Arihant-class submarine: Difference between revisions

Created by ImportMaster
Last edited March 28, 2026
m robot: Create/upgrade articles. If there is a mistake please report on my talk page.
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
{{Short description|Class of Indian nuclear-powered ballistic missile submarines}}
{{Short description|Class of Indian nuclear-powered ballistic missile submarines}}
{{good article}}
{{good article}}
{{Use dmy dates|date=March 2022}}
{{Use dmy dates|date=March 2020}}
{{Use Indian English|date=February 2022}}
{{Use Indian English|date=February 2020}}
{|{{Infobox ship begin}}
{{Infobox ship
{{Infobox ship image
|section1={{Infobox ship/image
| image = INS Arihant at sea (cropped).jpg
| image = Arihant class.png
| Ship image =  
| image_caption = Profile of Arihant-class submarine
| Ship caption = INS ''Arihant'', lead vessel of the class
}}
}}
|section2={{Infobox ship/class overview
{{Infobox ship class overview
| name = ''Arihant''
| Name = ''Arihant''
| builders = Ship Building Centre (SBC), [[Visakhapatnam]]
| Builders = Navy Shipbuilding Centre, [[Visakhapatnam]]<ref>{{Cite news|url=http://www.thehindu.com/news/cities/Visakhapatnam/contract-worker-killed-in-accident-at-navy-ship-building-centre/article5764589.ece|title=Contract worker killed in accident at navy ship building centre|newspaper=[[The Hindu]]|access-date=17 March 2016|date=8 March 2014|url-status=live|archive-url=https://web.archive.org/web/20140314121922/http://www.thehindu.com/news/cities/Visakhapatnam/contract-worker-killed-in-accident-at-navy-ship-building-centre/article5764589.ece|archive-date=14 March 2022}}</ref>
| operators = {{navy|India}}
| Operators = {{navy|India}}
| class_after = {{sclass|S5|submarine|4}}
| Class after = {{sclass|S5|submarine|3}}
| in_commission_range = 2016{{ndash}}present
| In commission range = 2016{{ndash}}present
| total_ships_planned = 5
| Total ships building = 2<ref>{{Cite news|url=https://thediplomat.com/2016/05/why-india-needs-both-nuclear-and-conventional-submarines/|title=Why India needs submarines|newspaper=The Diplomat|access-date=17 May 2016|date=May 2016|url-status=live|archive-url=https://web.archive.org/web/20160517064847/https://thediplomat.com/2016/05/why-india-needs-both-nuclear-and-conventional-submarines/|archive-date=17 May 2022}}</ref>
| total_ships_completed = 4
| Total ships planned = 4
| total_ships_active = 2
| Total ships completed = 2
| total_ships_laid_up =  
| Total ships active = 2
| total_ships_lost =  
| Total ships laid up =  
| total_ships_retired =  
| Total ships lost =  
| total_ships_preserved =  
| Total ships retired =  
| cost = {{INRConvert|40|b|lk=r}} per submarine<ref name="India Today3" />
| Total ships preserved =
}}
| Cost = {{INRConvert|40|b|lk=r}} per submarine<ref name="India Today">{{cite news|title=A peek into India's top secret and costliest defence project, nuclear submarines|url=http://indiatoday.intoday.in/story/india-ballistic-missile-submarine-k-6-submarine-launched-drdo/1/1104982.html|access-date=11 December 2017|work=[[India Today]]|date=7 December 2017|url-status=live|archive-url=https://web.archive.org/web/20171211024434/http://indiatoday.intoday.in/story/india-ballistic-missile-submarine-k-6-submarine-launched-drdo/1/1104982.html|archive-date=11 December 2022}}</ref>
 
}}
|section3={{Infobox ship/characteristics
{{Infobox ship characteristics
| hide_header =  
| Hide header =  
| header_caption =  
| Header caption =  
| type = [[Nuclear submarine|Nuclear-powered]] [[ballistic missile submarine]]
| Ship type = [[Nuclear submarine|Nuclear powered]] [[ballistic missile submarine]]
| displacement = *{{INS|Arihant||2}} & {{INS|Arighaat||2}}: {{convert|6000|t|abbr=on}} surfaced<ref name=dna-launch>{{cite news|url=http://www.dnaindia.com/india/report_india-reaches-milestone-with-launch-of-n-powered-submarine_1277227|title=India reaches milestone with launch of n-powered submarine|newspaper=DNA|date=26 July 2007|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20090728073620/http://www.dnaindia.com/india/report_india-reaches-milestone-with-launch-of-n-powered-submarine_1277227|archive-date=28 July 2009}}</ref>
| Ship displacement = *[[INS Arihant|''Arihant'']] & [[INS Arighat|''Arighat'']]: {{convert|6000|t|abbr=on}} surfaced<ref name=dna-launch>{{cite news|url=http://www.dnaindia.com/india/report_india-reaches-milestone-with-launch-of-n-powered-submarine_1277227|title=India reaches milestone with launch of n-powered submarine|newspaper=DNA|date=26 July 2007|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref>
                  * {{INS|Aridhaman||2}} & {{INS|Arisudan||2}}: {{convert|7000|t|abbr=on}}<ref name="India Today3" />
* S4 & S4*: {{convert|7000|t|abbr=on}}<ref name="India Today3" />
| length = Arihant & Arighaat: {{convert|111|m|abbr=on}};<ref name="NuclearArm" />  
| Ship length = Arihant & Arighat: {{convert|111|m|abbr=on}};<ref name="NuclearArm" />  
S-4: {{convert|130|m|abbr=on}}<ref name="NuclearArm" /><ref>{{Cite web|url=http://www.hisutton.com/Indian-Navy-S4-SSBN.html|title=H I Sutton - Covert Shores}}</ref>
S-4: {{convert|130|m|abbr=on}}<ref name="NuclearArm" /><ref>{{Cite web|url=http://www.hisutton.com/Indian-Navy-S4-SSBN.html|title=H I Sutton - Covert Shores}}</ref>
| Ship beam = {{convert|11|m|abbr=on}}<ref name="NuclearArm" />
| beam = {{convert|11|m|abbr=on}}<ref name="NuclearArm" />
| Ship height =  
| height =  
| Ship draft = {{convert|15|m|abbr=on}}<ref name="NuclearArm" />
| draft = {{convert|15|m|abbr=on}}<ref name="NuclearArm" />
| Ship depth =  
| depth =  
| Ship decks =  
| decks =  
| Ship deck clearance =  
| deck_clearance =  
| Ship power =  
| power =  
| Ship propulsion = *1 x CLWR-B1 [[pressurized water reactor]]<ref name="CLWR-B1">{{cite news |title=Founder's Day Speech, Director, BARC |url=http://www.barc.gov.in/presentations/fddir18.pdf |access-date=21 March 2021 |publisher=Bhabha Atmoic Research Centre |date=30 October 2022}}</ref><ref name="clwr_barc">{{cite journal |title=DAE (Excellence in Science, Engineering & Technology) Awards 2010 |journal=BARC Newsletter |date=Sep–Oct 2011 |issue=322 |page=33 |url=http://www.barc.gov.in/publications/nl/2011/2011091009.pdf |access-date=21 March 2021}}</ref><ref name=toi-ntriad/> (83 MW)
| propulsion = *1 x CLWR-B1 [[pressurized water reactor]]<ref name="CLWR-B1">{{cite news |title=Founder's Day Speech, Director, BARC |url=http://www.barc.gov.in/presentations/fddir18.pdf |access-date=21 March 2021 |publisher=Bhabha Atmoic Research Centre |date=30 October 2018}}</ref><ref name="clwr_barc">{{cite journal |title=DAE (Excellence in Science, Engineering & Technology) Awards 2010 |journal=BARC Newsletter |date=Sep–Oct 2011 |issue=322 |page=33 |url=http://www.barc.gov.in/publications/nl/2011/2011091009.pdf |access-date=21 March 2021 |archive-date=15 May 2013 |archive-url=https://web.archive.org/web/20130515202113/http://barc.gov.in/publications/nl/2011/2011091009.pdf |url-status=dead }}</ref><ref name="toi-ntriad">{{cite news|url=https://timesofindia.indiatimes.com/india/India-to-achieve-N-arm-triad-in-February/articleshow/11332636.cms|archive-url=https://web.archive.org/web/20130326102050/http://articles.timesofindia.indiatimes.com/2012-01-02/india/30580966_1_ins-arihant-first-indigenous-nuclear-submarine-akula-ii|url-status=live|archive-date=26 March 2013|title = India to achieve N-arm triad in February|newspaper=[[The Times of India]]|date=2 January 2012|access-date=17 March 2016}}</ref> (83 MW-100MW)
* 1 × [[propeller shaft|shaft]]
                * 1 × [[propeller shaft|shaft]]
| Ship speed = *''Surfaced:'' {{convert|12|-|15|kn|km/h|abbr=on}}
| speed = *''Surfaced:'' {{convert|12|-|15|kn|km/h|abbr=on}}
* ''Submerged:'' {{convert|24|kn|km/h|abbr=on}}
          * ''Submerged:'' {{convert|24|kn|km/h|abbr=on}}
| Ship range = Unlimited except by food supplies
| range = Unlimited except by food supplies
| Ship endurance =  
| endurance =  
| Ship test depth = {{convert|300|m|abbr=on}}
| test_depth = {{convert|450|m|abbr=on}}
| Ship complement = 95
| complement = 95
| Ship time to activate =  
| time_to_activate =  
| Ship sensors = [[USHUS (sonar)|USHUS]] sonar
| sensors = *[[USHUS (sonar)|USHUS]] sonar
| Ship EW =  
            *[[Panchendriya (sonar)|Panchendriya]] sonar
| Ship armament = *[[INS Arihant|''Arihant'']] & [[INS Arighat|''Arighat'']]: 12 × [[Sagarika (missile)|K15]] [[SLBM]] ({{cvt|750|km|disp=or}} range) or 4 × [[K-4 (SLBM)|K-4]] SLBM ({{cvt|3500|km|disp=or}} range)<ref name=toi-ntriad/><ref name="India Today3" />
| EW =  
* S4 & S4*: 24 × [[Sagarika (missile)|K15]] [[SLBM]] ({{cvt|750|km|disp=or}} range) or 8 × [[K-4 (SLBM)|K-4]] SLBM ({{cvt|3500|km|disp=or}} range)<ref name="India Today3" /> or 8 × [[K-5 (SLBM)|K-5]] SLBM ({{cvt|5000-6000|km|disp=or}} range)<ref name="THE NEW INDIAN EXPRESS">{{cite news |title =DRDO on long range Pralay, K5 to stalemate China soon |url= https://www.newindianexpress.com/states/odisha/2018/dec/15/maiden-trial-of-pralay-k5-likely-soon-1911623.html |publisher = THE NEW INDIAN EXPRESS |access-date= 15 December 2022}}</ref>
| armament = *[[INS Arihant|''Arihant'']] & [[INS Arighaat|''Arighaat'']]: 12 × [[Sagarika (missile)|K15]] [[SLBM]] ({{cvt|1500|km|disp=or}} range) or 4 × [[K-4 (SLBM)|K-4]] SLBM ({{cvt|3500|km|disp=or}} range)<ref name="India Today3"/>
* 6 × 21" (533 mm) torpedo tubes – est 30 charges (torpedoes, cruise missiles or mines)<ref>{{cite web|first=John|last=Pike|url=http://www.globalsecurity.org/military/world/india/atv-specs.htm|title=Advanced Technology Vessel (ATV)|publisher=globalsecurity.org|date=27 July 2009|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20110829062226/http://www.globalsecurity.org/military/world/india/atv-specs.htm|archive-date=29 August 2022}}</ref>
              * [[INS Aridhaman|''Aridhaman'']] & ''Arisudhan'': 24 × [[Sagarika (missile)|K15]] [[SLBM]] ({{cvt|750|km|disp=or}} range) or 8 × [[K-4 (SLBM)|K-4]] SLBM ({{cvt|3500|km|disp=or}} range)<ref name="India Today3"/> or 8 × [[K-5 (SLBM)|K-5]] SLBM ({{cvt|5000-6000|km|disp=or}} range)<ref name="globalsecurity">{{cite web|first=John|last=Pike|url=http://www.globalsecurity.org/military/world/india/atv-specs.htm|title=Advanced Technology Vessel (ATV)|publisher=globalsecurity.org|date=27 July 2009|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20110829062226/http://www.globalsecurity.org/military/world/india/atv-specs.htm|archive-date=29 August 2011}}</ref>
| Ship notes =  
              * 6 × 21" (533 mm) torpedo tubes – est 30 charges (torpedoes, cruise missiles or mines)<ref name="globalsecurity"/>
| notes =  
}}
}}
}}
|}


The '''''Arihant''-class''' ({{trans|'Slayer of Enemies'}} in [[Sanskrit]]) is a class of [[India]]n [[nuclear marine propulsion|nuclear-powered]] [[ballistic missile submarine]]s being built for the [[Indian Navy]]. They were developed under the {{INRConvert|900|b|lk=r}} ''Advanced Technology Vessel'' (ATV) project to design and build nuclear-powered submarines.<ref name="India Today"/> These vessels are classified as ''''strategic strike nuclear submarines'''' by India.<ref>{{Cite web|url=http://pib.gov.in/Pressreleaseshare.aspx?PRID=1551894|title=Prime Minister felicitates crew of INS Arihant on completion of Nuclear Triad|date=5 November 2018|website=Press Information Bureau, Government of India|access-date=2019-09-15}}</ref><ref>{{Cite news|url=https://economictimes.indiatimes.com/news/defence/ins-arihant-completes-indias-nuclear-triad-pm-modi-felicitates-crew/articleshow/66509959.cms?from=mdr|title=INS Arihant completes India's nuclear triad, PM Modi felicitates crew|date=2018-11-06|work=The Economic Times|access-date=2019-09-15}}</ref>
The '''''Arihant''-class''' ({{Lit|Vanquisher of the Enemy}}) is a class of [[Nuclear submarine|nuclear-powered]] [[ballistic missile submarine]]s in service with the [[Indian Navy]]. They were developed under the ''Advanced Technology Vessel'' (ATV) project to design and build nuclear-powered submarines.<ref name="India Today3" /> The project is being seen as a [[black project]].<ref name="toi-20090717" /> These vessels are classified as ''''strategic strike nuclear submarines'''' by India.<ref name=":5">{{Cite press release |title=Prime Minister felicitates crew of INS Arihant on completion of Nuclear Triad |date=2018-11-05 |publisher=[[Press Information Bureau]] |url=https://www.pib.gov.in/PressReleasePage.aspx?PRID=1551894&reg=3&lang=1 |access-date=2025-12-09}}</ref><ref name=":6">{{Cite news |date=2018-11-06 |title=INS Arihant completes India's nuclear triad, PM Modi felicitates crew |url=https://economictimes.indiatimes.com/news/defence/ins-arihant-completes-indias-nuclear-triad-pm-modi-felicitates-crew/articleshow/66509959.cms |access-date=2025-12-09 |work=The Economic Times |issn=0013-0389}}</ref>


The lead vessel of the class, {{ship|INS|Arihant}} was launched in 2009, and after extensive sea trials, was confirmed to be commissioned in August 2016.<ref name=":2" /><ref name=":0">{{cite web |url=http://www.newsx.com/national/43966-what-is-ins-arihant |title=What is INS Arihant? |website=NewsX |date=17 October 2016 |author=Ashish Singh |access-date=30 October 2016 |url-status=live |archive-url=https://web.archive.org/web/20161027175800/http://www.newsx.com/national/43966-what-is-ins-arihant |archive-date=27 October 2022}}</ref><ref name="Arihant_ready">{{Cite news|title=India's first nuclear submarine INS Arihant ready or operations, passes deep sea tests|url=http://economictimes.indiatimes.com/news/defence/indias-first-nuclear-submarine-ins-arihant-ready-for-operations-passes-deep-sea-tests/articleshow/51098650.cms|newspaper=[[The Economic Times]]|date=23 February 2016|access-date=23 February 2016|url-status=live|archive-url=https://web.archive.org/web/20160224044357/http://economictimes.indiatimes.com/news/defence/indias-first-nuclear-submarine-ins-arihant-ready-for-operations-passes-deep-sea-tests/articleshow/51098650.cms|archive-date=24 February 2022}}</ref>
The lead vessel of the class, {{ship|INS|Arihant}}, was laid down in 2004, launched in 2009 and, after extensive sea trials, confirmed to be commissioned in August 2016.<ref name=":2">{{Cite news |title=India set to complete N-triad with Arihant commissioning |url=http://timesofindia.indiatimes.com/india/India-set-to-complete-N-triad-with-Arihant-commissioning/articleshow/54907081.cms |url-status=live |archive-url=https://web.archive.org/web/20161020071532/http://timesofindia.indiatimes.com/india/India-set-to-complete-N-triad-with-Arihant-commissioning/articleshow/54907081.cms |archive-date=20 October 2016 |access-date=2016-10-18 |newspaper=The Times of India}}</ref><ref name=":0">{{cite news |url=http://www.newsx.com/national/43966-what-is-ins-arihant |title=What is INS Arihant? |work=NewsX |date=17 October 2016 |author=Ashish Singh |access-date=30 October 2016 |url-status=live |archive-url=https://web.archive.org/web/20161027175800/http://www.newsx.com/national/43966-what-is-ins-arihant |archive-date=27 October 2016}}</ref><ref name="Arihant_ready">{{Cite news|title=India's first nuclear submarine INS Arihant ready or operations, passes deep sea tests|url=http://economictimes.indiatimes.com/news/defence/indias-first-nuclear-submarine-ins-arihant-ready-for-operations-passes-deep-sea-tests/articleshow/51098650.cms|newspaper=[[The Economic Times]]|date=23 February 2016|access-date=23 February 2016|url-status=live|archive-url=https://web.archive.org/web/20160224044357/http://economictimes.indiatimes.com/news/defence/indias-first-nuclear-submarine-ins-arihant-ready-for-operations-passes-deep-sea-tests/articleshow/51098650.cms|archive-date=24 February 2016}}</ref> ''Arihant'' holds the distinction of being the first ballistic missile submarine to have been built by a country other than one of the five [[permanent members of the United Nations Security Council]].<ref name=bbc2>{{cite news|last=Marcus|first=Jonathan|title=Indian-built Arihant nuclear submarine activated|url=https://www.bbc.co.uk/news/world-asia-india-23648310|access-date=12 October 2013|work=[[BBC]]|date=10 August 2013|url-status=live|archive-url=https://web.archive.org/web/20131012083819/http://www.bbc.co.uk/news/world-asia-india-23648310|archive-date=12 October 2013}}</ref> {{As of|2024|10|25|post=,}} INS ''Arihant'' and [[INS Arighaat|INS ''Arighaat'']] are already on deep sea patrols.<ref>{{Cite news |date=2024-10-24 |title=India launches its latest nuclear submarine with 75% indigenous tech: Here's what the new S4 means for regional security |url=https://economictimes.indiatimes.com/news/defence/indias-launches-its-latest-nuclear-submarine-with-75-indigenous-tech-heres-what-the-new-s4-means-for-regional-security/articleshow/114547188.cms?from=mdr |access-date=2024-10-26 |work=The Economic Times |issn=0013-0389}}</ref>
''Arihant'' holds the distinction of being the first ballistic missile submarine to have been built by a country other than one of the five [[permanent members of the United Nations Security Council]].<ref name=bbc2>{{cite news|last=Marcus|first=Jonathan|title=Indian-built Arihant nuclear submarine activated|url=https://www.bbc.co.uk/news/world-asia-india-23648310|access-date=12 October 2013|work=[[BBC]]|date=10 August 2013|url-status=live|archive-url=https://web.archive.org/web/20131012083819/http://www.bbc.co.uk/news/world-asia-india-23648310|archive-date=12 October 2022}}</ref>


