2            = Red
| image_caption      =  
| other_name        = Andheri (East)
| image              = Gundavali metro station entrance B.jpg
| image_upright      = 1.3
| image_caption      = Entrance B of Gundavali metro station
| address            = Andheri East, Mumbai, Maharashtra 400053
| address            = Andheri East, Mumbai, Maharashtra 400053
| coordinates        = {{coord|19.11502|72.85517|type:railwaystation_region:IN|format=dms|display=inline,title}}
| coordinates        = {{coord|19.11502|72.85517|type:railwaystation_region:IN|format=dms|display=inline,title}}
| line              = {{rcb|Mumbai Metro|Line 7|croute}}
| line              = {{plainlist|
* {{rcb|Mumbai Metro|Line 7|croute}}
* {{rcb|Mumbai Metro|Line 7A|xroute}} ''(Under-construction)''
}}
| other              =  
| other              =  
| structure          = [[Elevated]]
| structure          = [[Elevated]]
| platform          = [[Side platform]]<br/>Platform-1 → Train Terminates Here<br />Platform-2 → {{stl|Mumbai Metro|Ovaripada}}
| platform          = 2 [[side platforms]]
| operator          = Mumbai Metro One Pvt Ltd (MMOPL)
| owned              = [[File:MMRDA logo cropped.svg|22px]] [[Mumbai Metropolitan Region Development Authority]]
| depth              = 
| operator          = {{rint|mumbai|m}} Maha Mumbai Metro Operation Corporation Ltd.
| levels            = 2
| connections        = [[File:Logo of Mumbai Metro Line 1.svg|24px|link=Mumbai_Metro]] {{rcb|Mumbai Metro|Line 1|croute}} at {{stl|Mumbai Metro|WEH}}
| tracks            = 2
| connections        = {{rint|metro|1}} {{stl|Mumbai Metro|Western Express Highway}} {{rcb|Mumbai Metro|Line 1|croute}}
| parking            = No
| parking            = No
| bicycle            =  
| bicycle            =  
| opened            = {{start date and age|df=yes|20 January 2023}}
| opened            = {{start date and age|df=yes|2023|January|20}}
| closed            =  
| closed            =  
| rebuilt            =  
| rebuilt            =  
| electrified        = 25 kV 50 Hz AC through [[overhead catenary]]
| electrified        =  
| ADA                = Yes {{access icon}}
| accessible        = Yes {{access icon}}
| code              =  
| code              = '''<span style="color:#{{rcr|Mumbai Metro|7}}">713</span>'''
| owned              = [[Mumbai Metropolitan Region Development Authority]] (MMRDA)
| zone              =  
| zone              =  
| smartcardname      =  
| smartcardname      =  
Line 38: Line 41:
| pass_system        =  
| pass_system        =  
| mpassengers        =  
| mpassengers        =  
| services          = {{Adjacent stations|system=Mumbai Metro|line=7||left=Mogra |to-left=Ovaripada|right= |to-right=Gundavali}}
| services          = {{Adjstn|system=Mumbai Metro|line1=7|left=Mogra|note-left='''<span style="color:#{{rcr|Mumbai Metro|7}}">712</span>'''|line2=7a|right2=Airport Colony}}
| route_map          = {{MM Line 7}}
| route_map          = {{MM Line 7}}
| map_state          = collapsed
| map_state          = collapsed
| mapframe          = yes
| mapframe          = yes
| mapframe-marker    = rail
| mapframe-marker-color = #{{rail color|Mumbai Metro|Line 7}}
| mapframe-zoom      = 14
| mapframe-zoom      = 14
}}
}}
'''Gundavali''' is the elevated southern terminal metro station on the [[Line 7 (Mumbai Metro)|Red Line 7]] of [[Mumbai Metro]] in [[Mumbai]], India. This metro station was inaugurated on {{Date|Jan 20 2023|DMY}} by Prime Minister [[Narendra Modi]]. <ref>{{Cite web |title=Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here |url=https://www.dnaindia.com/mumbai/report-mumbai-metro-line-2a-line-7-launches-check-routes-station-details-here-3018021 |access-date=2023-08-08 |website=DNA India |language=en}}</ref><ref>{{Cite web |title=PM Modi inaugurates two new Mumbai Metro Lines, projects in Maharashtra |url=https://www.wionews.com/india-news/pm-modi-flagged-off-mumbai-metro-new-line-inaugurates-projects-worth-rs38800-cr-554122 |access-date=2023-08-08 |website=WION |language=en-us}}</ref><ref>{{Cite news |date=2023-01-19 |title=PM Modi inaugurates two new Mumbai Metro lines, launches other development projects |language=en-IN |work=The Hindu |url=https://www.thehindu.com/news/cities/mumbai/pm-modi-inaugurates-two-new-mumbai-metro-lines-launches-other-development-projects/article66409349.ece |access-date=2023-08-08 |issn=0971-751X}}</ref>
'''Gundavali''' is the elevated southern terminal metro station on the North-South corridor of the [[Line 7 (Mumbai Metro)|Red Line 7]] of [[Mumbai Metro]] in [[Mumbai]], India. This metro station was inaugurated on {{Date|Jan 20 2023|DMY}} by Prime Minister [[Narendra Modi]]. <ref>{{Cite web |title=Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here |url=https://www.dnaindia.com/mumbai/report-mumbai-metro-line-2a-line-7-launches-check-routes-station-details-here-3018021 |access-date=2023-08-08 |website=DNA India |language=en}}</ref><ref>{{Cite web |title=PM Modi inaugurates two new Mumbai Metro Lines, projects in Maharashtra |url=https://www.wionews.com/india-news/pm-modi-flagged-off-mumbai-metro-new-line-inaugurates-projects-worth-rs38800-cr-554122 |access-date=2023-08-08 |website=WION |language=en-us}}</ref><ref>{{Cite news |date=2023-01-19 |title=PM Modi inaugurates two new Mumbai Metro lines, launches other development projects |language=en-IN |work=The Hindu |url=https://www.thehindu.com/news/cities/mumbai/pm-modi-inaugurates-two-new-mumbai-metro-lines-launches-other-development-projects/article66409349.ece |access-date=2023-08-08 |issn=0971-751X}}</ref>
 
