Created by Caleb78G9218343
Last edited April 15, 2026


Yellow Line
Overview
StatusOperational
LocaleGandhinagar
TerminiMotera Stadium
Mahatma Mandir
Stations21
Service
TypeRapid transit
SystemAhmedabad Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockHyundai Rotem
History
Opened16 September 2024; 22 months ago (16 September 2024) (Sector-1 to GNLU and Motera Stadium)
Technical
Line length23.84 km (14.81 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) (Standard gauge)
Electrification750V DC Third Rail
Route map
Error creating thumbnail: File with dimensions greater than 12.5 MP


The Yellow Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India. The construction was started in January 2021 and was completed in January 2026.

History[edit | edit source]

The Government of Gujarat approved the Phase-2 of Ahmedabad Metro in October 2017 and revised it in October 2018. In February 2019, the Union cabinet approved the Phase-2 worth cost of 5,384.17 crore (US$750 million). It will extend the north–south corridor from Motera in Ahmedabad to Mahatma Mandir in Gandhinagar (23.838 km (14.812 mi)) with a branch line from Gujarat National Law University (GNLU) linking Pandit Deendayal Energy University (PDEU) and GIFT City (5.416 km). The Phase-2 will have total 28.26 km (17.56 mi)-long elevated corridor with 22 stations.[1][2][3]

The tendering for the Phase 2 began in January 2020.[4][5] On 18 January 2021, the foundation stone of the Phase-2 was laid by Prime Minister Modi.[6]

In February 2023, Titagarh Rail Systems won a contract worth 350 crore (US$49 million) for providing rolling stock for the Phase-2.[7][8]

The trial run of Phase-2 started in February 2024 between GNLU and Dholakuva Circle stations.[9][10] The Yellow Line connecting Sector 1 station of Gandhinagar with the Red Line's Motera Stadium along with six new stations on Yellow Line were inaugurated on 16 September 2024 by Prime Minister Narendra Modi and was open to the public on 17 September 2024.[11][12][13][14] Seven new stations on Yellow Line were opened to public on 27 April 2025.[15] Juna Koba and Koba Gaam stations were opened on 28 September 2025.[16] The final 5.36-kilometre corridor of the Yellow Line, from Sachivalaya (Secretariat) to Mahatma Mandir, was inaugurated on 11 January 2026 by Prime Minister Modi.[17]

List of stations[edit | edit source]

Following is a list of stations on this route:[18][19]

style="text-align:center; background:#Template:Rcr;" colspan="8" | Yellow Line
# Station Name Opening Connections[20] Layout
English Gujarati
1 Template:Stl મહાત્મા મંદિર 11 January 2026 Template:Ric Gandhinagar Capital Elevated
2 Sector-24 સેક્ટર-24 11 January 2026 City Bus Stop Elevated
3 Sector-16 સેક્ટર-16 11 January 2026 City Bus Stop Elevated
4 Template:Stl જૂના સચિવાલય 11 January 2026 City Bus Stop Elevated
5 Template:Stl અક્ષરધામ 11 January 2026 None Elevated
6 Template:Stl સચિવાલય 27 April 2025 City Bus Stop Elevated
7 Sector-10A સેક્ટર-10એ 27 April 2025 City Bus Stop Elevated
8 Sector-1 સેક્ટર-1 16 September 2024 City Bus Stop Elevated
9 Template:Stl ઇન્ફોસિટી 16 September 2024 City Bus Stop Elevated
10 Template:Stl ધોળાકુવા સર્કલ 16 September 2024 None Elevated
11 Template:Stl રાંદેસણ 16 September 2024 None Elevated
12 Template:Stl રાયસન 16 September 2024 None Elevated
13 Template:Stl જી એન એલ યુ 16 September 2024 Template:Rcb Elevated
14 Template:Stl કોબા ગામ 28 September 2025 None Elevated
15 Template:Stl જૂના કોબા 28 September 2025 None Elevated
16 Template:Stl કોબા સર્કલ 27 April 2025 None Elevated
17 Template:Stl નર્મદા કેનાલ 27 April 2025 None Elevated
18 Template:Stl તપોવન સર્કલ 27 April 2025 None Elevated
19 Template:Stl વિશ્વકર્મા કોલેજ 27 April 2025 None Elevated
20 Template:Stl કોટેશ્વર રોડ 27 April 2025 None Elevated
21 Template:Stl મોટેરા સ્ટેડિયમ 30 September 2022 Template:Rcb Elevated