==History==
==History==
In December 1971, during the [[Indo-Pakistani War of 1971]], [[U.S. President|US President]] [[Richard Nixon]] sent a [[carrier battle group]] named [[Task Force 74]], led by the nuclear-powered {{USS|Enterprise|CVN-65|6}} into the international waters of the [[Bay of Bengal]] in a show of force.<ref>{{Cite web|url=https://in.rbth.com/articles/2011/12/20/1971_war_how_russia_sank_nixons_gunboat_diplomacy_14041|title=1971 War: How Russia sank Nixon's gunboat diplomacy|website=in.rbth.com|access-date=2016-04-29|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref><ref>{{Cite web|url=http://www.thedailystar.net/news/us-fleet-in-bay-of-bengal-a-game-of-deception|title=US Fleet in Bay of Bengal: A game of deception|date=2013-12-15|website=The Daily Star|access-date=2016-04-29|url-status=live|archive-url=https://web.archive.org/web/20160504233140/http://www.thedailystar.net/news/us-fleet-in-bay-of-bengal-a-game-of-deception|archive-date=4 May 2022}}</ref> Task Force 74 remained in international waters, where it was legally entitled to be. The records of Nixon-Kissinger communications show no contingency nor any plan under which ''Enterprise'' would enter Indian or Pakistani waters, or otherwise intervene in the conflict. In response, the [[Soviet Union]] sent a submarine armed with nuclear missiles from [[Vladivostok]] to trail the US task force.<ref>{{cite news|first=Rakesh|last=Krishnan Simha|url=http://indrus.in/articles/2011/12/20/1971_war_how_russia_sank_nixons_gunboat_diplomacy_14041.html|title=US-Soviet Actions in 1971 Indo-Pakistani War|publisher=Indrus.in|date=20 December 2011|access-date=22 April 2013|work=indrus.in|url-status=live|archive-url=https://web.archive.org/web/20130408214434/http://indrus.in/articles/2011/12/20/1971_war_how_russia_sank_nixons_gunboat_diplomacy_14041.html|archive-date=8 April 2022}}</ref> The event demonstrated the significance of nuclear weapons and ballistic missile submarines to then [[Prime Minister of India|Prime Minister]] [[Indira Gandhi]].<ref name=idr-arihant>{{cite news|url=http://www.indiandefencereview.com/2010/02/arihant-the-annihilator.html|title=Arihant: the annihilator|work=Indian Defence Review|date=25 October 2010|access-date=8 January 2012|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref> Following the 1974 [[Smiling Buddha]] nuclear test, the Director of Marine Engineering (DME) at Naval Headquarters initiated a technical feasibility study for an indigenous nuclear propulsion system (Project 932).<ref>{{cite news|first=Premvir|last=Das|url=http://www.business-standard.com/article/opinion/premvir-das-ins-arihant-a-watershed-moment-109073000008_1.html|title=Project 932|newspaper=[[Business Standard]]|date=30 July 2009|access-date=24 April 2013|url-status=live|archive-url=https://web.archive.org/web/20130510021601/http://www.business-standard.com/article/opinion/premvir-das-ins-arihant-a-watershed-moment-109073000008_1.html|archive-date=10 May 2022}}</ref>
In December 1971, during the [[Indo-Pakistani War of 1971]], [[U.S. President|US President]] [[Richard Nixon]] sent a [[carrier battle group]] named [[Task Force 74]], led by the nuclear-powered {{USS|Enterprise|CVN-65|6}} into the international waters of the [[Bay of Bengal]] in a show of force.<ref>{{Cite news |url=https://www.rbth.com/articles/2011/12/20/1971_war_how_russia_sank_nixons_gunboat_diplomacy_14041|title=1971 War: How Russia sank Nixon's gunboat diplomacy|work=[[Russia Beyond]]|access-date=2016-04-29|url-status=live|archive-url=https://web.archive.org/web/20251106001855/https://www.rbth.com/articles/2011/12/20/1971_war_how_russia_sank_nixons_gunboat_diplomacy_14041|archive-date=6 November 2025}}</ref><ref>{{Cite news |url=https://www.thedailystar.net/news/us-fleet-in-bay-of-bengal-a-game-of-deception|title=US Fleet in Bay of Bengal: A game of deception|date=2013-12-15|work=The Daily Star|access-date=2016-04-29}}</ref> Task Force 74 remained in international waters, where it was legally entitled to be. The records of Nixon-Kissinger communications show no contingency nor any plan under which ''Enterprise'' would enter Indian or Pakistani waters, or otherwise intervene in the conflict but it is well known that the duo viewed Pakistan as a strong ally in that region and were silent on [[Bangladesh genocide]] committed by Pakistani military. In response, the [[Soviet Union]] sent a submarine armed with nuclear missiles from [[Vladivostok]] to trail the US task force in support of India.<ref>{{cite news|first=Rakesh|last=Krishnan Simha|url=http://indrus.in/articles/2011/12/20/1971_war_how_russia_sank_nixons_gunboat_diplomacy_14041.html|title=US-Soviet Actions in 1971 Indo-Pakistani War|publisher=Indrus.in|date=20 December 2011|access-date=22 April 2013|work=indrus.in|url-status=live|archive-url=https://web.archive.org/web/20130408214434/http://indrus.in/articles/2011/12/20/1971_war_how_russia_sank_nixons_gunboat_diplomacy_14041.html|archive-date=8 April 2013}}</ref> The event demonstrated the significance of nuclear weapons and ballistic missile submarines to then [[Prime Minister of India|Prime Minister]] [[Indira Gandhi]].<ref name="idr-arihant">{{cite news |date=25 October 2010 |title=Arihant: the annihilator |url=http://www.indiandefencereview.com/2010/02/arihant-the-annihilator.html |url-status= |archive-url=https://web.archive.org/web/20100712065231/http://www.indiandefencereview.com/2010/02/arihant-the-annihilator.html |archive-date=12 July 2010 |access-date=8 January 2012 |work=Indian Defence Review}}</ref> Following the 1974 [[Smiling Buddha]] nuclear test, the Director of Marine Engineering (DME) at Naval Headquarters initiated a technical feasibility study for an indigenous nuclear propulsion system (Project 932).<ref>{{cite news|first=Premvir|last=Das|url=http://www.business-standard.com/article/opinion/premvir-das-ins-arihant-a-watershed-moment-109073000008_1.html|title=Project 932|newspaper=[[Business Standard]]|date=30 July 2009|access-date=24 April 2013|url-status=live|archive-url=https://web.archive.org/web/20130510021601/http://www.business-standard.com/article/opinion/premvir-das-ins-arihant-a-watershed-moment-109073000008_1.html|archive-date=10 May 2013}}</ref>


The [[Indian Navy]]'s ''Advanced Technology Vessel'' project to design and construct a nuclear submarine took shape in the 1990s.<ref>{{cite web|url=https://fas.org/nuke/guide/india/sub/ssn/index.html|title=India's SNS Project Report|publisher=Fas.org|access-date=24 April 2013|url-status=live|archive-url=https://web.archive.org/web/20121023210937/http://www.fas.org/nuke/guide/india/sub/ssn/index.html|archive-date=23 October 2022}}</ref> Then [[Defence Minister of India|Defence Minister]] [[George Fernandes]] confirmed the project in 1998.<ref>{{cite news|url=http://www.indianexpress.com/res/web/pIe/ie/daily/19980519/13950884.html|title=George defends position on China|work=[[Indian Express]]|date=19 May 1998|access-date=24 February 2011|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref> The initial intent of the project was to design nuclear-powered fast attack submarines, though following [[Pokhran-II|nuclear tests conducted by India in 1998]] at [[Pokhran Test Range]] and the Indian pledge of [[no first use]], the project was re-aligned towards the design of a ballistic missile submarine in order to complete India's [[nuclear triad]].<ref name=gs-atv>{{cite web|first=John|last=Pike|url=http://www.globalsecurity.org/military/world/india/atv.htm|title=Advanced Technology Vessel (ATV)|publisher=Globalsecurity.org|access-date=24 January 2011|archive-url= https://web.archive.org/web/20101226032637/http://www.globalsecurity.org/military/world/india/atv.htm| archive-date= 26 December 2022}}</ref><ref name=dna-induction>{{cite news|url=http://www.dnaindia.com/india/report_first-indigenous-nuclear-sub-is-inducted-into-the-navy_1277218|title=First indigenous nuclear sub is inducted into the navy|newspaper=DNA|date=26 July 2009|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20090729054243/http://www.dnaindia.com/india/report_first-indigenous-nuclear-sub-is-inducted-into-the-navy_1277218|archive-date=29 July 2022}}</ref><ref>{{cite news|url=http://www.rediff.com/news/2001/feb/16josy4.htm|title=India's nuclear sub still a distant dream|work=[[Rediff]]|date=16 February 2001|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20121022063031/http://www.rediff.com/news/2001/feb/16josy4.htm|archive-date=22 October 2022}}</ref>
The [[Indian Navy]]'s ''Advanced Technology Vessel'' project to design and construct a nuclear submarine took shape in the 1990s.<ref>{{cite web |title=India's SNS Project Report |url=https://fas.org/nuke/guide/india/sub/ssn/index.html |url-status= |archive-url=https://web.archive.org/web/20121023210937/http://www.fas.org/nuke/guide/india/sub/ssn/index.html |archive-date=23 October 2012 |access-date=24 April 2013 |publisher=Fas.org}}</ref> Then [[Defence Minister of India|Defence Minister]] [[George Fernandes]] confirmed the project in 1998.<ref>{{cite news |date=19 May 1998 |title=George defends position on China |url=http://www.indianexpress.com/res/web/pIe/ie/daily/19980519/13950884.html |url-status= |archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece |archive-date=13 June 2016 |access-date=24 February 2011 |work=[[Indian Express]]}}</ref> The initial intent of the project was to design nuclear-powered fast attack submarines, though following [[Pokhran-II|nuclear tests conducted by India in 1998]] at [[Pokhran Test Range]] and the Indian pledge of [[no first use]], the project was re-aligned towards the design of a ballistic missile submarine in order to complete India's [[nuclear triad]].<ref name=gs-atv>{{cite web|first=John|last=Pike|url=http://www.globalsecurity.org/military/world/india/atv.htm|title=Advanced Technology Vessel (ATV)|publisher=Globalsecurity.org|access-date=24 January 2011|archive-url= https://web.archive.org/web/20101226032637/http://www.globalsecurity.org/military/world/india/atv.htm| archive-date= 26 December 2010}}</ref><ref name=dna-induction>{{cite news|url=http://www.dnaindia.com/india/report_first-indigenous-nuclear-sub-is-inducted-into-the-navy_1277218|title=First indigenous nuclear sub is inducted into the navy|newspaper=DNA|date=26 July 2009|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20090729054243/http://www.dnaindia.com/india/report_first-indigenous-nuclear-sub-is-inducted-into-the-navy_1277218|archive-date=29 July 2009}}</ref><ref>{{cite news|url=http://www.rediff.com/news/2001/feb/16josy4.htm|title=India's nuclear sub still a distant dream|work=[[Rediff]]|date=16 February 2001|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20121022063031/http://www.rediff.com/news/2001/feb/16josy4.htm|archive-date=22 October 2012}}</ref>


==Description==
==Description==
The ''Arihant''-class submarines are nuclear powered [[ballistic missile submarine]]s built under the ''[[Advanced Technology Vessel]]'' (ATV) project.<ref name="domain-b.com">{{cite web|url=http://www.domain-b.com/defence/general/20090716_indian_indigenous.html|title=Indian indigenous nuclear sub to be unveiled on 26 July: report|publisher=domain-b.com|date=16 July 2009|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20110921135024/http://www.domain-b.com/defence/general/20090716_indian_indigenous.html|archive-date=21 September 2022}}</ref><ref>{{cite news|url=http://in.reuters.com/article/companyNews/idINISL35153320090212|title=India nuclear sub project near completion|work=[[Reuters]]|date=12 February 2009|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref><ref name="launch1">{{cite news|url=http://news.in.msn.com/national/article.aspx?cp-documentid=3097464|archive-url=https://archive.today/20130104175719/http://news.in.msn.com/national/article.aspx?cp-documentid=3097464|url-status=dead|archive-date=4 January 2013|title=PM to launch indigenous nuke submarine by month-end|date=16 July 2009|work=[[MSN]]|access-date=19 July 2022}}</ref><ref name="launch2">{{cite news|url=http://www.hindu.com/2009/07/19/stories/2009071958490500.htm|title=Indigenous nuclear submarine goes on trial|newspaper=[[The Hindu]]|access-date=19 July 2009|location=Chennai, India|date=19 July 2009|url-status=dead|archive-url=https://web.archive.org/web/20090722084642/http://www.hindu.com/2009/07/19/stories/2009071958490500.htm|archive-date=22 July 2022}}</ref><ref>{{cite news|first=Hari|last=Sud|url=http://www.upiasia.com/Security/2009/08/14/indias_nuclear_submarine_and_the_indian_ocean/7676/|title=India's nuclear submarine and the Indian Ocean|publisher=upiasia.com|date=14 August 2009|access-date=24 January 2011|url-status=live|archive-url=https://web.archive.org/web/20110728133202/http://www.upiasia.com/Security/2009/08/14/indias_nuclear_submarine_and_the_indian_ocean/7676/|archive-date=28 July 2022}}</ref><ref>{{cite news|url=http://blogs.reuters.com/india/2009/07/31/indias-nuclear-submarine-dream-still-miles-to-go/|work=[[Reuters]]|title=India's nuclear submarine dream, still miles to go|date=31 July 2009|access-date=24 January 2011|url-status=dead|archive-url=https://web.archive.org/web/20110525082031/http://blogs.reuters.com/india/2009/07/31/indias-nuclear-submarine-dream-still-miles-to-go|archive-date=25 May 2022}}</ref> They will be the first nuclear submarines designed and built by India.<ref name=it-finaltest>{{cite news|url=http://indiatoday.intoday.in/story/Final+test+of+K-15+ballistic+missile+on+Tuesday/1/5002.html|title=Final test of K-15 ballistic missile on Tuesday|date=25 February 2008|access-date=24 January 2012|url-status=live|archive-url=https://web.archive.org/web/20120921085654/http://indiatoday.intoday.in/story/Final%20test%20of%20K-15%20ballistic%20missile%20on%20Tuesday/1/5002.html|archive-date=21 September 2022}}</ref> The submarines are {{convert|111|m|abbr=on|}} [[Length overall|long]] with a [[Beam (nautical)|beam]] of {{convert|11|m|abbr=on}}, a [[Draught (ship)|draught]] of {{convert|15|m|abbr=on|}}, displacement of {{convert|6000|t}}.<ref name="NuclearArm">{{cite magazine|last=Subramanian|first=T.S.|date=15 August 2009|title=Nuclear Arm|url=http://www.hindu.com/fline/fl2617/stories/20090828261702500.htm|magazine=The Frontline|volume=26|issue=17|archive-url=https://web.archive.org/web/20130526061306/http://www.hindu.com/fline/fl2617/stories/20090828261702500.htm|archive-date=26 May 2013|access-date=2 June 2015|url-status=live}}</ref> The complement is about 95, including officers and sailors.<ref name="navaltech">{{cite web|url=http://www.naval-technology.com/projects/arihant-class/|title=SSBN Arihant Class Submarine, India|publisher=naval-technology.com|access-date=22 April 2013|url-status=live|archive-url=https://web.archive.org/web/20130502115614/http://www.naval-technology.com/projects/arihant-class|archive-date=2 May 2022}}</ref> The boats are powered by a single seven blade propeller powered by an 83 MW [[pressurised water reactor]] and can achieve a maximum speed of {{convert|12|-|15|kn|km/h}} when surfaced and {{convert|24|kn|km/h}} when submerged.<ref name="navaltech"/><ref>{{Cite web|url=https://www.naval-technology.com/projects/arihant-class/#:~:text=Arihant%20design,up%20to%2024kt%20when%20submerged.|title = Arihant Class Submarine - Naval Technology}}</ref>
[[File:Prime Minister Narendra Modi receiving the crew of INS Arihant.jpg|left|thumb|PM [[Narendra Modi]] addressing the crew of INS ''Arihant''. Note the picture of the submarine in the background.]]
[[File:B05 SLBM.jpg|left|180px|thumb|[[Sagarika (missile)|Sagarika SLBM]]]]
The ''Arihant''-class submarines are nuclear-powered [[ballistic missile submarine]]s built under the Advanced Technology Vessel (ATV) project.<ref name=":12">{{cite news |date=27 July 2009 |title=Nuclear submarine Arihant to be fitted with K-15 ballistic missiles |url=http://www.hindu.com/2009/07/27/stories/2009072755801000.htm |url-status= |archive-url=https://web.archive.org/web/20090729200214/http://www.hindu.com/2009/07/27/stories/2009072755801000.htm |archive-date=29 July 2009 |access-date=17 March 2016 |newspaper=[[The Hindu]] |location=Chennai, India}}</ref> Originally, three submarines were to be built under the ATV project, which itself is part of a larger programme to construct five [[nuclear submarines]]<ref name=":11" /> for the Indian Navy. Later, a fourth submarine was added<ref name="India Today3" /> to the {{INRConvert|30000|c|lk=on|year=2009|mode=historical}}-worth project.<ref name="toi-ntriad2" /> These are the first nuclear submarines designed and built by India.<ref name=it-finaltest>{{cite news|url=https://www.indiatoday.in/latest-headlines/story/final-test-of-k-15-ballistic-missile-on-tuesday-23129-2008-02-25|title=Final test of K-15 ballistic missile on Tuesday|date=25 February 2008|access-date=24 January 2012|url-status=live|archive-url=https://web.archive.org/web/20120921085654/http://indiatoday.intoday.in/story/Final%20test%20of%20K-15%20ballistic%20missile%20on%20Tuesday/1/5002.html|archive-date=21 September 2012}}</ref> The total cost of the project had hiked to {{INRConvert|90000|c|lk=|year=2017|mode=historical}} by 2017.<ref name="India Today3" />
The submarines have four launch tubes in their hump and can carry up to twelve [[Sagarika (missile)|K-15 Sagarika]] missiles with one warhead each (with a range of {{convert|750|km|abbr=on|disp=or}}) or four [[K-4 (SLBM)|K-4]] missiles (with a range of {{convert|3500|km|abbr=on|disp=or}}).<ref name=it-undersea>{{cite news|url=http://indiatoday.intoday.in/story/The+secret+undersea+weapon/1/3659.html|title=The secret undersea weapon|work=[[India Today]]|date=17 January 2008|access-date=8 January 2012|url-status=live|archive-url=https://web.archive.org/web/20111231120048/http://indiatoday.intoday.in/story/The%20secret%20undersea%20weapon/1/3659.html|archive-date=31 December 2022}}</ref><ref>{{Cite news|url=https://wap.business-standard.com/article-amp/specials/how-india-s-pride-ins-arihant-was-built-113081100745_1.html|title=How Indias pride INS Arihant was built|newspaper=Business Standard India|date=12 August 2013|last1=Malhotra|first1=Jyoti}}</ref><ref name=it-secretk>{{cite news|url=http://indiatoday.intoday.in/site/story/the-secret-k-missile-family/1/120488.html|work=[[India Today]]|title=The secret 'K' missile family|date=20 November 2010|access-date=8 January 2012|url-status=live|archive-url=https://web.archive.org/web/20110807075726/http://indiatoday.intoday.in/site/story/the-secret-k-missile-family/1/120488.html|archive-date=7 August 2022}}</ref> The third and fourth submarines will have a larger configuration, carrying twenty-four K-15 Sagarika or eight K-4 missiles.<ref name="India Today3">{{cite news|url=http://indiatoday.intoday.in/story/india-ballistic-missile-submarine-k-6-submarine-launched-drdo/1/1104982.html|title=A peek into India's top secret and costliest defence project, nuclear submarines|last=Unnithan|first=Sandeep|date=7 December 2017|work=[[India Today]]|access-date=11 December 2017|url-status=live|archive-url=https://web.archive.org/web/20171211024434/http://indiatoday.intoday.in/story/india-ballistic-missile-submarine-k-6-submarine-launched-drdo/1/1104982.html|archive-date=11 December 2022}}</ref> The Indian Navy will train on {{INS|Chakra|2011|6}}, an Akula-class submarine leased from Russia in 2012.<ref name=autogenerated1>{{cite web|url=http://www.globalsecurity.org/military/world/india/atv.htm|title=Arihant – Advanced Technology Vessel (ATV)|publisher=Global Security|access-date=8 January 2012|url-status=live|archive-url=https://web.archive.org/web/20120110182851/http://www.globalsecurity.org/military/world/india/atv.htm|archive-date=10 January 2022}}</ref><ref name=it-setsail>{{cite news|url=http://indiatoday.intoday.in/story/leased-russian-n-submarine-to-set-sail-for-india-this-month-end/1/164449.html|title=Leased Russian n-submarine to set sail for India this month end|date=15 December 2011|access-date=8 January 2012|url-status=live|archive-url=https://web.archive.org/web/20120105102758/http://indiatoday.intoday.in/story/leased-russian-n-submarine-to-set-sail-for-india-this-month-end/1/164449.html|archive-date=5 January 2022}}</ref>