Gundavali is connected to the [[Western Express Highway metro station|Western Express Highway station]] on [[Line 1 (Mumbai Metro)|Line 1]] through a 58 metre long foot overbridge.<ref>{{Cite web |title=Mumbai: MMRDA completes 58m-long FOB linking 2 metro lines in 15 days |url=https://www.freepressjournal.in/mumbai/mumbai-mmrda-completes-58m-long-fob-linking-2-metro-lines-in-15-days |access-date=2023-11-03 |website=Free Press Journal |language=en}}</ref>


== Station Layout ==
== Station layout ==
{| cellspacing="0" cellpadding="3" border="0"
{| border=0 cellspacing=0 cellpadding=3
| style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width="50" valign="top" |'''G'''
|style="border-bottom:solid 1px gray;vertical-align:top;border-top:solid 1px gray;" rowspan=4;|'''2nd Floor'''
| style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="100" valign="top" |Street Level
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|{{small|[[Side platform]] {{access icon}}}}
| style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="500" valign="top" |Exit/Entrance
|-
| valign="top" |'''L1'''
| valign="top" |Mezzanine
| valign="top" |Fare control, station agent, Metro Card vending machines, crossover
|-
| rowspan="4" style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="50" valign="top" |'''L2'''
| colspan="2" style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" |<small>[[Side platform]]<nowiki> | Doors will open on the left </nowiki>{{access icon}}</small>
|-
|-
| style="border-bottom:solid 1px gray;" width="100" |<span style="color:#{{rail color|Mumbai Metro|7}}">'''Platform 2'''<br />'''Northbound'''</span>
|style="border-bottom:solid 1px gray;" width=50 height=45|'''<span style=color:#{{rail color|Mumbai Metro|red}}>Platform 1</span>'''
| style="border-bottom:solid 1px gray;" width="500" |Towards [[Ovaripada metro station|Ovari Pada]] <small>next station is [[Mogra metro station|Mogra]]</small>
|style="border-bottom:solid 1px gray;" width=390| {{0|→}} Alighting only →
|-
|-
|<span style="color:#{{rail color|Mumbai Metro|7}}">'''Platform 1'''<br />'''Southbound'''</span>
| height=45|<span style=color:#{{rail color|Mumbai Metro|red}}>'''Platform 2'''</span>
|Towards Train Terminates Here
| ← towards {{ltl|Mumbai Metro|line 7|Left}} {{small|([[Mogra metro station|Mogra]])}}
|-
|-
| colspan="2" style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" align="center" |<small>[[Side platform]]<nowiki> | Doors will open on the left </nowiki>{{access icon}}</small>
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;text-align:center;" colspan=2|{{small|[[Side platform]] {{access icon}}}}
|-
|-
| rowspan="2" style="border-bottom:solid 1px gray;" width="50" valign="top" |'''L2'''
|style="vertical-align:top"|'''1st Floor'''
| style="border-bottom:solid 1px gray;" width="100" |
|style="vertical-align:top"|Mezzanine
| style="border-bottom:solid 1px gray;" width="500" |
|style="vertical-align:top"|Fare control, station agent, Metro QR ticket vending machines, crossover
|-
|-
|style="border-bottom:solid 1px gray;border-top:solid 1px gray; vertical-align:top" width=50 |'''Ground'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray; vertical-align:top" width=100 |Street level
|style="border-top:solid 1px gray;border-bottom:solid 1px gray; vertical-align:top" width=420 |Exit/Entrance
|}
|}


