Uppur Thermal Power Project

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)


Uppur Superctical Thermal Power Project
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value).
Uppur Supercritical Thermal Power Project
CountryIndia
LocationRamanathapuram, Tamil Nadu
Coordinates9°35′05.4″N 78°54′31.0″E / 9.584833°N 78.908611°E / 9.584833; 78.908611Coordinates: 9°35′05.4″N 78°54′31.0″E / 9.584833°N 78.908611°E / 9.584833; 78.908611
StatusUnder Construction
Construction beganMarch 2016
Construction costRs 12,655 crores
Operator(s)Tamil Nadu Generation and Distribution Corporation (TANGEDCO)
Thermal power station
Primary fuelCoal
Power generation
Script error: No such module "Infobox power station".

Uppur Supercritical Thermal Power Project is located in Uppur and near Tiruvadanai, Ramanathapuram District in Tamil Nadu. The power plant is one of the coal based power plants of TANGEDCO. This project is being constructed by BHEL, L&T and Reliance Infrastructure.[1]

Construction[edit]

RIL was awarded the engineering, procurement and construction contract in the BoP package and allied civil works, BHEL was awarded the boiler, turbine and generator contract and L&T was awarded the seawater intake and outfall system contract.[2][3]

Materials for erection brought to the site and foundation process under progress. Foundation for two units of plant under Bharat Heavy Electricals Limited has already been completed.[4] ESP 1 & ESP 2 foundation completed and now erection activity is going on. The boiler foundation for unit 1 & 2 also completed with the efforts of BHEL Engineers. The Structural contractors have also been mobilized. The fabrication work is in full swing. BHEL Engineers Sh Ashok Kumar, Sh Rakesh Raushan, Sh Naveen Kumar, Sh Anand Kumar & Sh Mohit J Trivedi have made their efforts to speed-up the progress but due to environmental issues things are at stand still.

Installed Capacity[edit]

Stage Unit Number Installed Capacity (MW) Date of Commissioning Status
Stage I 2x800 MW 1600 MW 2021-22 Under Constructions

See also[edit]

References[edit]

  1. "RIL set to begin work on Uppur thermal power project". The Hindu. 7 September 2018.
  2. "RIL set to begin work on Uppur thermal power project". The Hindu. 7 September 2018.
  3. https://www.tangedco.gov.in/linkpdf/uppur(25.06.2018)eng.pdf
  4. "BHEL begins boiler erection work for Uppur Thermal plant". The Hindu. 26 September 2019.