The submarine's K-15 missiles can reach most of Pakistan and it's K-4 can target all of Pakistan.<ref name=nathan/> The K-4 may also be capable of targeting [[Beijing]], but would need to be in the northern most waters of [[Bay of Bengal]].<ref name=nathan/> Deployment of the Arihant to the Pacific Ocean is unlikely given the submarine's noise issues.<ref name=nathan>{{cite journal|title=The Arihant-Class SSBN and the Advent of Sea-Based Nuclear Forces in India, China, and Pakistan|author=Nathan Powell|journal=Project on Nuclear Issues: A Collection of Papers from the 2017 Conference Series and Nuclear Scholars Initiative|page=141-142}}</ref>
The first two submarines are {{convert|111.6|m|abbr=on}} [[Length overall|long]]<ref name=":16" /> with a [[Beam (nautical)|beam]] of {{convert|11|m|abbr=on}}, a [[Draught (ship)|draught]] of {{convert|15|m|abbr=on}}, displacement of {{convert|6000|t}}.<ref name="NuclearArm">{{cite magazine|last=Subramanian|first=T.S.|date=15 August 2009|title=Nuclear Arm|url=http://www.hindu.com/fline/fl2617/stories/20090828261702500.htm|magazine=The Frontline|volume=26|issue=17|archive-url=https://web.archive.org/web/20130526061306/http://www.hindu.com/fline/fl2617/stories/20090828261702500.htm|archive-date=26 May 2013|access-date=2 June 2015|url-status=live}}</ref> The latter submarines included an additional {{convert|10|m|abbr=on}}-long section of four launch tubes increasing the displacement by {{convert|1000|t}}.<ref name="India Today3" /> The complement is about 95, including officers and sailors.<ref name="navaltech">{{cite web|url=http://www.naval-technology.com/projects/arihant-class/|title=SSBN Arihant Class Submarine, India|publisher=naval-technology.com|access-date=22 April 2013|url-status=live|archive-url=https://web.archive.org/web/20130502115614/http://www.naval-technology.com/projects/arihant-class|archive-date=2 May 2013}}</ref> The boats are powered by a single seven blade propeller powered by an 82.5<ref name=":16">{{Cite web |last=Bedi |first=Rahul |date=2020-12-22 |title=India to commission second Arihant-class submarine in 2021 |url=https://www.janes.com/osint-insights/defence-news/india-to-commission-second-arihant-class-submarine-in-2021 |access-date=2025-12-23 |website=Janes |language=en}}</ref>&nbsp;[[MWe]]-rated [[pressurised water reactor|pressurised light-water reactor]] (PWR)<ref name="pwr_1" /> and can achieve a maximum speed of {{convert|12|-|15|kn|km/h}} when surfaced and {{convert|24|kn|km/h}} when submerged.<ref name="navaltech" /><ref>{{Cite web|url=https://www.naval-technology.com/projects/arihant-class/#:~:text=Arihant%20design,up%20to%2024kt%20when%20submerged.|title = Arihant Class Submarine - Naval Technology}}</ref>
 
The submarines, being constructed at the Ship Building Centre (SBC), [[Visakhapatnam]] using a US [[HY-80]] grade equivalent Russian steel, has two compartments including propulsion and combat management systems, platform management centre, and the torpedo room. The vessels feature a double hull encompassing [[ballast tanks]], two standby auxiliary engines, and a retractable thruster for emergency power and mobility.<ref name=":16" />
[[File:B05 SLBM.jpg|thumb|[[Sagarika (missile)|Sagarika SLBM]]]]
The initial batch of two submarines have four launch tubes in their hump and can carry up to twelve [[Sagarika (missile)|K-15 Sagarika]] missiles with one warhead each (with a range of {{convert|750|km|abbr=on|disp=or}}) or four [[K-4 (SLBM)|K-4]] missiles (with a range of {{convert|3500|km|abbr=on|disp=or}}).<ref name=it-undersea>{{cite news|url=https://www.indiatoday.in/magazine/defence/story/20080128-the-secret-undersea-weapon-735178-2008-01-17|title=The secret undersea weapon|work=[[India Today]]|date=17 January 2008|access-date=8 January 2012|url-status=live|archive-url=https://web.archive.org/web/20111231120048/http://indiatoday.intoday.in/story/The%20secret%20undersea%20weapon/1/3659.html|archive-date=31 December 2011}}</ref><ref>{{Cite news|url=https://wap.business-standard.com/article-amp/specials/how-india-s-pride-ins-arihant-was-built-113081100745_1.html|title=How Indias pride INS Arihant was built|newspaper=Business Standard India|date=12 August 2013|last1=Malhotra|first1=Jyoti}}</ref><ref name=it-secretk>{{cite news|url=https://www.indiatoday.in/magazine/the-big-story/story/20101129-the-secret-k-missile-family-744797-2010-11-19|work=[[India Today]]|title=The secret 'K' missile family|date=20 November 2010|access-date=8 January 2012|url-status=live|archive-url=https://web.archive.org/web/20110807075726/http://indiatoday.intoday.in/site/story/the-secret-k-missile-family/1/120488.html|archive-date=7 August 2011}}</ref> The third and fourth submarines, featuring ''Arihant'' Stretch design,<ref name=":21" /> will have a larger configuration, carrying twenty-four K-15 Sagarika or eight K-4 missiles, due to the addition of four launch tubes.<ref name="India Today3">{{cite news|url=https://www.indiatoday.in/magazine/the-big-story/story/20171218-india-ballistic-missile-submarine-k-6-submarine-launched-drdo-1102085-2017-12-10|title=A peek into India's top secret and costliest defence project, nuclear submarines|last=Unnithan|first=Sandeep|date=7 December 2017|work=[[India Today]]|access-date=11 December 2017|url-status=live|archive-url=https://web.archive.org/web/20171211024434/http://indiatoday.intoday.in/story/india-ballistic-missile-submarine-k-6-submarine-launched-drdo/1/1104982.html|archive-date=11 December 2017}}</ref> The Indian Navy personnel received training on {{INS|Chakra|2011|6}}, an {{Sclass|Akula|submarine}} leased from Russia in 2012.<ref name=autogenerated1>{{cite web|url=http://www.globalsecurity.org/military/world/india/atv.htm|title=Arihant – Advanced Technology Vessel (ATV)|publisher=Global Security|access-date=8 January 2012|url-status=live|archive-url=https://web.archive.org/web/20120110182851/http://www.globalsecurity.org/military/world/india/atv.htm|archive-date=10 January 2012}}</ref><ref name=it-setsail>{{cite news|url=https://www.indiatoday.in/india/invisible-india/story/leased-russian-n-submarine-to-set-sail-for-india-this-month-end-148919-2011-12-14|title=Leased Russian n-submarine to set sail for India this month end|date=15 December 2011|access-date=8 January 2012|url-status=live|archive-url=https://web.archive.org/web/20120105102758/http://indiatoday.intoday.in/story/leased-russian-n-submarine-to-set-sail-for-india-this-month-end/1/164449.html|archive-date=5 January 2012}}</ref>
 
The submarine's K-15 missiles can reach most of Pakistan and its K-4 can target all of Pakistan.<ref name=nathan/> The K-4 may also be capable of targeting [[Beijing]], but would need to be in the northern most waters of [[Bay of Bengal]].<ref name=nathan/> Deployment of the Arihant to the Pacific Ocean is unlikely given the submarine's noise issues.<ref name=nathan>{{cite journal|title=The Arihant-Class SSBN and the Advent of Sea-Based Nuclear Forces in India, China, and Pakistan|author=Nathan Powell|journal=Project on Nuclear Issues: A Collection of Papers from the 2017 Conference Series and Nuclear Scholars Initiative|pages=141–142}}</ref>


==Development==
==Development==
The submarines are powered by a [[pressurised water reactor]] with [[highly enriched uranium]] fuel.<ref name=toi-20090717>{{cite news|url=http://articles.timesofindia.indiatimes.com/2009-07-17/india/28203215_1_nuclear-powered-submarine-atv-project-ins-arihant|newspaper=[[The Times of India]]|first=Rajat|last=Pandit|title=India set to launch nuclear-powered submarine|date=17 July 2009|access-date=17 March 2016|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref><ref>{{cite news|url=http://www.hindu.com/seta/2009/11/05/stories/2009110551721200.htm|title=High fissile fuel in nuclear submarine lasts long|newspaper=[[The Hindu]]|date=5 November 2009|access-date=17 March 2016|location=Chennai, India|url-status=dead|archive-url=https://web.archive.org/web/20121105132403/http://www.hindu.com/seta/2009/11/05/stories/2009110551721200.htm|archive-date=5 November 2022}}</ref> The miniaturised version of the reactor was designed and built by the [[Bhabha Atomic Research Centre]] (BARC) at the [[Indira Gandhi Centre for Atomic Research]] (IGCAR) in [[Kalpakkam]].<ref name=hindu-indiandesign>{{cite news|url=http://www.hindu.com/2009/08/16/stories/2009081655260900.htm|title=INS Arihant is an Indian design: Anil Kakodkar|newspaper=[[The Hindu]]|date=16 August 2009|access-date=17 March 2016|location=Chennai, India|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref> It included a {{convert|42|m|ft|adj=on}} section of the submarine's pressure hull containing the shielding tank with water and the reactor, a control room, as well as an auxiliary control room for monitoring safety parameters.<ref>{{cite news|url=http://www.telegraphindia.com/1090803/jsp/nation/story_11313999.jsp|title=Unveiled: Arihant's elder brother|work=Telegraph India|date=3 August 2009|access-date=17 March 2016|location=Calcutta, India|first=G.C.|last=Shekhar|url-status=live|archive-url=https://web.archive.org/web/20160117011504/http://www.telegraphindia.com/1090803/jsp/nation/story_11313999.jsp|archive-date=17 January 2022}}</ref> The prototype reactor became critical on 11 November 2003 and was declared operational on 22 September 2006.<ref name=idr-arihant/> Successful operation of the prototype for three years enabled the production version of the reactor for ''Arihant''.<ref name="pwr_1">{{cite news|url=http://www.hindu.com/2009/08/03/stories/2009080353810100.htm |title=PWR building shows indigenous capability |first=T.S. |last=Subramanian |date=2 August 2009 |newspaper=[[The Hindu]] |access-date=17 March 2016 |location=Chennai, India |url-status=dead |archive-url=https://web.archive.org/web/20090808043941/http://www.hindu.com/2009/08/03/stories/2009080353810100.htm |archive-date=8 August 2022}}</ref><ref name="pwr_2">{{cite news|url=http://www.hindustantimes.com/StoryPage/StoryPage.aspx?sectionName=HomePage&id=5721403d-8f66-43e2-92c4-4f3148032565&Headline=Arihant+propulsion+reactor+unveiled|title=Arihant propulsion reactor unveiled|first=M.R.|last=Venkatesh|date=2 August 2009|access-date=17 March 2016|newspaper=[[Hindustan Times]]}}{{dead link|date=August 2021|bot=medic}}{{cbignore|bot=medic}}</ref> The reactor subsystems were tested at the Machinery Test Center in [[Visakhapatnam]].<ref>{{cite web|url=http://www.nrbdrdo.res.in/nstl.html|title=Naval Research Board|publisher=DRDO|access-date=17 March 2016|url-status=dead|archive-url=https://web.archive.org/web/20160316234337/http://www.nrbdrdo.res.in/nstl.html|archive-date=16 March 2022}}</ref> Facilities for loading and replacing the fuel cores of the naval reactors in berthed submarines were also established.<ref name=idr-arihant/> The prototype 83 MW light water reactor that was installed at [[Kalpakkam]] by BARC is codenamed S1 and is used to train nuclear submariners.<ref name="India Today3" />
[[File:Arihant 1.svg|thumb|right|Conceptual drawing of INS ''Arihant'']]
The [[Classified information|classified]] project is headquartered in [[New Delhi]] and remains under direct supervision of the [[Prime Minister's Office (India)|Prime Minister's Office]] and the [[National Security Advisor (India)|National Security Advisor]].<ref name="India Today3" /> The submarines are powered by a [[pressurised water reactor]] with [[highly enriched uranium]] fuel.<ref name=toi-20090717>{{cite news|url=https://timesofindia.indiatimes.com/india/India-set-to-launch-nuclear-powered-submarine/articleshow/4787167.cms|newspaper=[[The Times of India]]|first=Rajat|last=Pandit|title=India set to launch nuclear-powered submarine|date=17 July 2009|access-date=17 March 2016|url-status=live|archive-url=https://web.archive.org/web/20250412082730/https://timesofindia.indiatimes.com/india/India-set-to-launch-nuclear-powered-submarine/articleshow/4787167.cms|archive-date=12 April 2025}}</ref><ref>{{cite news|url=http://www.hindu.com/seta/2009/11/05/stories/2009110551721200.htm|title=High fissile fuel in nuclear submarine lasts long|newspaper=[[The Hindu]]|date=5 November 2009|access-date=17 March 2016|location=Chennai, India|url-status=dead|archive-url=https://web.archive.org/web/20121105132403/http://www.hindu.com/seta/2009/11/05/stories/2009110551721200.htm|archive-date=5 November 2012}}</ref> The miniaturised version of the reactor was designed and built by the [[Bhabha Atomic Research Centre]] (BARC) at the [[Indira Gandhi Centre for Atomic Research]] (IGCAR) in [[Kalpakkam]].<ref name="hindu-indiandesign">{{cite news |date=16 August 2009 |title=INS Arihant is an Indian design: Anil Kakodkar |url=http://www.hindu.com/2009/08/16/stories/2009081655260900.htm |url-status= |archive-url=https://web.archive.org/web/20090819135707/http://www.hindu.com/2009/08/16/stories/2009081655260900.htm |archive-date=19 August 2009 |access-date=17 March 2016 |newspaper=[[The Hindu]] |location=Chennai, India}}</ref> It included a {{convert|42|m|ft|adj=on}} section of the submarine's pressure hull containing the shielding tank with water and the reactor, a control room, as well as an auxiliary control room for monitoring safety parameters.<ref>{{cite news|url=http://www.telegraphindia.com/1090803/jsp/nation/story_11313999.jsp|title=Unveiled: Arihant's elder brother|work=Telegraph India|date=3 August 2009|access-date=17 March 2016|location=Calcutta, India|first=G.C.|last=Shekhar|url-status=dead|archive-url=https://web.archive.org/web/20160117011504/http://www.telegraphindia.com/1090803/jsp/nation/story_11313999.jsp|archive-date=17 January 2016}}</ref> The prototype reactor became critical on 11 November 2003 and was declared operational on 22 September 2006.<ref name=idr-arihant/> Successful operation of the prototype for three years enabled the production version of the reactor for ''Arihant''.<ref name="pwr_1">{{cite news|url=http://www.hindu.com/2009/08/03/stories/2009080353810100.htm |title=PWR building shows indigenous capability |first=T.S. |last=Subramanian |date=2 August 2009 |newspaper=[[The Hindu]] |access-date=17 March 2016 |location=Chennai, India |url-status=dead |archive-url=https://web.archive.org/web/20090808043941/http://www.hindu.com/2009/08/03/stories/2009080353810100.htm |archive-date=8 August 2009}}</ref><ref name="pwr_2">{{cite news|url=http://www.hindustantimes.com/StoryPage/StoryPage.aspx?sectionName=HomePage&id=5721403d-8f66-43e2-92c4-4f3148032565&Headline=Arihant+propulsion+reactor+unveiled|title=Arihant propulsion reactor unveiled|first=M.R.|last=Venkatesh|date=2 August 2009|access-date=17 March 2016|newspaper=[[Hindustan Times]]}}{{dead link|date=August 2021|bot=medic}}{{cbignore|bot=medic}}</ref> The reactor subsystems were tested at the Machinery Test Center in [[Visakhapatnam]].<ref>{{cite web|url=http://www.nrbdrdo.res.in/nstl.html|title=Naval Research Board|publisher=DRDO|access-date=17 March 2016|url-status=dead|archive-url=https://web.archive.org/web/20160316234337/http://www.nrbdrdo.res.in/nstl.html|archive-date=16 March 2016}}</ref> Facilities for loading and replacing the fuel cores of the naval reactors in berthed submarines were also established.<ref name=idr-arihant/> The prototype 83 MW light water reactor that was installed at [[Kalpakkam]] by BARC is codenamed S1 and is used to train nuclear submariners.<ref name="India Today3" />
 