=== Power and Signaling System ===
=== Power and signaling system ===
Like all other stations and railways of [[Mumbai Metro|Mumbai metro]], Gundavali station also uses 25,000 volt AC power system by [[Overhead line|overhead catenary]] to operate the trains.
Like all other stations and railways of [[Mumbai Metro|Mumbai metro]], Gundavali station also uses 25,000 volt AC power system by [[Overhead line|overhead catenary]] to operate the trains.


==Entry/Exits==
==Gallery==
{{Empty section|date=August 2023}}
<gallery>
Mumbai Metro at Gundavali Station.jpg | Mumbai Metro at Gundavali Station
Gundavali metro station (Jan '23).jpg | Gundavali metro station
</gallery>


==See also==
==See also==
Line 97: Line 102:
* [http://www.urbanrail.net ''UrbanRail.Net''] – descriptions of all metro systems in the world, each with a schematic map showing all stations.
* [http://www.urbanrail.net ''UrbanRail.Net''] – descriptions of all metro systems in the world, each with a schematic map showing all stations.


{{Mumbai Metro navbox}}
{{Mumbai Metro navbox|line 7=yes}}


[[Category:Mumbai Metro stations]]
[[Category:Mumbai Metro stations]]
[[Category:Railway stations in India opened in 2023]]
[[Category:Andheri]]

Latest revision as of 21:32, 16 January 2026


Gundavali

गुंदवली
Entrance B of Gundavali metro station
Other namesAndheri (East)
LocationAndheri East, Mumbai, Maharashtra 400053
Coordinates19°06′54″N 72°51′19″E / 19.11502°N 72.85517°E / 19.11502; 72.85517
Owned by Mumbai Metropolitan Region Development Authority
Operated byFile:Mumbai Metro Line 1 logo.png Maha Mumbai Metro Operation Corporation Ltd.
Line(s)
Platforms2 side platforms
Connections Template:Rcb at Template:Stl
Construction
Structure typeElevated
ParkingNo
Other information
Station code713
History
Opened20 January 2023; 3 years ago (2023-01-20)
Services
Template:Adjstn
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Gundavali is the elevated southern terminal metro station on the North-South corridor of the Red Line 7 of Mumbai Metro in Mumbai, India. This metro station was inaugurated on 20 January 2023 by Prime Minister Narendra Modi. [1][2][3]

Gundavali is connected to the Western Express Highway station on Line 1 through a 58 metre long foot overbridge.[4]

Station layout[edit | edit source]

2nd Floor Side platform Disabled access
Platform 1 Alighting only →
Platform 2 ← towards Template:Ltl (Mogra)
Side platform Disabled access
1st Floor Mezzanine Fare control, station agent, Metro QR ticket vending machines, crossover
Ground Street level Exit/Entrance

Power and signaling system[edit | edit source]

Like all other stations and railways of Mumbai metro, Gundavali station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

Gallery[edit | edit source]

See also[edit | edit source]

References[edit | edit source]

  1. "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 8 August 2023.
  2. "PM Modi inaugurates two new Mumbai Metro Lines, projects in Maharashtra". WION. Retrieved 8 August 2023.
  3. "PM Modi inaugurates two new Mumbai Metro lines, launches other development projects". The Hindu. 19 January 2023. ISSN 0971-751X. Retrieved 8 August 2023.
  4. "Mumbai: MMRDA completes 58m-long FOB linking 2 metro lines in 15 days". Free Press Journal. Retrieved 3 November 2023.

External links[edit | edit source]

  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.