Utkal Gourab Madhusudan Setu | |
|---|---|
![]() View of Utkal Gourab Madhusudan Setu | |
| Coordinates | 20°29′13″N 85°48′59″E / 20.486833°N 85.816491°E |
| OS grid reference | Template:Gbmappingsmall |
| Carries | Road |
| Crosses | Mahanadi River |
| Locale | Cuttack-Nuapatna |
| Characteristics | |
| Material | RCC |
| Total length | 2,583 metres (8,474 ft) |
| History | |
| Opened | 01 April 2018 |
| Location | |
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
Utkal Gourab Madhusudan Setu is a bridge connecting Cuttack and Athagarh. This bridge over river Mahanadi reduces distance between Cuttack, Dhenkanal by 16 kilometres (9.9 mi). The bridge was inaugurated by Naveen Patnaik and opened to public on 01.04.2018. Length of this bridge is 2,583 metres (8,474 ft) long.[1] It is named after Madhusudan Das, famed lawyer, freedom fighter.[2]
References[edit | edit source]
- ↑ Pioneer, The. "CM opens Madhusudan Setu in Cuttack". The Pioneer. Retrieved 2019-12-02.
- ↑ "Odisha names new bridge on Mahanadi as Utkal Gourab Madhusudan Setu". OdishaSunTimes.com. 2018-03-29. Retrieved 2019-12-02.