[[Larsen & Toubro]] undertook critical [[detailed engineering]] based on design provided by the Navy and [[DRDO]] at its submarine design centre. The firm was also the single largest contributor to the programme ranging from the steel cutting of the submarines to their launch.<ref>{{cite press release|url=http://www.larsentoubro.com/lntcorporate/LnT_PRS/PDF/L&TPressRelease-Jul26-2009.pdf|title=Larsen and Toubro's Contribution to Arihant-class submarine|date=26 July 2009|access-date=17 March 2016}}{{Dead link|date=November 2019 |bot=InternetArchiveBot |fix-attempted=yes }}</ref><ref>{{Cite news |date=2009-07-27 |title=We played a vital role in Arihant: L&T |url=https://www.business-standard.com/article/economy-policy/we-played-a-vital-role-in-arihant-l-t-109072700002_1.html |access-date=2026-01-17 |work=[[Business Standard]]}}</ref> The facility served as the site for hull construction. [[Tata Power SED]] built the control systems for the submarine.<ref>{{cite web|title=India's first Indigenous nuclear submarine |url=http://www.jeywin.com/blog/arihant-–-india’s-first-indigenous-nuclear-submarine/|publisher=Jeywin|access-date=24 April 2013 |url-status=dead|archive-url=https://archive.today/20130217054406/http://www.jeywin.com/blog/arihant-%E2%80%93-india%E2%80%99s-first-indigenous-nuclear-submarine/|archive-date=17 February 2013 }}</ref> The steam turbines and associated systems integrated with the reactor were supplied by [[Walchandnagar Industries]]. Former [[Prime Minister of India]], [[Manmohan Singh]], had lauded ATV project as a "productive [[public–private partnership]]".<ref name="dna-ppp">{{cite news |url=http://www.dnaindia.com/india/report_private-sector-played-a-major-role-in-arihant_1277435 |title=Private sector played a major role in Arihant |newspaper=DNA |date=27 April 2009 |access-date=17 March 2016 |url-status=live |archive-url=https://web.archive.org/web/20120916225008/http://www.dnaindia.com/india/report_private-sector-played-a-major-role-in-arihant_1277435 |archive-date=16 September 2012}}</ref>
 
In 2006, a high-level committee led by [[R. Chidambaram]], the then [[Principal Scientific Adviser to the Government of India|principal scientific advisor to the Government of India]], had assessed India's ability to construct three [[S5-class submarine|S5 series of SSBNs]]. The project with a budget of {{INRConvert|10000|c|lk=on|year=2006}} divided among [[DRDO]], [[Bhabha Atomic Research Centre|BARC]] and the ATV headquarters. The construction would tentatively begin in 2015 followed with the first submarine to be deployed in 2021. Its projected specifications of the submarine included [[Displacement (ship)|displacement]] of {{Convert|13500|t|abbr=on}}, 12 [[Vertical launching system|VLS]] with an [[MIRV]]-equipped [[SLBM]] with a range of {{Convert|6000|km|abbr=on}}. The missile later evolved as [[K-6 (missile)|K-6]] ballistic missile.<ref name="India Today3" />
 
Around 2007, the then [[Minister of Finance (India)|finance minister]], [[P. Chidambaram]], who was a member of the political committee which monitors the ATV programme, questioned the huge amount of money being spent on submarines with just 4 missile launch tubes. Thereafter, the ATV project team evolved the design into ''Arihant''-stretch.<ref name=":21">{{Cite web |date=2025-12-03 |title=Indian Navy Ups the Stakes With Newest Nuclear Submarine INS Aridaman |url=https://thewire.in/security/indian-navy-ups-the-stakes-with-newest-nuclear-submarine-ins-aridaman |access-date=2026-01-12 |website=The Wire |language=en |quote=This length increase – earning it the nickname “Arihant Stretch” in overseas naval circles – was to accommodate an expanded vertical missile launch system, now doubled to eight tubes, enabling the SSBN to carry either eight K-4 submarine-launched ballistic missiles (SLBMs), with a range of 3,500 km, or 24 K-15 SLBMs striking 750 km away.}}</ref> The improved design incorporated a 10-metre-long section for four more missile tubes to be equipped with [[K-4 (missile)|K-4]] SLBMs. This design would be applied to S4 boat.<ref name="India Today3" /> The boat can, hence, accommodate 24 B-05 short-range missiles or 8 K-4 long-range missiles.<ref name=":21" /><ref>{{Cite web |last=Mundhra |first=Shreya |date=2022-01-02 |title=Boosting Indian Navy's Firepower, DRDO Launches Nuclear Submarine With 'Vertical Launch System' |url=https://www.eurasiantimes.com/indian-navy-launches-3rd-arihant-class-nuclear-submarine/ |access-date=2024-02-01 |website=Latest Asian, Middle-East, EurAsian, Indian News |language=en-US}}</ref>
 
On 24 December 2009, the [[Hindustan Shipyard]], located at Visakhapatnam, was transferred from the [[Ministry of Shipping (India)|Ministry of Shipping]] to the [[Ministry of Defence (India)|Ministry of Defence]] to support the construction of ''Arihant''-class submarine programme. This would help in utilising the shipyard's infrastructure in the project.<ref name="Sharma">{{cite web |author=Sharma |first=Suman |date=12 June 2010 |title=Navy creating a new base for nuke submarines |url=http://www.dnaindia.com/india/report_navy-creating-a-new-base-for-nuke-submarines_1395220 |url-status=live |archive-url=https://web.archive.org/web/20260112120004/https://www.dnaindia.com/india/report-navy-creating-a-new-base-for-nuke-submarines-1395220 |archive-date=2026-01-12 |access-date=11 June 2010 |work= |publisher=Daily News & Analysis}}</ref><ref>{{cite news |date=24 December 2009 |title=On national security interests, Govt moves Hindustan Shipyard to Defence ministry |url=https://timesofindia.indiatimes.com/india/On-national-security-interests-Govt-moves-Hindustan-Shipyard-to-Defence-ministry/articleshow/5373703.cms |url-status=live |archive-url=https://web.archive.org/web/20120926143826/http://articles.timesofindia.indiatimes.com/2009-12-24/india/28091316_1_hindustan-shipyard-defence-ministry-hsl |archive-date=26 September 2012 |access-date=11 June 2010 |work=[[The Times of India]] |agency=PTI}}</ref>
 
Around 2012, with the S5 project remaining in developmental stage, another ''Arihant''-class submarine was cleared for production to avoid idling of the [[production line]]. The new unit was designated as S4* (between S4 and S5). The boat would also feature the ''Arihant'' Stretch design.<ref name="India Today3" />
 
In December 2014, the work on a second nuclear reactor began and {{INS|Arighaat}} started [[sea trial]]s in 2017. As per reports released in August 2024, INS Arighaat was commissioned before October 2024.<ref name=":82">{{Cite news |date=2024-08-11 |title=India 'fully ready' to add to fleet 2nd submarine with nuclear-tipped missiles |url=https://timesofindia.indiatimes.com/india/india-fully-ready-to-add-to-fleet-2nd-sub-with-n-tipped-missiles/articleshow/112433199.cms |access-date=2024-08-11 |work=The Times of India |issn=0971-8257}}</ref><ref name=":72">{{Cite news |date=2024-08-11 |title=India set to commission its second nuclear-missile submarine |url=https://economictimes.indiatimes.com/news/defence/india-set-to-commission-its-second-nuclear-missile-submarine/articleshow/112438432.cms?from=mdr |access-date=2024-08-12 |work=The Economic Times |issn=0013-0389}}</ref> On 29 August 2024, after extensive trials and upgrades INS Arighaat was formally commissioned.<ref name=":9" />
 
INS Aridhaman was launched in November 2021.<ref name="India Today3" /><ref name="THE NEW INDIAN EXPRESS2">{{cite news |title=DRDO on long range Pralay, K5 to stalemate China soon |url=https://www.newindianexpress.com/states/odisha/2018/dec/15/maiden-trial-of-pralay-k5-likely-soon-1911623.html |access-date=15 December 2018 |publisher=THE NEW INDIAN EXPRESS}}</ref> The submarine begun sea trials in 2022.<ref>{{Cite web |title=Third Indian N-powered ballistic missile submarine to be inducted this year |url=https://www.deccanherald.com/india/third-indian-n-powered-ballistic-missile-submarine-to-be-inducted-this-year-3387338?utm_source=whatsapp&utm_medium=referral&utm_campaign=socialshare |access-date=2025-02-04 |website=Deccan Herald |language=en}}</ref> On 30 August 2024, a report suggested that this submarine will be commissioned in the next 6 months.<ref name=":7">{{Cite news |date=2024-08-30 |title=Amid China standoff, India set to boost naval power with 3rd N-sub in 6 months |url=https://timesofindia.indiatimes.com/india/amid-china-standoff-india-set-to-boost-naval-power-with-3rd-n-sub-in-6-months/articleshow/112905487.cms |access-date=2024-08-30 |work=The Times of India |issn=0971-8257}}</ref>
 
In August 2024, it was reported that a fifth Arihant class submarine is planned to be constructed.<ref>{{Cite news |last=Kumar |first=Bhaswar |date=30 August 2024 |title='More advanced': 10 key points on India's second nuclear sub INS Arighat |url=https://www.business-standard.com/external-affairs-defence-security/news/more-advanced-10-key-points-on-india-s-second-nuclear-sub-ins-arighat-124083000620_1.html |access-date=28 September 2024 |work=[[Business Standard]]}}</ref>


In 2007, then finance minister [[P. Chidambaram]], who was a member of the political committee which monitors the ATV programme, questioned the huge amount of money being spent on submarines with just 4 missile launch tubes. Hence the ATV project team tweaked the Arihant design by adding a 10-metre-long section for four more [[K-4 (missile)|K-4]] SLBMs to be integrated into the boat codenamed S4. After it became evident that the larger [[S5-class submarine|S5 class]] of SSBNs will take more time to develop, an additional unit, codenamed S4*, was sanctioned in 2012 to ensure that the production line doesn't go idle.<ref name="India Today3" />
== Project timeline ==