Map[edit | edit source]

Template:Rapid transit OSM map

References[edit | edit source]

  1. "Gujarat nod for Rs 6,758crore Metro Phase II". The Times of India. Retrieved 18 January 2018.
  2. Nair, Avinash (20 October 2018). "Ahmedabad Metro Rail: After Centre objects, Metro rail link to GIFT City shortened by 6 km". The Indian Express. Retrieved 21 October 2018.
  3. "Ahmedabad Metro Phase 2 gets Modi Cabinet clearance ahead of Phase 1 inauguration on 4 March". The Financial Express. 21 February 2019. Retrieved 4 March 2019.
  4. "GMRC Invites Bids for Ahmedabad Metro's Phase 2 Construction". The Metro Rail Guy. 20 January 2020. Retrieved 20 April 2020.
  5. "Ahmedabad Metro Phase 2 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 20 April 2020.
  6. "'Very important gifts for Ahmedabad, Surat': PM Modi launches metro rail projects in Gujarat". www.timesnownews.com. Retrieved 18 January 2021.
  7. "Titagarh Rail Systems wins ₹3.5 bn contract for Ahmedabad Metro". Construction World. 15 February 2023.
  8. "Ahmedabad Metro Phase 2: Titagarh Rail Systems awarded Rs 350-cr contract for 10 trains". The Indian Express. 31 August 2023. Retrieved 22 November 2023.
  9. "Ahmedabad Metro Phase II trial run likely in June". Times of India. 20 April 2023.
  10. "A'bad-G'nagar Metro phase-2 trial run starts". Ahmedabad Mirror. Retrieved 24 February 2024.
  11. "PM Modi Inaugurated Ahmedabad Metro Phase 2 And Vande Metro - Metro Rail News". 17 September 2024. Retrieved 18 September 2024.
  12. "Ahmedabad Metro connectivity to GIFT City by early 2024, says GMRC". 19 September 2021.
  13. "PM Modi Flags Off Ahmedabad-Gandhinagar Metro Phase-II, Takes Rail Ride". News18. 16 September 2024. Retrieved 17 September 2024.
  14. "PM Modi inaugurates 2nd phase of Ahmedabad Metro Rail Project". India Today. 16 September 2024. Retrieved 17 September 2024.
  15. "Ahmedabad Metro route extended to Secretariat in Gandhinagar from Sunday: 7 new stations added". english.gujaratsamachar.com. Retrieved 26 April 2025.
  16. DeshGujarat (26 September 2025). "Two more stations to become operational on Ahmedabad-Gandhinagar Metro Rail corridor". DeshGujarat. Retrieved 26 September 2025.
  17. DeshGujarat (11 January 2026). "PM Modi inaugurates Sachivalaya-Mahatma Mandir route of Ahmedabad-Gandhinagar Metro". DeshGujarat. Retrieved 25 January 2026.
  18. DeshGujarat (13 September 2024). "Ahmedabad - Gandhinagar Metro train service from Sept 16, but 7 stations en-route to open later". DeshGujarat. Retrieved 8 December 2024.
  19. "PM Modi Inaugurates Remaining Phase 2 Stretch Of Metro Service In Gandhinagar". 11 January 2026. Retrieved 12 January 2026.
  20. "Multi Model Integration". Gujarat Metro Rail Corporation (GMRC) Limited. Retrieved 14 April 2026.

Template:Ahmedabad Metro navbox