The detailed engineering of the design was implemented{{when|date=April 2021}} at [[Larsen & Toubro]]'s submarine design centre at their [[Hazira]] shipbuilding facility.<ref>{{cite press release|url=http://www.larsentoubro.com/lntcorporate/LnT_PRS/PDF/L&TPressRelease-Jul26-2009.pdf|title=Larsen and Toubro's Contribution to Arihant-class submarine|date=26 July 2009|access-date=17 March 2022}}{{Dead link|date=November 2019 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> [[Tata Power SED]] built the control systems for the submarine.<ref>{{cite web|title=India's first Indigenous nuclear submarine |url=http://www.jeywin.com/blog/arihant-–-india’s-first-indigenous-nuclear-submarine/|publisher=Jeywin|access-date=24 April 2013 |url-status=dead|archive-url=https://archive.today/20130217054406/http://www.jeywin.com/blog/arihant-%E2%80%93-india%E2%80%99s-first-indigenous-nuclear-submarine/|archive-date=17 February 2013 }}</ref> The steam turbines and associated systems integrated with the reactor were supplied by [[Walchandnagar Industries]].<ref name=dna-ppp>{{cite news|url=http://www.dnaindia.com/india/report_private-sector-played-a-major-role-in-arihant_1277435|title=Private sector played a major role in Arihant|newspaper=DNA|date=27 April 2009|access-date=17 March 2016|url-status=live|archive-url=https://web.archive.org/web/20120916225008/http://www.dnaindia.com/india/report_private-sector-played-a-major-role-in-arihant_1277435|archive-date=16 September 2022}}</ref> The lead vessel underwent a long and extensive process of testing after its launch in July 2009.<ref>{{cite news|url=http://www.hindu.com/2009/07/27/stories/2009072755801000.htm|location=Chennai, India|newspaper=[[The Hindu]]|title=Nuclear submarine Arihant to be fitted with K-15 ballistic missiles|date=27 July 2009|access-date=17 March 2016|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref> The propulsion and power systems were tested with high-pressure steam trials followed by harbor-acceptance trials that included submersion tests by flooding its ballast tanks and controlled dives to limited depths.<ref name=toi-homemade>{{cite news|url=http://articles.timesofindia.indiatimes.com/2009-12-03/india/28110779_1_ins-arihant-nuclear-powered-attack-submarines-technology-vessel|title=Home-made nuke sub INS Arihant to be inducted in 2 years|newspaper=[[The Times of India]]|date=3 December 2009|access-date=17 March 2016|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref> INS ''Arihant''{{'}}s reactor went [[Criticality (status)|critical]] for the first time on 10 August 2013.<ref>{{cite news|url=http://www.thehindu.com/sci-tech/technology/k15-all-set-to-join-arihant/article4242325.ece|title=K-15 all set to join Arihant|newspaper=[[The Hindu]]|date=27 December 2012|access-date=17 March 2016|url-status=live|archive-url=https://web.archive.org/web/20160117011505/http://www.thehindu.com/sci-tech/technology/k15-all-set-to-join-arihant/article4242325.ece|archive-date=17 January 2022}}</ref> On 13 December 2014, the submarine set off for its extensive sea trials.<ref>{{cite news|url=http://economictimes.indiatimes.com/news/politics-and-nation/indias-nuclear-submarine-arihant-flagged-off-for-sea-trials/articleshow/45526418.cms|title=India's nuclear submarine Arihant flagged off for sea trials|newspaper=[[The Economic Times]]|date=13 December 2014|access-date=15 December 2014|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref><ref>{{cite news|url=http://www.thehindu.com/news/cities/Visakhapatnam/ins-arihant-sails-out-of-harbour/article6693951.ece?homepage=true|title=INS Arihant sails out of harbour|newspaper=[[The Hindu]]|date=13 December 2014|access-date=15 December 2014|url-status=live|archive-url=https://web.archive.org/web/20160117011504/http://www.thehindu.com/news/cities/Visakhapatnam/ins-arihant-sails-out-of-harbour/article6693951.ece?homepage=true|archive-date=17 January 2022}}</ref>
* '''1974:''' The nuclear submarine project was sanctioned following the [[Smiling Buddha]] tests under the then [[Prime Minister of India|Prime Minister]], [[Indira Gandhi]].<ref name=":14" />
* '''1983:''' Additional funds were allotted for the project during the [[Fourth Indira Gandhi ministry]].<ref name=":14" />
* '''1998:''' [[A. P. J. Abdul Kalam]] cut the first steel for the submarine hull at the [[Larsen & Toubro]] facility at [[Hazira]]. L&T had received the submarine hull construction contract.<ref name="dna-ppp" /><ref name=":14" /> Simultaneously, the submarine's design was upgraded from [[Nuclear attack submarine|nuclear attack]] profile to [[Ballistic missile submarine|nuclear-powered ballistic missile submarine]] following [[Pokhran-II]].<ref name="India Today3" />
* '''12 February 2009:''' The Advanced Technology Vessel project, meant to deliver three submarines, is part of a $2.9&nbsp;billion programme to build five nuclear submarines. As per the then [[Minister of Defence (India)|Defence Minister]], [[A. K. Antony]], the first submarine was in the final stages of construction after [[supply chain]] bottlenecks were cleared and DRDO was already developing [[submarine-launched ballistic missile]].<ref name=":11">{{cite news |date=12 February 2009 |title=India nuclear sub project near completion |url=http://in.reuters.com/article/companyNews/idINISL35153320090212 |url-status=dead |archive-url=https://web.archive.org/web/20160305101646/http://in.reuters.com/article/india-defence-submarine-idINISL35153320090212 |archive-date=5 March 2016 |access-date=24 January 2011 |work=[[Reuters]]}}</ref><ref name="launch1">{{cite news |date=16 July 2009 |title=PM to launch indigenous nuke submarine by month-end |url=http://news.in.msn.com/national/article.aspx?cp-documentid=3097464 |url-status=dead |archive-url=https://archive.today/20130104175719/http://news.in.msn.com/national/article.aspx?cp-documentid=3097464 |archive-date=4 January 2013 |access-date=19 July 2009 |work=[[MSN]]}}</ref> The project was conceived in 1970s and operationalised in 1980s, though public acknowledgement never came from official sources until this announcement by the defence minister.<ref name="launch2">{{cite news |date=19 July 2009 |title=Indigenous nuclear submarine goes on trial |url=http://www.hindu.com/2009/07/19/stories/2009071958490500.htm |url-status=dead |archive-url=https://web.archive.org/web/20090722084642/http://www.hindu.com/2009/07/19/stories/2009071958490500.htm |archive-date=22 July 2009 |access-date=19 July 2009 |newspaper=[[The Hindu]] |location=Chennai, India}}</ref> There were delays to miniaturise the [[nuclear reactor core]] for the submarine and Russian technology help was sought to solve the issues without delays. Another factor that resulted in delays was lack of [[metallurgical]] expertise and lack of experience of Indian hull makers on the chosen material for the submarine. The successful development of a nuclear submarine came after two failed attempts in the 1970s and 1980s.<ref>{{cite news |last=Sud |first=Hari |date=14 August 2009 |title=India's nuclear submarine and the Indian Ocean |url=http://www.upiasia.com/Security/2009/08/14/indias_nuclear_submarine_and_the_indian_ocean/7676/ |url-status=live |archive-url=https://web.archive.org/web/20110728133202/http://www.upiasia.com/Security/2009/08/14/indias_nuclear_submarine_and_the_indian_ocean/7676/ |archive-date=28 July 2011 |access-date=24 January 2011 |publisher=upiasia.com}}</ref>
* '''16 July 2009:''' Multiple reports suggested that the first vessel under the Advanced Technology Vessel would be launched by [[Gursharan Kaur]], the wife of the then Prime Minister, [[Manmohan Singh]], on 26 July 2009. The ceremony would be held in [[Naval Dockyard (Visakhapatnam)]]. The vessel was named ''{{INS|Arihant}}'', meaning "destroyer of enemies". The design is based on [[Charlie-I]] submarines, while both the displacement and submerged speed are higher than the Charlie-I designs. While being launched, the [[dry dock]] in the Shipbuilding Centre in Visakhapatnam will be flooded and the submarine would be moved out of the SBC. The vessel would be then towed to a nearby [[pier]] for harbour trials during which, the nuclear power plant and auxiliary systems would be validated before its sea trials in the [[Bay of Bengal]]. The submarine was expected to be commissioned within two to three years. Meanwhile, [[Hull (watercraft)|hull]] sections of two additional ATVs have been completed in the [[Hazira]] facility of [[Larsen & Toubro]] and are to be transported to the SBC soon after ''Arihant'' exits the dock space.<ref>{{Cite web |date=2009-07-16 |title=Exclusive: PM's wife to launch INS Arihant, India's first nuclear submarine |url=https://www.indiatoday.in/headlines-today-top-stories/story/exclusive-pms-wife-to-launch-ins-arihant-indias-first-nuclear-submarine-52205-2009-07-15 |url-status=live |archive-url=https://web.archive.org/web/20251208052717/https://www.indiatoday.in/headlines-today-top-stories/story/exclusive-pms-wife-to-launch-ins-arihant-indias-first-nuclear-submarine-52205-2009-07-15 |archive-date=2025-12-08 |access-date=2025-12-08 |website=India Today |language=en}}</ref><ref name="domain-b.com">{{cite web |date=16 July 2009 |title=Indian indigenous nuclear sub to be unveiled on 26 July: report |url=http://www.domain-b.com/defence/general/20090716_indian_indigenous.html |url-status=live |archive-url=https://web.archive.org/web/20110921135024/http://www.domain-b.com/defence/general/20090716_indian_indigenous.html |archive-date=21 September 2011 |access-date=24 January 2011 |publisher=domain-b.com}}</ref><ref name="launch1" />
* '''26 July 2009:''' The first submarine of the class, ''Arihant'', was launched into the water. The launch took place after three decades of initiating the design stage of the project. The Defence Minister would also attended the event. The harbour acceptance and system trials was scheduled for one year. The submarine was built at a cost of $2.9&nbsp;billion.<ref name=":13">{{Cite web |last= |first= |date=2009-07-26 |title=Arihant central to India's strategic capability: Antony |url=https://www.indiatoday.in/latest-headlines/story/arihant-central-to-indias-strategic-capability-antony-52885-2009-07-25 |access-date=2025-12-08 |website=India Today |language=en}}</ref> Meanwhile, many expected that the operationalisation of the submarine would take much longer than two years.<ref>{{Cite web |last=PTI |date=2009-07-26 |title=Arihant to take long time to become operational: Experts |url=https://www.indiatoday.in/latest-headlines/story/arihant-to-take-long-time-to-become-operational-experts-52896-2009-07-25 |access-date=2025-12-08 |website=India Today |language=en}}</ref> Harbour acceptance trials and followed by sea acceptance trials, including the surface and sub-surface domains, respectively, were to be conducted before commissioning the submarine.<ref name=":12" /> Even the nuclear reactor was yet to be fitted onboard and would be followed by the reactor reaching [[Criticality (status)|criticality]], which would be a milestone.<ref>{{Cite web |date=2009-07-28 |title=defence.professionals {{!}} defpro.com |url=http://www.defpro.com/daily/details/364/ |archive-url=https://web.archive.org/web/20110717062659/http://www.defpro.com/daily/details/364/ |archive-date=2011-07-17 |access-date=2025-12-08 |website=www.defpro.com |language=de}}</ref> The submarine, equipped with [[Sagarika (missile)|Sagarika]] missiles,<ref name=":12" /> would serve as a [[technology demonstrator]] for the following nuclear submarines.<ref name="toi-homemade">{{cite news |date=3 December 2009 |title=Home-made nuke sub INS Arihant to be inducted in 2 years |url=https://timesofindia.indiatimes.com/india/Home-made-nuke-sub-INS-Arihant-to-be-inducted-in-2-years/articleshow/5293123.cms |url-status=live |archive-url=https://web.archive.org/web/20091207011612/https://timesofindia.indiatimes.com/india/Home-made-nuke-sub-INS-Arihant-to-be-inducted-in-2-years/articleshow/5293123.cms |archive-date=7 December 2009 |access-date=17 March 2016 |newspaper=[[The Times of India]]}}</ref><ref name=toi-20090717 />
* '''9 August 2014:''' The submarine's [[nuclear reactor]] became critical for the maiden time after four years of harbour acceptance patrol. The Navy wanted the submarine ready for deterrent patrol in 2014. Meanwhile, the second submarine was already at an advanced stage of construction at the SBC and could be launched in a year later.<ref>{{Cite web |date=2013-08-10 |title=INS Arihant reactor goes critical, submarine to start sea trials {{!}} Watch activation video |url=https://www.indiatoday.in/india/north/story/arihant-reactor-goes-critical-submarine-to-start-sea-trials-173376-2013-08-09 |url-status=live |archive-url=https://web.archive.org/web/20251208162511/https://www.indiatoday.in/india/north/story/arihant-reactor-goes-critical-submarine-to-start-sea-trials-173376-2013-08-09 |archive-date=2025-12-08 |access-date=2025-12-08 |website=India Today |language=en}}</ref>
* '''13 December 2014:''' ''Arihant'' was entered sea for the first time<ref>{{cite news |date=13 December 2014 |title=INS Arihant sails out of harbour |url=http://www.thehindu.com/news/cities/Visakhapatnam/ins-arihant-sails-out-of-harbour/article6693951.ece?homepage=true |url-status=live |archive-url=https://web.archive.org/web/20160117011504/http://www.thehindu.com/news/cities/Visakhapatnam/ins-arihant-sails-out-of-harbour/article6693951.ece?homepage=true |archive-date=17 January 2016 |access-date=15 December 2014 |newspaper=[[The Hindu]]}}</ref> after being flagged off for extensive sea trials following harbour trials.<ref>{{cite news |date=13 December 2014 |title=India's nuclear submarine Arihant flagged off for sea trials |url=http://economictimes.indiatimes.com/news/politics-and-nation/indias-nuclear-submarine-arihant-flagged-off-for-sea-trials/articleshow/45526418.cms |url-status=live |archive-url=https://web.archive.org/web/20230418231835/https://economictimes.indiatimes.com/news/politics-and-nation/indias-nuclear-submarine-arihant-flagged-off-for-sea-trials/articleshow/45526418.cms |archive-date=18 April 2023 |access-date=15 December 2014 |newspaper=[[The Economic Times]]}}</ref> The sea acceptance trials for the submarine was initially slated for February 2012.<ref name="toi-ntriad2">{{cite news |date=2 January 2012 |title=India to achieve N-arm triad in February |url=https://timesofindia.indiatimes.com/india/India-to-achieve-N-arm-triad-in-February/articleshow/11332636.cms |url-status=live |archive-url=https://web.archive.org/web/20130326102050/http://articles.timesofindia.indiatimes.com/2012-01-02/india/30580966_1_ins-arihant-first-indigenous-nuclear-submarine-akula-ii |archive-date=26 March 2013 |access-date=17 March 2016 |newspaper=[[The Times of India]]}}</ref>
* '''25 November 2015:''' A dummy or unarmed B-05 ''Sagarika'' missile was successfully test fired from INS ''Arihant'' from a depth of 20 metres.<ref name=":14">{{Cite news |date=2015-11-26 |title=N-capable Arihant submarine successfully test-fires unarmed missile |url=https://www.business-standard.com/article/news-ians/n-capable-arihant-submarine-successfully-test-fires-unarmed-missile-special-to-ians-115112600705_1.html |access-date=2025-12-08 |work=Business Standard}}</ref><ref>{{Cite web |last=Rout |first=Hemant Kumar |date=2015-11-27 |title=First Ejection Test of Underwater Missile From Arihant Submarine Successful |url=https://www.newindianexpress.com/states/odisha/2015/Nov/27/first-ejection-test-of-underwater-missile-from-arihant-submarine-successful-848950.html |access-date=2025-12-08 |website=The New Indian Express |language=en}}</ref>
* '''31 March 2016:''' The [[K-4 (missile)|K-4 missile]] was successfully tested from INS ''Arihant'', 45 nautical miles away from the [[Vishakhapatnam]] coast. The missile with a dummy payload was launched from the submarine in full operational configuration. The trial was carried out with the support of the personnel of [[Strategic Forces Command]] (SFC) while the [[DRDO]] provided all the logistics.<ref name=":15">{{Cite news |title=EXPRESS EXCLUSIVE: Maiden Test of Undersea K-4 Missile From Arihant Submarine |url=http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece |archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece |archive-date=2016-06-13 |access-date=2025-12-08 |work=The New Indian Express |language=en}}</ref><ref>{{Cite web |last=Panda |first=Ankit |title=India Successfully Tests Intermediate-Range Nuclear-Capable Submarine-Launched Ballistic Missile |url=https://thediplomat.com/2016/04/india-successfully-tests-intermediate-range-nuclear-capable-submarine-launched-ballistic-missile/ |access-date=2024-09-07 |website=thediplomat.com |language=en-US}}</ref><ref>{{Cite web |last=Bhat |first=Aditya |date=2016-04-09 |title=DRDO's nuclear capable K-4 underwater missile test-fired again, this time from INS Arihant: Report |url=https://www.ibtimes.co.in/drdos-nuclear-capable-k-4-underwater-missile-test-fired-again-this-time-ins-arihant-report-673978 |access-date=2024-09-07 |website=www.ibtimes.co.in |language=en}}</ref>
* '''August 2016:''' The first boat of the class, INS ''Arihant'', was commissioned.<ref name=":2" /><ref>{{Cite news |title=Satisfied with nuclear sub Arihant trials: Navy Chief |url=http://www.tribuneindia.com/news/satisfied-with-nuclear-sub-arihant-trials-navy-chief/74351.html |url-status=live |archive-url=https://web.archive.org/web/20160304110613/http://www.tribuneindia.com/news/satisfied-with-nuclear-sub-arihant-trials-navy-chief/74351.html |archive-date=4 March 2016 |access-date=17 March 2016 |newspaper=Tribune India}}</ref>
* '''19 November 2017:''' The second submarine, christened {{INS|Arighaat|3=2}}, was launched by the then defence minister, [[Nirmala Sitharaman]], with a low-profile, traditional ceremony. The vessel was floated out after flooding the drydock. Reportedly, commissioning of the vessel would take three years. It has an indigenous content of 60%. The third (S4) and fourth (S4*) submarine, with eight launcher units, was expected to be launched in 2020 and 2022, respectively.<ref name="India Today3" />
* '''July 2018:''' The submarine was reportedly ready to be fully operationalised with several weapons firing trials and deep diving trials off the coast of Visakhapatnam having been completed since five months earlier. The submarine was being accompanied by RFS ''Epron'', a Russian-origin ''Prut''-class [[submarine rescue ship]] which arrived in India on 1 October 2017.<ref>{{Cite news |last=Pubby |first=Manu |date=2018-07-14 |title=India's first nuclear submarine INS Arihant ready for operations, passes deep sea tests |url=https://economictimes.indiatimes.com/news/defence/indias-first-nuclear-submarine-ins-arihant-ready-for-operations-passes-deep-sea-tests/articleshow/51098650.cms |access-date=2025-12-09 |work=The Economic Times |issn=0013-0389}}</ref>
* '''11–12 August 2018:''' The B-05 missile system was fired twice on 11th and once on 12th of August from INS ''Arihant'' and was operationalised two decades since the missile systems development commenced. All the missiles followed the designated trajectories and were fired 10&nbsp;km away from Visakhapatnam from a depth of 20&nbsp;m.<ref>{{Cite web |last=Rout |first=Hemant Kumar |date=2018-08-19 |title=Nuke-capable submarine-launched missile operationalised, India in select triad club |url=https://www.newindianexpress.com/specials/2018/Aug/19/nuke-capable-submarine-launched-missile-operationalised-india-in-select-triad-club-1859992.html |access-date=2025-12-08 |website=The New Indian Express |language=en}}</ref>
* '''4 November 2018:''' ''Arihant'' completed its first deterrence patrol for 20 days.<ref name=":5" /><ref>{{Cite web |last=Unnithan |first=Sandeep |date=2018-11-05 |title=INS Arihant returned yesterday from 20-day deterrent patrol |url=https://www.indiatoday.in/india/story/ins-arihant-returned-yesterday-from-20-day-deterrent-patrol-1383188-2018-11-05 |access-date=2025-12-09 |website=India Today |language=en}}</ref><ref name=":6" />
* '''29 August 2024''': ''Arighaat'' commissioned.<ref name=":10" />
* '''16 October 2024:''' The fourth and final submarine of the class, with an indigenous content of 75% and equipped with K4 missiles, was launched.<ref name=":8">{{Cite news |last=Gupta |first=Shishir |date=22 October 2024 |title=India Launches 4th nuclear-missile submarine |url=https://www.hindustantimes.com/india-news/india-launches-4th-nuclear-missile-submarine-101729560730642.html |access-date=22 October 2024 |work=[[Hindustan Times]]}}</ref>
* '''2 December 2025:''' ''Aridhaman'' had entered the final stages of trials and was expected to be commissioned soon.<ref name="indiatoday.in">{{Cite web |last=Sharma |first=Shivani |last2=Negi |first2=Manjeet |date=2025-12-02 |title=Navy to get INS Aridhaman, third Indian-made nuclear submarine |url=https://www.indiatoday.in/india/story/ins-aridaman-third-indian-made-nuclear-submarine-to-be-commissioned-soon-navy-chief-2829303-2025-12-02 |access-date=2025-12-02 |website=India Today |language=en}}</ref>
* '''30 December 2025:''' The fourth submarine, S4*, had reportedly departed the harbour for sea trials a week earlier and is expected to be commissioned in early 2027. Meanwhile, ''Aridhaman'', the third unit had completed its sea trials a few weeks ago and is now to be commissioned in early 2026 after being delivered.<ref name=":18" /><ref name=":19">{{Cite web |last=Militar |first=Redaccion Zona |date=2025-12-30 |title=India is reported to have begun sea trials of the fourth of its new Arihant-class nuclear-powered ballistic missile submarines |url=https://www.zona-militar.com/en/2025/12/30/india-is-reported-to-have-begun-sea-trials-of-the-fourth-of-its-new-arihant-class-nuclear-powered-ballistic-missile-submarines/ |access-date=2025-12-31 |website=Zona Militar |language=en-US}}</ref>
* '''5 January 2026:''' A report suggested that the final submarine, so far referred to as S4*, will be named INS ''Arisudan''. The name has been proposed by the ship-naming committee of the Indian Navy. The name is yet to be receive clearance by the defence ministry and eventually, the [[President of India]], who is also the Supreme Commander of the Armed Forces.<ref name=":20">{{Cite web |date=2026-01-05 |title=Arihant class nuclear-powered submarine S4* likely to be named INS Arisudan |url=https://www.hindustantimes.com/india-news/arihant-class-nuclear-powered-submarine-s4-likely-to-be-named-ins-arisudan-101767555406284.html |access-date=2026-01-05 |website=Hindustan Times |language=en}}</ref>


==Ships in class==
==Ships in class==
[[File:Arihant 1.svg|thumb|right|Conceptual drawing of INS ''Arihant'']]
Four boats of this class are planned.<ref name="India Today3" /> The first boat of<ref name="toi-ntriad">{{cite news|url=http://articles.timesofindia.indiatimes.com/2012-01-02/india/30580966_1_ins-arihant-first-indigenous-nuclear-submarine-akula-ii|archive-url=https://web.archive.org/web/20130326102050/http://articles.timesofindia.indiatimes.com/2012-01-02/india/30580966_1_ins-arihant-first-indigenous-nuclear-submarine-akula-ii|url-status=dead|archive-date=26 March 2013|title = India to achieve N-arm triad in February|newspaper=[[The Times of India]]|date=2 January 2012|access-date=17 March 2022}}</ref> the class, {{INS|Arihant}}, was commissioned in August 2016.<ref name=":2">{{Cite news|url=http://timesofindia.indiatimes.com/india/India-set-to-complete-N-triad-with-Arihant-commissioning/articleshow/54907081.cms|title=India set to complete N-triad with Arihant commissioning|newspaper=The Times of India|access-date=2016-10-18|url-status=live|archive-url=https://web.archive.org/web/20161020071532/http://timesofindia.indiatimes.com/india/India-set-to-complete-N-triad-with-Arihant-commissioning/articleshow/54907081.cms|archive-date=20 October 2022}}</ref><ref>{{Cite news|url=http://www.tribuneindia.com/news/satisfied-with-nuclear-sub-arihant-trials-navy-chief/74351.html|title=Satisfied with nuclear sub Arihant trials: Navy Chief|newspaper=Tribune India|access-date=17 March 2016|url-status=live|archive-url=https://web.archive.org/web/20160304110613/http://www.tribuneindia.com/news/satisfied-with-nuclear-sub-arihant-trials-navy-chief/74351.html|archive-date=4 March 2022}}</ref> The first four vessels are expected to be commissioned by 2025. In December 2014, the work on a second nuclear reactor began and the second boat, {{INS|Arighat}} whose [[sea trial]]s which started in 2017, is now completed and is scheduled to be commissioned in August, 2022 along with [[INS Vikrant (2013)|INS Vikrant]].<ref name="India Today"/> The final two ships INS Aridhaman and S4* in the class are expected to be larger, displacing over 1,000 tonnes more than the ''Arihant''<ref name="India Today3" /> and have 8 missile launch tubes to carry up to 8 K4 or K5 and a more powerful pressurized water reactor than INS ''Arihant''. INS Aridhaman was launched in November 2021 and expected to be commission in 2024<ref name="India Today3" /><ref name="THE NEW INDIAN EXPRESS">{{cite news |title =DRDO on long range Pralay, K5 to stalemate China soon |url= https://www.newindianexpress.com/states/odisha/2018/dec/15/maiden-trial-of-pralay-k5-likely-soon-1911623.html |publisher = THE NEW INDIAN EXPRESS |access-date= 15 December 2022}}</ref>
{{as of|2022}}, a larger follow on class to the ''Arihant'' class, designated by the codename [[S5-class submarine|S5]], was planned,<ref name="India Today3" /> with three boats of the class projected.<ref name="India Today3" /> Missile capacity is expected to be 12 to 16 LRBMs.<ref>{{Cite web|url=http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|title= Maiden Test of Undersea K-4 Missile From Arihant Submarine|website=The New Indian Express|access-date=2016-04-09|url-status=live|archive-url=https://web.archive.org/web/20160408232833/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=8 April 2022}}</ref><ref name=":1">{{Cite web|url=https://thediplomat.com/2016/03/indias-undersea-deterrent/|title=India's Undersea Deterrent|last=Diplomat|first=Saurav Jha, The|website=The Diplomat|access-date=2016-04-09|url-status=live|archive-url=https://web.archive.org/web/20160408081504/https://thediplomat.com/2016/03/indias-undersea-deterrent/|archive-date=8 April 2022}}</ref><ref name="IndiaToday2017">{{Cite news|url=https://www.indiatoday.in/magazine/the-big-story/story/20171218-india-ballistic-missile-submarine-k-6-submarine-launched-drdo-1102085-2017-12-10|title=A peek into India's top secret and costliest defence project, nuclear submarines|last=Unnithan|first=Sandeep|date=10 December 2017|newspaper=[[India Today]]|access-date=5 September 2019|url-status=live|archive-url=https://web.archive.org/web/20190420153431/https://www.indiatoday.in/magazine/the-big-story/story/20171218-india-ballistic-missile-submarine-k-6-submarine-launched-drdo-1102085-2017-12-10|archive-date=20 April 2022}}</ref>


{| class="wikitable"
{| class="wikitable"
Line 92: Line 128:
! Name
! Name
! Pennant
! Pennant
!Subclass
! Displacement (surfaced)
! Displacement (surfaced)
! Laid down
! Laid down
! Launch
! Launch
! Sea Trials  Begins
! Sea trials begin
!Sea Trials Completed
! Sea trials completed
! Commission
! Commissioned
! Status
! Status
|-
|-
| {{ship|INS|Arihant}} (S2)<ref name="India Today3" /><ref>{{Cite news|url=https://www.thehindu.com/news/national/ins-arihant-may-be-of-limited-utility/article6709623.ece|title=INS Arihant may be of limited utility|last=Anandan|first=S.|date=2014-12-20|work=The Hindu|access-date=2019-06-30|language=en-IN|issn=0971-751X}}</ref>
| {{INS|Arihant|3=2}} (S2)<ref name="India Today3" /><ref>{{Cite news|url=https://www.thehindu.com/news/national/ins-arihant-may-be-of-limited-utility/article6709623.ece|title=INS Arihant may be of limited utility|last=Anandan|first=S.|date=2014-12-20|work=The Hindu|access-date=2019-06-30|language=en-IN|issn=0971-751X}}</ref>
| SSBN 80<ref>{{Cite news|url=https://www.hindustantimes.com/india-news/20-years-after-pokhran-ii-india-makes-giant-nuclear-leap/story-GlCezZbc4J7VpRshfF4RYJ.html|title=20 years after Pokhran II, India makes giant nuclear leap|date=2018-11-06|work=hindustantimes.com/|access-date=2018-11-25|language=en}}</ref>
| SSBN 80<ref>{{Cite news |date=2018-11-06 |title=20 years after Pokhran II, India makes giant nuclear leap |url=https://www.hindustantimes.com/india-news/20-years-after-pokhran-ii-india-makes-giant-nuclear-leap/story-GlCezZbc4J7VpRshfF4RYJ.html |access-date=2018-11-25 |work=[[Hindustan Times]] |language=en}}</ref>
| 6,000 tonnes
| rowspan="2" |''Arihant'' subclass
| rowspan="2" | 6,000 tonnes
| 2004<ref name="jfs-1617">{{cite book|editor1-last=Saunders|editor1-first=Stephen|editor1-mask=Commodore Stephen Saunders|title=Jane's Fighting Ships 2016–2017|date=2016|publisher=Jane's Information Group|location=Coulsdon|isbn=978-0710631855|page=336|edition=119th|chapter=India}}</ref>
| 2004<ref name="jfs-1617">{{cite book|editor1-last=Saunders|editor1-first=Stephen|editor1-mask=Commodore Stephen Saunders|title=Jane's Fighting Ships 2016–2017|date=2016|publisher=Jane's Information Group|location=Coulsdon|isbn=978-0710631855|page=336|edition=119th|chapter=India}}</ref>
| 26 July 2009
| 26 July 2009<ref name=":13" />
| 13 December 2014<ref name="INS Arihant sails out of harbour">{{cite news|url=http://www.thehindu.com/news/cities/Visakhapatnam/ins-arihant-sails-out-of-harbour/article6693951.ece?homepage=true|title=INS Arihant sails out of harbor|newspaper=[[The Hindu]]|date=13 December 2014|access-date=22 December 2014|url-status=live|archive-url=https://web.archive.org/web/20160117011504/http://www.thehindu.com/news/cities/Visakhapatnam/ins-arihant-sails-out-of-harbour/article6693951.ece?homepage=true|archive-date=17 January 2022}}</ref>
| 13 December 2014<ref name="INS Arihant sails out of harbour">{{cite news|url=http://www.thehindu.com/news/cities/Visakhapatnam/ins-arihant-sails-out-of-harbour/article6693951.ece?homepage=true|title=INS Arihant sails out of harbor|newspaper=[[The Hindu]]|date=13 December 2014|access-date=22 December 2014|url-status=live|archive-url=https://web.archive.org/web/20160117011504/http://www.thehindu.com/news/cities/Visakhapatnam/ins-arihant-sails-out-of-harbour/article6693951.ece?homepage=true|archive-date=17 January 2016}}</ref>
|23 February 2016<ref>{{Cite news|last=Pubby|first=Manu|title=India's first nuclear submarine INS Arihant ready for operations, passes deep sea tests|work=The Economic Times|url=https://economictimes.indiatimes.com/news/defence/indias-first-nuclear-submarine-ins-arihant-ready-for-operations-passes-deep-sea-tests/articleshow/51098650.cms|access-date=2021-09-09}}</ref>
|23 February 2016<ref>{{Cite news|last=Pubby|first=Manu|title=India's first nuclear submarine INS Arihant ready for operations, passes deep sea tests|work=The Economic Times|url=https://economictimes.indiatimes.com/news/defence/indias-first-nuclear-submarine-ins-arihant-ready-for-operations-passes-deep-sea-tests/articleshow/51098650.cms|access-date=2021-09-09}}</ref>
| August 2016
| August 2016
| In service<ref name=":0" />
| rowspan="2" | Active
|-
|-
| {{INS|Arighat}} (S3)<ref name="India Today3" /><ref>{{Cite web|url=https://www.vifindia.org/2018/december/11/india-s-nuclear-triad-is-now-fully-operational|title=India's Nuclear Triad is now Fully Operational|date=2018-12-11|website=Vivekananda International Foundation|language=en|access-date=2019-07-02}}</ref>
| {{INS|Arighaat|3=2}} (S3)<ref>{{Cite web|url=https://www.vifindia.org/2018/december/11/india-s-nuclear-triad-is-now-fully-operational|title=India's Nuclear Triad is now Fully Operational|date=2018-12-11|website=Vivekananda International Foundation|language=en|access-date=2019-07-02}}</ref>
|SSBN 81
|SSBN 81
| 6,000 tonnes
| 2009<ref name="jfs-1617"/>
| 2009<ref name="jfs-1617"/>
| 19 November 2017<ref name="bigger_nuclear_sub">{{Cite news|last1=Peri|first1=Dinakar|last2=Joseph|first2=Josy|url=http://www.thehindu.com/news/national/a-bigger-nuclear-submarine-is-coming/article19862549.ece|title=A bigger nuclear submarine is coming|date=2017-10-15|newspaper=The Hindu|access-date=2017-10-15|url-status=live|archive-url=https://web.archive.org/web/20180303201420/http://www.thehindu.com/news/national/a-bigger-nuclear-submarine-is-coming/article19862549.ece|archive-date=3 March 2022}}</ref><ref>{{Cite web|last=Bedi|first=Rahul|url=http://www.janes.com/article/76315/india-quietly-launches-second-ssbn|title=India quietly launches second SSBN|work=IHS Jane's Defence Weekly|date=2017-12-11|url-status=dead|archive-url=https://web.archive.org/web/20171212031838/http://www.janes.com/article/76315/india-quietly-launches-second-ssbn|archive-date=12 December 2017|access-date=11 December 2022}}</ref>
| 19 November 2017<ref name="bigger_nuclear_sub">{{Cite news|last1=Peri|first1=Dinakar|last2=Joseph|first2=Josy|url=http://www.thehindu.com/news/national/a-bigger-nuclear-submarine-is-coming/article19862549.ece|title=A bigger nuclear submarine is coming|date=2017-10-15|newspaper=The Hindu|access-date=2017-10-15|url-status=live|archive-url=https://web.archive.org/web/20180303201420/http://www.thehindu.com/news/national/a-bigger-nuclear-submarine-is-coming/article19862549.ece|archive-date=3 March 2018}}</ref><ref>{{Cite web|last=Bedi|first=Rahul|url=http://www.janes.com/article/76315/india-quietly-launches-second-ssbn|title=India quietly launches second SSBN|work=IHS Jane's Defence Weekly|date=2017-12-11|url-status=dead|archive-url=https://web.archive.org/web/20171212031838/http://www.janes.com/article/76315/india-quietly-launches-second-ssbn|archive-date=12 December 2017|access-date=11 December 2017}}</ref>
|8 January 2017<ref>{{Cite news|last=Joseph|first=Dinakar Peri & Josy|date=2018-01-08|title=INS Arihant left crippled after 'accident' 10 months ago|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/national/ins-arihant-left-crippled-after-accident-10-months-ago/article22392049.ece|access-date=2021-09-09|issn=0971-751X}}</ref>
|8 January 2018<ref>{{Cite news|last=Joseph|first=Dinakar Peri & Josy|date=2018-01-08|title=INS Arihant left crippled after 'accident' 10 months ago|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/national/ins-arihant-left-crippled-after-accident-10-months-ago/article22392049.ece|access-date=2021-09-09|issn=0971-751X}}</ref>
|March 2021<ref>{{Cite web|title=Vikrant, nuclear submarine commissioning to ring in 75th Independence anniversary celebrations|url=https://www.indiatoday.in/amp/india-today-insight/story/vikrant-nuclear-submarine-commissioning-to-ring-in-75th-independence-anniversary-celebrations-1838057-2021-08-08|access-date=2021-09-09|website=India Today|language=en}}</ref>
|March 2021<ref>{{Cite web|title=Vikrant, nuclear submarine commissioning to ring in 75th Independence anniversary celebrations|url=https://www.indiatoday.in/india-today-insight/story/vikrant-nuclear-submarine-commissioning-to-ring-in-75th-independence-anniversary-celebrations-1838057-2021-08-08|access-date=2021-09-09|website=India Today|language=en}}</ref>
| August 2022 (est.) <ref name="India Today" /><ref name="ETFeb20">{{Cite news|last=Pubby|first=Manu|url=https://economictimes.indiatimes.com/news/defence/indias-rs-1-2-l-cr-n-submarine-project-closer-to-realisation/articleshow/74234776.cms|title=India's Rs 1.2 lakh crore nuclear submarine project closer to realisation|date=2020-02-21|work=The Economic Times|access-date=2020-02-23}}</ref>
| 29 August 2024<ref name=":9">{{cite web |date=2024-08-29 |title=Second Arihant-Class submarine 'INS Arighaat' commissioned into Indian Navy in the presence of Raksha Mantri in Visakhapatnam |url=https://pib.gov.in/PressReleasePage.aspx?PRID=2049870 |access-date=29 August 2024 |website=Press Information Bureau}}</ref><ref name=":10">{{Cite news |date=2024-08-29 |title=India commissions INS Arighat: Know all about Navy's 2nd nuclear-powered submarine |url=https://timesofindia.indiatimes.com/india/india-commissions-ins-arighat-know-all-about-navys-2nd-nuclear-powered-submarine/articleshow/112900556.cms |access-date=2024-08-29 |work=The Times of India |issn=0971-8257}}</ref>
| Sea trials completed<ref name="India Today3" />
|-
|-
| INS ''Aridhaman'' (S4)<ref name=":1" />
| {{INS|Aridhaman|3=2}} (S4)<ref name=":1">{{Cite magazine |last=Saurav |first=Jha |title=India's Undersea Deterrent |url=https://thediplomat.com/2016/03/indias-undersea-deterrent/ |url-status=live |archive-url=https://web.archive.org/web/20160408081504/https://thediplomat.com/2016/03/indias-undersea-deterrent/ |archive-date=8 April 2016 |access-date=2016-04-09 |magazine=The Diplomat}}</ref>
|SSBN 82
| rowspan="2" |''Aridhaman'' subclass
| rowspan="2" |7,000 tonnes
| 2018<ref name = "hindu1">{{cite news |title=A bigger nuclear submarine is coming |url= https://www.thehindu.com/news/national/a-bigger-nuclear-submarine-is-coming/article19862549.ece |date=2017|website=www.thehindu.com |publisher=[[The Hindu]] |access-date=25 June 2025}}</ref>
| 23 November 2021<ref name=":4">{{Cite news |date=2021-12-31|title=India Quietly Launches 3rd Arihant-class Nuclear-powered Submarine, Can Carry 8 Ballistic Missiles: Report|url=https://www.news18.com/news/india/india-quietly-launches-3rd-arihant-class-nuclear-powered-submarine-can-carry-8-ballistic-missiles-report-4610366.html|access-date=2021-12-31|work=News18|language=en}}</ref>
|
|
|7,000 tonnes
|December 2025<ref name=":18">{{Cite web |title=CHAKRA EXCLUSIVE: India's fourth SSBN sails out for sea trials |url=https://chakranewz.com/critical-technologies/trending/chakra-exclusive-india-rsquo-s-fourth-ssbn-sails-out-for-sea-trials |access-date=2025-12-30 |website=chakranewz |language=en|date=2025-12-29}}</ref><ref name=":19" />
|
|April–May 2026 ''(expected)''<ref name=":17">{{Cite web |date=2025-12-29 |title=CHAKRA EXCLUSIVE: India's fourth SSBN sails out for sea trials |url=https://chakranewz.com/critical-technologies/trending/chakra-exclusive-india-rsquo-s-fourth-ssbn-sails-out-for-sea-trials |access-date=2025-12-30 |website=Chakranewz |language=en}}</ref><ref name="dh">{{cite news |title=Third Indian N-powered ballistic missile submarine to be inducted this year |url= https://www.deccanherald.com/india/third-indian-n-powered-ballistic-missile-submarine-to-be-inducted-this-year-3387338 |date=2025 |website=www.deccanherald.com |publisher=[[Deccan Herald]] |access-date=25 June 2025}}</ref>
| 23 November 2021<ref name=":4">{{Cite web|date=2021-12-31|title=India Quietly Launches 3rd Arihant-class Nuclear-powered Submarine, Can Carry 8 Ballistic Missiles: Report|url=https://www.news18.com/news/india/india-quietly-launches-3rd-arihant-class-nuclear-powered-submarine-can-carry-8-ballistic-missiles-report-4610366.html|access-date=2021-12-31|website=News18|language=en}}</ref>
|Sea trials completed
|
|
| 2024 (est.)<ref name="ETFeb20" />
| Fitting out<ref>{{Cite news|url=http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|title=Maiden Test of Undersea K-4 Missile From Arihant Submarine|website=The New Indian Express|access-date=1 June 2016|date=9 April 2016|url-status=live|archive-url=https://web.archive.org/web/20160613034034/http://www.newindianexpress.com/nation/EXPRESS-EXCLUSIVE-Maiden-Test-of-Undersea-K-4-Missile-From-Arihant-Submarine/2016/04/09/article3370608.ece|archive-date=13 June 2022}}</ref>
|-
|-
| S4* (codename)<ref name=":1" />
| ''[[INS Arisudan|Arisudan]]''
|
(S4*)<ref name=":20" />
|7,000 tonnes
|SSBN 83
|
|2020
|2023 (est.)
|16 October 2024<ref>{{Cite news |last=Peri |first=Dinakar |date=2024-10-22 |title=India's fourth nuclear submarine launched into water |url=https://www.thehindu.com/news/national/indias-fourth-nuclear-submarine-launched-into-water/article68783731.ece |access-date=2024-11-29 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref>
|
|December 2025<ref name=":18" /><ref name=":19" />
|
|
|2025 (est.) <ref name="ETFeb20" />
|2027
| Under construction
(''expected)''<ref name=":17" />
| Sea trials<ref name=":17" />
|}
|}


== Timeline ==
== Timeline ==
{| class="wikitable sortable"  style="width:98%; border:1px solid black;"
{| class="wikitable sortable"  
|- style="background:#9cf;"
|-
| style="width:10%;"| '''Date'''
! style=width:110px; | '''Date'''
| style="width:20%;"| '''Event'''
! '''Event'''
|- style="background:#f4f9ff;"
|- style="background:#f4f9ff;"
| 19 May 1998 || Confirmation of ATV project by the then Defence Minister [[George Fernandes]]
| 19 May 1998 || Confirmation of ATV project by the then Defence Minister [[George Fernandes]]
Line 172: Line 210:
|-
|-
|19 November 2017
|19 November 2017
|[[INS Arighat|INS ''Arighat'']] launched<ref name="India Today"/>
|[[INS Arighaat|INS ''Arighaat'']] launched<ref name="India Today3" />
|-
|-
|8 January 2018
|8 January 2018
|INS ''Arighat'' to begin sea trials<ref name=":3">{{Cite web|url=http://theprint.in/2017/08/24/exclusive-aridaman-indias-second-nuclear-armed-submarine-ready-launch/|title=Exclusive: 'Aridaman', India's second nuclear-armed submarine, is ready for launch|last=Pubby|first=Manu|date=2017-08-24|website=ThePrint|archive-url=https://web.archive.org/web/20170825060616/http://theprint.in/2017/08/24/exclusive-aridaman-indias-second-nuclear-armed-submarine-ready-launch/|archive-date=25 August 2017|url-status=live|access-date=2017-08-24}}</ref>
|INS ''Arighaat'' to begin sea trials<ref name=":3">{{Cite news |url=http://theprint.in/2017/08/24/exclusive-aridaman-indias-second-nuclear-armed-submarine-ready-launch/|title=Exclusive: 'Aridaman', India's second nuclear-armed submarine, is ready for launch|last=Pubby|first=Manu|date=2017-08-24|work=ThePrint|archive-url=https://web.archive.org/web/20170825060616/http://theprint.in/2017/08/24/exclusive-aridaman-indias-second-nuclear-armed-submarine-ready-launch/|archive-date=25 August 2017|url-status=live|access-date=2017-08-24}}</ref>
|-
|5 November 2018
|INS ''Arihant'' completed its first deterrence patrol<ref>{{Cite news |date=2018-11-05 |title=India's nuclear triad is complete with INS Arihant ending its first deterrence patrol |language=en-IN |work=The Hindu |url=https://www.thehindu.com/news/national/ins-arihant-completes-deterrence-patrol-india-declares-nuclear-traid-operational/article25425436.ece |access-date=2023-03-14 |issn=0971-751X}}</ref>
|-
|-
|March 2021
|March 2021
|''INS Arighat's'' sea trials are completed.
|''INS Arighaat's'' sea trials are completed.
|-
|-
|November 2021
|November 2021
|S4 is speculated to be launched.<ref name=":4" />
|INS ''Aridhaman'' is speculated to be launched.<ref name=":4" />
|- style="background:#f4f9ff;"
|-
|2022||INS ''Arighat'' scheduled to be commissioned.<ref name=":2" /><ref name=":3" />
|29 August 2024
|INS ''Arighaat'' officially commissioned.<ref name=":9" />
|-
|16 October 2024
|S4* launched<ref name=":8" />
|-
|-
|2025
|2026
|S4* is scheduled to be launched.
|S4 commissioning expected<ref name="indiatoday.in"/>
|}
|}


==See also==
==See also==
* [[Future of the Indian Navy]]
* [[Future of the Indian Navy]]
* [[List of active Indian Navy ships]]
* [[List of submarines of the Indian Navy]]
* [[List of submarines of the Indian Navy]]
* [[List of submarine classes in service]]
* [[List of submarine classes in service]]
Line 208: Line 254:


{{DEFAULTSORT:Arihant-class submarine}}
{{DEFAULTSORT:Arihant-class submarine}}
[[Category:Ballistic missile submarines]]
[[Category:Arihant-class submarines]]
[[Category:Arihant-class submarines]]
[[Category:Submarines of India]]
[[Category:Submarines of India]]
[[Category:Nuclear-powered submarines]]
[[Category:Nuclear-powered submarines]]
[[Category:Submarine classes]]
[[Category:Submarine classes]]

Latest revision as of 00:47, 28 March 2026


Template:Infobox ship

The Arihant-class (lit. 'Vanquisher of the Enemy') is a class of nuclear-powered ballistic missile submarines in service with the Indian Navy. They were developed under the Advanced Technology Vessel (ATV) project to design and build nuclear-powered submarines.[1] The project is being seen as a black project.[2] These vessels are classified as 'strategic strike nuclear submarines' by India.[3][4]

The lead vessel of the class, INS Arihant, was laid down in 2004, launched in 2009 and, after extensive sea trials, confirmed to be commissioned in August 2016.[5][6][7] Arihant holds the distinction of being the first ballistic missile submarine to have been built by a country other than one of the five permanent members of the United Nations Security Council.[8] As of 25 October 2024, INS Arihant and INS Arighaat are already on deep sea patrols.[9]

History[edit | edit source]

In December 1971, during the Indo-Pakistani War of 1971, US President Richard Nixon sent a carrier battle group named Task Force 74, led by the nuclear-powered Template:USS into the international waters of the Bay of Bengal in a show of force.[10][11] Task Force 74 remained in international waters, where it was legally entitled to be. The records of Nixon-Kissinger communications show no contingency nor any plan under which Enterprise would enter Indian or Pakistani waters, or otherwise intervene in the conflict but it is well known that the duo viewed Pakistan as a strong ally in that region and were silent on Bangladesh genocide committed by Pakistani military. In response, the Soviet Union sent a submarine armed with nuclear missiles from Vladivostok to trail the US task force in support of India.[12] The event demonstrated the significance of nuclear weapons and ballistic missile submarines to then Prime Minister Indira Gandhi.[13] Following the 1974 Smiling Buddha nuclear test, the Director of Marine Engineering (DME) at Naval Headquarters initiated a technical feasibility study for an indigenous nuclear propulsion system (Project 932).[14]

The Indian Navy's Advanced Technology Vessel project to design and construct a nuclear submarine took shape in the 1990s.[15] Then Defence Minister George Fernandes confirmed the project in 1998.[16] The initial intent of the project was to design nuclear-powered fast attack submarines, though following nuclear tests conducted by India in 1998 at Pokhran Test Range and the Indian pledge of no first use, the project was re-aligned towards the design of a ballistic missile submarine in order to complete India's nuclear triad.[17][18][19]

Description[edit | edit source]

PM Narendra Modi addressing the crew of INS Arihant. Note the picture of the submarine in the background.

The Arihant-class submarines are nuclear-powered ballistic missile submarines built under the Advanced Technology Vessel (ATV) project.[20] Originally, three submarines were to be built under the ATV project, which itself is part of a larger programme to construct five nuclear submarines[21] for the Indian Navy. Later, a fourth submarine was added[1] to the 30,000 crore (US$6.2 billion)-worth project.[22] These are the first nuclear submarines designed and built by India.[23] The total cost of the project had hiked to 90,000 crore (US$13.82 billion) by 2017.[1]

The first two submarines are 111.6 m (366 ft) long[24] with a beam of 11 m (36 ft), a draught of 15 m (49 ft), displacement of 6,000 tonnes (5,900 long tons; 6,600 short tons).[25] The latter submarines included an additional 10 m (33 ft)-long section of four launch tubes increasing the displacement by 1,000 tonnes (980 long tons; 1,100 short tons).[1] The complement is about 95, including officers and sailors.[26] The boats are powered by a single seven blade propeller powered by an 82.5[24] MWe-rated pressurised light-water reactor (PWR)[27] and can achieve a maximum speed of 12–15 knots (22–28 km/h) when surfaced and 24 knots (44 km/h) when submerged.[26][28]

The submarines, being constructed at the Ship Building Centre (SBC), Visakhapatnam using a US HY-80 grade equivalent Russian steel, has two compartments including propulsion and combat management systems, platform management centre, and the torpedo room. The vessels feature a double hull encompassing ballast tanks, two standby auxiliary engines, and a retractable thruster for emergency power and mobility.[24]

Sagarika SLBM

The initial batch of two submarines have four launch tubes in their hump and can carry up to twelve K-15 Sagarika missiles with one warhead each (with a range of 750 km or 470 mi) or four K-4 missiles (with a range of 3,500 km or 2,200 mi).[29][30][31] The third and fourth submarines, featuring Arihant Stretch design,[32] will have a larger configuration, carrying twenty-four K-15 Sagarika or eight K-4 missiles, due to the addition of four launch tubes.[1] The Indian Navy personnel received training on INS Chakra, an -class submarine leased from Russia in 2012.[33][34]

The submarine's K-15 missiles can reach most of Pakistan and its K-4 can target all of Pakistan.[35] The K-4 may also be capable of targeting Beijing, but would need to be in the northern most waters of Bay of Bengal.[35] Deployment of the Arihant to the Pacific Ocean is unlikely given the submarine's noise issues.[35]

Development[edit | edit source]

Conceptual drawing of INS Arihant

The classified project is headquartered in New Delhi and remains under direct supervision of the Prime Minister's Office and the National Security Advisor.[1] The submarines are powered by a pressurised water reactor with highly enriched uranium fuel.[2][36] The miniaturised version of the reactor was designed and built by the Bhabha Atomic Research Centre (BARC) at the Indira Gandhi Centre for Atomic Research (IGCAR) in Kalpakkam.[37] It included a 42-metre (138 ft) section of the submarine's pressure hull containing the shielding tank with water and the reactor, a control room, as well as an auxiliary control room for monitoring safety parameters.[38] The prototype reactor became critical on 11 November 2003 and was declared operational on 22 September 2006.[13] Successful operation of the prototype for three years enabled the production version of the reactor for Arihant.[27][39] The reactor subsystems were tested at the Machinery Test Center in Visakhapatnam.[40] Facilities for loading and replacing the fuel cores of the naval reactors in berthed submarines were also established.[13] The prototype 83 MW light water reactor that was installed at Kalpakkam by BARC is codenamed S1 and is used to train nuclear submariners.[1]

Larsen & Toubro undertook critical detailed engineering based on design provided by the Navy and DRDO at its submarine design centre. The firm was also the single largest contributor to the programme ranging from the steel cutting of the submarines to their launch.[41][42] The facility served as the site for hull construction. Tata Power SED built the control systems for the submarine.[43] The steam turbines and associated systems integrated with the reactor were supplied by Walchandnagar Industries. Former Prime Minister of India, Manmohan Singh, had lauded ATV project as a "productive public–private partnership".[44]

In 2006, a high-level committee led by R. Chidambaram, the then principal scientific advisor to the Government of India, had assessed India's ability to construct three S5 series of SSBNs. The project with a budget of 10,000 crore (equivalent to 260 billion or US$3.6 billion in 2019) divided among DRDO, BARC and the ATV headquarters. The construction would tentatively begin in 2015 followed with the first submarine to be deployed in 2021. Its projected specifications of the submarine included displacement of 13,500 t (13,300 long tons; 14,900 short tons), 12 VLS with an MIRV-equipped SLBM with a range of 6,000 km (3,700 mi). The missile later evolved as K-6 ballistic missile.[1]

Around 2007, the then finance minister, P. Chidambaram, who was a member of the political committee which monitors the ATV programme, questioned the huge amount of money being spent on submarines with just 4 missile launch tubes. Thereafter, the ATV project team evolved the design into Arihant-stretch.[32] The improved design incorporated a 10-metre-long section for four more missile tubes to be equipped with K-4 SLBMs. This design would be applied to S4 boat.[1] The boat can, hence, accommodate 24 B-05 short-range missiles or 8 K-4 long-range missiles.[32][45]

On 24 December 2009, the Hindustan Shipyard, located at Visakhapatnam, was transferred from the Ministry of Shipping to the Ministry of Defence to support the construction of Arihant-class submarine programme. This would help in utilising the shipyard's infrastructure in the project.[46][47]

Around 2012, with the S5 project remaining in developmental stage, another Arihant-class submarine was cleared for production to avoid idling of the production line. The new unit was designated as S4* (between S4 and S5). The boat would also feature the Arihant Stretch design.[1]

In December 2014, the work on a second nuclear reactor began and INS Arighaat started sea trials in 2017. As per reports released in August 2024, INS Arighaat was commissioned before October 2024.[48][49] On 29 August 2024, after extensive trials and upgrades INS Arighaat was formally commissioned.[50]

INS Aridhaman was launched in November 2021.[1][51] The submarine begun sea trials in 2022.[52] On 30 August 2024, a report suggested that this submarine will be commissioned in the next 6 months.[53]

In August 2024, it was reported that a fifth Arihant class submarine is planned to be constructed.[54]

Project timeline[edit | edit source]

  • 1974: The nuclear submarine project was sanctioned following the Smiling Buddha tests under the then Prime Minister, Indira Gandhi.[55]
  • 1983: Additional funds were allotted for the project during the Fourth Indira Gandhi ministry.[55]
  • 1998: A. P. J. Abdul Kalam cut the first steel for the submarine hull at the Larsen & Toubro facility at Hazira. L&T had received the submarine hull construction contract.[44][55] Simultaneously, the submarine's design was upgraded from nuclear attack profile to nuclear-powered ballistic missile submarine following Pokhran-II.[1]
  • 12 February 2009: The Advanced Technology Vessel project, meant to deliver three submarines, is part of a $2.9 billion programme to build five nuclear submarines. As per the then Defence Minister, A. K. Antony, the first submarine was in the final stages of construction after supply chain bottlenecks were cleared and DRDO was already developing submarine-launched ballistic missile.[21][56] The project was conceived in 1970s and operationalised in 1980s, though public acknowledgement never came from official sources until this announcement by the defence minister.[57] There were delays to miniaturise the nuclear reactor core for the submarine and Russian technology help was sought to solve the issues without delays. Another factor that resulted in delays was lack of metallurgical expertise and lack of experience of Indian hull makers on the chosen material for the submarine. The successful development of a nuclear submarine came after two failed attempts in the 1970s and 1980s.[58]
  • 16 July 2009: Multiple reports suggested that the first vessel under the Advanced Technology Vessel would be launched by Gursharan Kaur, the wife of the then Prime Minister, Manmohan Singh, on 26 July 2009. The ceremony would be held in Naval Dockyard (Visakhapatnam). The vessel was named INS Arihant, meaning "destroyer of enemies". The design is based on Charlie-I submarines, while both the displacement and submerged speed are higher than the Charlie-I designs. While being launched, the dry dock in the Shipbuilding Centre in Visakhapatnam will be flooded and the submarine would be moved out of the SBC. The vessel would be then towed to a nearby pier for harbour trials during which, the nuclear power plant and auxiliary systems would be validated before its sea trials in the Bay of Bengal. The submarine was expected to be commissioned within two to three years. Meanwhile, hull sections of two additional ATVs have been completed in the Hazira facility of Larsen & Toubro and are to be transported to the SBC soon after Arihant exits the dock space.[59][60][56]
  • 26 July 2009: The first submarine of the class, Arihant, was launched into the water. The launch took place after three decades of initiating the design stage of the project. The Defence Minister would also attended the event. The harbour acceptance and system trials was scheduled for one year. The submarine was built at a cost of $2.9 billion.[61] Meanwhile, many expected that the operationalisation of the submarine would take much longer than two years.[62] Harbour acceptance trials and followed by sea acceptance trials, including the surface and sub-surface domains, respectively, were to be conducted before commissioning the submarine.[20] Even the nuclear reactor was yet to be fitted onboard and would be followed by the reactor reaching criticality, which would be a milestone.[63] The submarine, equipped with Sagarika missiles,[20] would serve as a technology demonstrator for the following nuclear submarines.[64][2]
  • 9 August 2014: The submarine's nuclear reactor became critical for the maiden time after four years of harbour acceptance patrol. The Navy wanted the submarine ready for deterrent patrol in 2014. Meanwhile, the second submarine was already at an advanced stage of construction at the SBC and could be launched in a year later.[65]
  • 13 December 2014: Arihant was entered sea for the first time[66] after being flagged off for extensive sea trials following harbour trials.[67] The sea acceptance trials for the submarine was initially slated for February 2012.[22]
  • 25 November 2015: A dummy or unarmed B-05 Sagarika missile was successfully test fired from INS Arihant from a depth of 20 metres.[55][68]
  • 31 March 2016: The K-4 missile was successfully tested from INS Arihant, 45 nautical miles away from the Vishakhapatnam coast. The missile with a dummy payload was launched from the submarine in full operational configuration. The trial was carried out with the support of the personnel of Strategic Forces Command (SFC) while the DRDO provided all the logistics.[69][70][71]
  • August 2016: The first boat of the class, INS Arihant, was commissioned.[5][72]
  • 19 November 2017: The second submarine, christened Arighaat, was launched by the then defence minister, Nirmala Sitharaman, with a low-profile, traditional ceremony. The vessel was floated out after flooding the drydock. Reportedly, commissioning of the vessel would take three years. It has an indigenous content of 60%. The third (S4) and fourth (S4*) submarine, with eight launcher units, was expected to be launched in 2020 and 2022, respectively.[1]
  • July 2018: The submarine was reportedly ready to be fully operationalised with several weapons firing trials and deep diving trials off the coast of Visakhapatnam having been completed since five months earlier. The submarine was being accompanied by RFS Epron, a Russian-origin Prut-class submarine rescue ship which arrived in India on 1 October 2017.[73]
  • 11–12 August 2018: The B-05 missile system was fired twice on 11th and once on 12th of August from INS Arihant and was operationalised two decades since the missile systems development commenced. All the missiles followed the designated trajectories and were fired 10 km away from Visakhapatnam from a depth of 20 m.[74]
  • 4 November 2018: Arihant completed its first deterrence patrol for 20 days.[3][75][4]
  • 29 August 2024: Arighaat commissioned.[76]
  • 16 October 2024: The fourth and final submarine of the class, with an indigenous content of 75% and equipped with K4 missiles, was launched.[77]
  • 2 December 2025: Aridhaman had entered the final stages of trials and was expected to be commissioned soon.[78]
  • 30 December 2025: The fourth submarine, S4*, had reportedly departed the harbour for sea trials a week earlier and is expected to be commissioned in early 2027. Meanwhile, Aridhaman, the third unit had completed its sea trials a few weeks ago and is now to be commissioned in early 2026 after being delivered.[79][80]
  • 5 January 2026: A report suggested that the final submarine, so far referred to as S4*, will be named INS Arisudan. The name has been proposed by the ship-naming committee of the Indian Navy. The name is yet to be receive clearance by the defence ministry and eventually, the President of India, who is also the Supreme Commander of the Armed Forces.[81]

Ships in class[edit | edit source]

Name Pennant Subclass Displacement (surfaced) Laid down Launch Sea trials begin Sea trials completed Commissioned Status
Arihant (S2)[1][82] SSBN 80[83] Arihant subclass 6,000 tonnes 2004[84] 26 July 2009[61] 13 December 2014[85] 23 February 2016[86] August 2016 Active
Arighaat (S3)[87] SSBN 81 2009[84] 19 November 2017[88][89] 8 January 2018[90] March 2021[91] 29 August 2024[50][76]
Aridhaman (S4)[92] SSBN 82 Aridhaman subclass 7,000 tonnes 2018[93] 23 November 2021[94] December 2025[79][80] April–May 2026 (expected)[95][96] Sea trials completed
Arisudan

(S4*)[81]

SSBN 83 2020 16 October 2024[97] December 2025[79][80] 2027

(expected)[95]

Sea trials[95]

Timeline[edit | edit source]

Date Event
19 May 1998 Confirmation of ATV project by the then Defence Minister George Fernandes
11 November 2003 Prototype nuclear reactor becomes critical
22 September 2006 Nuclear reactor is declared operational
2007 Design of S4 is modified to allow four more launch tubes.[1]
26 July 2009 Lead vessel of the class, INS Arihant, is formally launched
2012 Additional unit S4* is cleared to avoid idling of production line.[1]
10 August 2013 Arihant's on-board nuclear reactor attains criticality
13 December 2014 INS Arihant begins extensive sea & weapons trials
25 November 2015 INS Arihant successfully test-fired dummy B5 missile
31 March 2016 INS Arihant successfully test-fired K4 missile
August 2016 INS Arihant commissioned.[5]
19 November 2017 INS Arighaat launched[1]
8 January 2018 INS Arighaat to begin sea trials[98]
5 November 2018 INS Arihant completed its first deterrence patrol[99]
March 2021 INS Arighaat's sea trials are completed.
November 2021 INS Aridhaman is speculated to be launched.[94]
29 August 2024 INS Arighaat officially commissioned.[50]
16 October 2024 S4* launched[77]
2026 S4 commissioning expected[78]

See also[edit | edit source]

References[edit | edit source]

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 Unnithan, Sandeep (7 December 2017). "A peek into India's top secret and costliest defence project, nuclear submarines". India Today. Archived from the original on 11 December 2017. Retrieved 11 December 2017.
  2. 2.0 2.1 2.2 Pandit, Rajat (17 July 2009). "India set to launch nuclear-powered submarine". The Times of India. Archived from the original on 12 April 2025. Retrieved 17 March 2016.
  3. 3.0 3.1 "Prime Minister felicitates crew of INS Arihant on completion of Nuclear Triad" (Press release). Press Information Bureau. 5 November 2018. Retrieved 9 December 2025.
  4. 4.0 4.1 "INS Arihant completes India's nuclear triad, PM Modi felicitates crew". The Economic Times. 6 November 2018. ISSN 0013-0389. Retrieved 9 December 2025.
  5. 5.0 5.1 5.2 "India set to complete N-triad with Arihant commissioning". The Times of India. Archived from the original on 20 October 2016. Retrieved 18 October 2016.
  6. Ashish Singh (17 October 2016). "What is INS Arihant?". NewsX. Archived from the original on 27 October 2016. Retrieved 30 October 2016.
  7. "India's first nuclear submarine INS Arihant ready or operations, passes deep sea tests". The Economic Times. 23 February 2016. Archived from the original on 24 February 2016. Retrieved 23 February 2016.
  8. Marcus, Jonathan (10 August 2013). "Indian-built Arihant nuclear submarine activated". BBC. Archived from the original on 12 October 2013. Retrieved 12 October 2013.
  9. "India launches its latest nuclear submarine with 75% indigenous tech: Here's what the new S4 means for regional security". The Economic Times. 24 October 2024. ISSN 0013-0389. Retrieved 26 October 2024.
  10. "1971 War: How Russia sank Nixon's gunboat diplomacy". Russia Beyond. Archived from the original on 6 November 2025. Retrieved 29 April 2016.
  11. "US Fleet in Bay of Bengal: A game of deception". The Daily Star. 15 December 2013. Retrieved 29 April 2016.
  12. Krishnan Simha, Rakesh (20 December 2011). "US-Soviet Actions in 1971 Indo-Pakistani War". indrus.in. Indrus.in. Archived from the original on 8 April 2013. Retrieved 22 April 2013.
  13. 13.0 13.1 13.2 "Arihant: the annihilator". Indian Defence Review. 25 October 2010. Archived from the original on 12 July 2010. Retrieved 8 January 2012.
  14. Das, Premvir (30 July 2009). "Project 932". Business Standard. Archived from the original on 10 May 2013. Retrieved 24 April 2013.
  15. "India's SNS Project Report". Fas.org. Archived from the original on 23 October 2012. Retrieved 24 April 2013.
  16. "George defends position on China". Indian Express. 19 May 1998. Archived from the original on 13 June 2016. Retrieved 24 February 2011.
  17. Pike, John. "Advanced Technology Vessel (ATV)". Globalsecurity.org. Archived from the original on 26 December 2010. Retrieved 24 January 2011.
  18. "First indigenous nuclear sub is inducted into the navy". DNA. 26 July 2009. Archived from the original on 29 July 2009. Retrieved 24 January 2011.
  19. "India's nuclear sub still a distant dream". Rediff. 16 February 2001. Archived from the original on 22 October 2012. Retrieved 24 January 2011.
  20. 20.0 20.1 20.2 "Nuclear submarine Arihant to be fitted with K-15 ballistic missiles". The Hindu. Chennai, India. 27 July 2009. Archived from the original on 29 July 2009. Retrieved 17 March 2016.
  21. 21.0 21.1 "India nuclear sub project near completion". Reuters. 12 February 2009. Archived from the original on 5 March 2016. Retrieved 24 January 2011.
  22. 22.0 22.1 "India to achieve N-arm triad in February". The Times of India. 2 January 2012. Archived from the original on 26 March 2013. Retrieved 17 March 2016.
  23. "Final test of K-15 ballistic missile on Tuesday". 25 February 2008. Archived from the original on 21 September 2012. Retrieved 24 January 2012.
  24. 24.0 24.1 24.2 Bedi, Rahul (22 December 2020). "India to commission second Arihant-class submarine in 2021". Janes. Retrieved 23 December 2025.
  25. Subramanian, T.S. (15 August 2009). "Nuclear Arm". The Frontline. Vol. 26, no. 17. Archived from the original on 26 May 2013. Retrieved 2 June 2015.
  26. 26.0 26.1 "SSBN Arihant Class Submarine, India". naval-technology.com. Archived from the original on 2 May 2013. Retrieved 22 April 2013.
  27. 27.0 27.1 Subramanian, T.S. (2 August 2009). "PWR building shows indigenous capability". The Hindu. Chennai, India. Archived from the original on 8 August 2009. Retrieved 17 March 2016.
  28. "Arihant Class Submarine - Naval Technology".
  29. "The secret undersea weapon". India Today. 17 January 2008. Archived from the original on 31 December 2011. Retrieved 8 January 2012.
  30. Malhotra, Jyoti (12 August 2013). "How Indias pride INS Arihant was built". Business Standard India.
  31. "The secret 'K' missile family". India Today. 20 November 2010. Archived from the original on 7 August 2011. Retrieved 8 January 2012.
  32. 32.0 32.1 32.2 "Indian Navy Ups the Stakes With Newest Nuclear Submarine INS Aridaman". The Wire. 3 December 2025. Retrieved 12 January 2026. This length increase – earning it the nickname "Arihant Stretch" in overseas naval circles – was to accommodate an expanded vertical missile launch system, now doubled to eight tubes, enabling the SSBN to carry either eight K-4 submarine-launched ballistic missiles (SLBMs), with a range of 3,500 km, or 24 K-15 SLBMs striking 750 km away.
  33. "Arihant – Advanced Technology Vessel (ATV)". Global Security. Archived from the original on 10 January 2012. Retrieved 8 January 2012.
  34. "Leased Russian n-submarine to set sail for India this month end". 15 December 2011. Archived from the original on 5 January 2012. Retrieved 8 January 2012.
  35. 35.0 35.1 35.2 Nathan Powell. "The Arihant-Class SSBN and the Advent of Sea-Based Nuclear Forces in India, China, and Pakistan". Project on Nuclear Issues: A Collection of Papers from the 2017 Conference Series and Nuclear Scholars Initiative: 141–142.
  36. "High fissile fuel in nuclear submarine lasts long". The Hindu. Chennai, India. 5 November 2009. Archived from the original on 5 November 2012. Retrieved 17 March 2016.
  37. "INS Arihant is an Indian design: Anil Kakodkar". The Hindu. Chennai, India. 16 August 2009. Archived from the original on 19 August 2009. Retrieved 17 March 2016.
  38. Shekhar, G.C. (3 August 2009). "Unveiled: Arihant's elder brother". Telegraph India. Calcutta, India. Archived from the original on 17 January 2016. Retrieved 17 March 2016.
  39. Venkatesh, M.R. (2 August 2009). "Arihant propulsion reactor unveiled". Hindustan Times. Retrieved 17 March 2016.[dead link]
  40. "Naval Research Board". DRDO. Archived from the original on 16 March 2016. Retrieved 17 March 2016.
  41. "Larsen and Toubro's Contribution to Arihant-class submarine" (PDF) (Press release). 26 July 2009. Retrieved 17 March 2016.[permanent dead link]
  42. "We played a vital role in Arihant: L&T". Business Standard. 27 July 2009. Retrieved 17 January 2026.
  43. "India's first Indigenous nuclear submarine". Jeywin. Retrieved 24 April 2013.{{cite web}}: CS1 maint: deprecated archival service (link)
  44. 44.0 44.1 "Private sector played a major role in Arihant". DNA. 27 April 2009. Archived from the original on 16 September 2012. Retrieved 17 March 2016.
  45. Mundhra, Shreya (2 January 2022). "Boosting Indian Navy's Firepower, DRDO Launches Nuclear Submarine With 'Vertical Launch System'". Latest Asian, Middle-East, EurAsian, Indian News. Retrieved 1 February 2024.
  46. Sharma, Suman (12 June 2010). "Navy creating a new base for nuke submarines". Daily News & Analysis. Archived from the original on 12 January 2026. Retrieved 11 June 2010.
  47. "On national security interests, Govt moves Hindustan Shipyard to Defence ministry". The Times of India. PTI. 24 December 2009. Archived from the original on 26 September 2012. Retrieved 11 June 2010.
  48. "India 'fully ready' to add to fleet 2nd submarine with nuclear-tipped missiles". The Times of India. 11 August 2024. ISSN 0971-8257. Retrieved 11 August 2024.
  49. "India set to commission its second nuclear-missile submarine". The Economic Times. 11 August 2024. ISSN 0013-0389. Retrieved 12 August 2024.
  50. 50.0 50.1 50.2 "Second Arihant-Class submarine 'INS Arighaat' commissioned into Indian Navy in the presence of Raksha Mantri in Visakhapatnam". Press Information Bureau. 29 August 2024. Retrieved 29 August 2024.
  51. "DRDO on long range Pralay, K5 to stalemate China soon". THE NEW INDIAN EXPRESS. Retrieved 15 December 2018.
  52. "Third Indian N-powered ballistic missile submarine to be inducted this year". Deccan Herald. Retrieved 4 February 2025.
  53. "Amid China standoff, India set to boost naval power with 3rd N-sub in 6 months". The Times of India. 30 August 2024. ISSN 0971-8257. Retrieved 30 August 2024.
  54. Kumar, Bhaswar (30 August 2024). "'More advanced': 10 key points on India's second nuclear sub INS Arighat". Business Standard. Retrieved 28 September 2024.
  55. 55.0 55.1 55.2 55.3 "N-capable Arihant submarine successfully test-fires unarmed missile". Business Standard. 26 November 2015. Retrieved 8 December 2025.
  56. 56.0 56.1 "PM to launch indigenous nuke submarine by month-end". MSN. 16 July 2009. Retrieved 19 July 2009.{{cite news}}: CS1 maint: deprecated archival service (link)
  57. "Indigenous nuclear submarine goes on trial". The Hindu. Chennai, India. 19 July 2009. Archived from the original on 22 July 2009. Retrieved 19 July 2009.
  58. Sud, Hari (14 August 2009). "India's nuclear submarine and the Indian Ocean". upiasia.com. Archived from the original on 28 July 2011. Retrieved 24 January 2011.
  59. "Exclusive: PM's wife to launch INS Arihant, India's first nuclear submarine". India Today. 16 July 2009. Archived from the original on 8 December 2025. Retrieved 8 December 2025.
  60. "Indian indigenous nuclear sub to be unveiled on 26 July: report". domain-b.com. 16 July 2009. Archived from the original on 21 September 2011. Retrieved 24 January 2011.
  61. 61.0 61.1 "Arihant central to India's strategic capability: Antony". India Today. 26 July 2009. Retrieved 8 December 2025.
  62. PTI (26 July 2009). "Arihant to take long time to become operational: Experts". India Today. Retrieved 8 December 2025.
  63. "defence.professionals | defpro.com". www.defpro.com (in Deutsch). 28 July 2009. Archived from the original on 17 July 2011. Retrieved 8 December 2025.
  64. "Home-made nuke sub INS Arihant to be inducted in 2 years". The Times of India. 3 December 2009. Archived from the original on 7 December 2009. Retrieved 17 March 2016.
  65. "INS Arihant reactor goes critical, submarine to start sea trials | Watch activation video". India Today. 10 August 2013. Archived from the original on 8 December 2025. Retrieved 8 December 2025.
  66. "INS Arihant sails out of harbour". The Hindu. 13 December 2014. Archived from the original on 17 January 2016. Retrieved 15 December 2014.
  67. "India's nuclear submarine Arihant flagged off for sea trials". The Economic Times. 13 December 2014. Archived from the original on 18 April 2023. Retrieved 15 December 2014.
  68. Rout, Hemant Kumar (27 November 2015). "First Ejection Test of Underwater Missile From Arihant Submarine Successful". The New Indian Express. Retrieved 8 December 2025.
  69. "EXPRESS EXCLUSIVE: Maiden Test of Undersea K-4 Missile From Arihant Submarine". The New Indian Express. Archived from the original on 13 June 2016. Retrieved 8 December 2025.
  70. Panda, Ankit. "India Successfully Tests Intermediate-Range Nuclear-Capable Submarine-Launched Ballistic Missile". thediplomat.com. Retrieved 7 September 2024.
  71. Bhat, Aditya (9 April 2016). "DRDO's nuclear capable K-4 underwater missile test-fired again, this time from INS Arihant: Report". www.ibtimes.co.in. Retrieved 7 September 2024.
  72. "Satisfied with nuclear sub Arihant trials: Navy Chief". Tribune India. Archived from the original on 4 March 2016. Retrieved 17 March 2016.
  73. Pubby, Manu (14 July 2018). "India's first nuclear submarine INS Arihant ready for operations, passes deep sea tests". The Economic Times. ISSN 0013-0389. Retrieved 9 December 2025.
  74. Rout, Hemant Kumar (19 August 2018). "Nuke-capable submarine-launched missile operationalised, India in select triad club". The New Indian Express. Retrieved 8 December 2025.
  75. Unnithan, Sandeep (5 November 2018). "INS Arihant returned yesterday from 20-day deterrent patrol". India Today. Retrieved 9 December 2025.
  76. 76.0 76.1 "India commissions INS Arighat: Know all about Navy's 2nd nuclear-powered submarine". The Times of India. 29 August 2024. ISSN 0971-8257. Retrieved 29 August 2024.
  77. 77.0 77.1 Gupta, Shishir (22 October 2024). "India Launches 4th nuclear-missile submarine". Hindustan Times. Retrieved 22 October 2024.
  78. 78.0 78.1 Sharma, Shivani; Negi, Manjeet (2 December 2025). "Navy to get INS Aridhaman, third Indian-made nuclear submarine". India Today. Retrieved 2 December 2025.
  79. 79.0 79.1 79.2 "CHAKRA EXCLUSIVE: India's fourth SSBN sails out for sea trials". chakranewz. 29 December 2025. Retrieved 30 December 2025.
  80. 80.0 80.1 80.2 Militar, Redaccion Zona (30 December 2025). "India is reported to have begun sea trials of the fourth of its new Arihant-class nuclear-powered ballistic missile submarines". Zona Militar. Retrieved 31 December 2025.
  81. 81.0 81.1 "Arihant class nuclear-powered submarine S4* likely to be named INS Arisudan". Hindustan Times. 5 January 2026. Retrieved 5 January 2026.
  82. Anandan, S. (20 December 2014). "INS Arihant may be of limited utility". The Hindu. ISSN 0971-751X. Retrieved 30 June 2019.
  83. "20 years after Pokhran II, India makes giant nuclear leap". Hindustan Times. 6 November 2018. Retrieved 25 November 2018.
  84. 84.0 84.1 Commodore Stephen Saunders, ed. (2016). "India". Jane's Fighting Ships 2016–2017 (119th ed.). Coulsdon: Jane's Information Group. p. 336. ISBN 978-0710631855.
  85. "INS Arihant sails out of harbor". The Hindu. 13 December 2014. Archived from the original on 17 January 2016. Retrieved 22 December 2014.
  86. Pubby, Manu. "India's first nuclear submarine INS Arihant ready for operations, passes deep sea tests". The Economic Times. Retrieved 9 September 2021.
  87. "India's Nuclear Triad is now Fully Operational". Vivekananda International Foundation. 11 December 2018. Retrieved 2 July 2019.
  88. Peri, Dinakar; Joseph, Josy (15 October 2017). "A bigger nuclear submarine is coming". The Hindu. Archived from the original on 3 March 2018. Retrieved 15 October 2017.
  89. Bedi, Rahul (11 December 2017). "India quietly launches second SSBN". IHS Jane's Defence Weekly. Archived from the original on 12 December 2017. Retrieved 11 December 2017.
  90. Joseph, Dinakar Peri & Josy (8 January 2018). "INS Arihant left crippled after 'accident' 10 months ago". The Hindu. ISSN 0971-751X. Retrieved 9 September 2021.
  91. "Vikrant, nuclear submarine commissioning to ring in 75th Independence anniversary celebrations". India Today. Retrieved 9 September 2021.
  92. Saurav, Jha. "India's Undersea Deterrent". The Diplomat. Archived from the original on 8 April 2016. Retrieved 9 April 2016.
  93. "A bigger nuclear submarine is coming". www.thehindu.com. The Hindu. 2017. Retrieved 25 June 2025.
  94. 94.0 94.1 "India Quietly Launches 3rd Arihant-class Nuclear-powered Submarine, Can Carry 8 Ballistic Missiles: Report". News18. 31 December 2021. Retrieved 31 December 2021.
  95. 95.0 95.1 95.2 "CHAKRA EXCLUSIVE: India's fourth SSBN sails out for sea trials". Chakranewz. 29 December 2025. Retrieved 30 December 2025.
  96. "Third Indian N-powered ballistic missile submarine to be inducted this year". www.deccanherald.com. Deccan Herald. 2025. Retrieved 25 June 2025.
  97. Peri, Dinakar (22 October 2024). "India's fourth nuclear submarine launched into water". The Hindu. ISSN 0971-751X. Retrieved 29 November 2024.
  98. Pubby, Manu (24 August 2017). "Exclusive: 'Aridaman', India's second nuclear-armed submarine, is ready for launch". ThePrint. Archived from the original on 25 August 2017. Retrieved 24 August 2017.
  99. "India's nuclear triad is complete with INS Arihant ending its first deterrence patrol". The Hindu. 5 November 2018. ISSN 0971-751X. Retrieved 14 March 2023.

External links[edit | edit source]

Template:SSBN classes in service