NTPL Thermal Power Station
| NTPL Thermal Power Station | |
|---|---|
| Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value). Location of the NTPL Thermal Power Station | |
| Country | India |
| Location | Harbour Estate, Thoothukudi, Tamil Nadu |
| Coordinates | 8°45′32″N 78°10′54.8″E / 8.75889°N 78.181889°ECoordinates: 8°45′32″N 78°10′54.8″E / 8.75889°N 78.181889°E |
| Status | Operational |
| Commission date | Unit 1: March 2012 Unit 2: August 2012 |
| Operator(s) | TANGEDCO, NLC India Limited |
| Thermal power station | |
| Primary fuel | Coal |
| Power generation | |
| Script error: No such module "Infobox power station". | |
| Nameplate capacity | 1000 MW |
NTPL Thermal Power Station is a 1000 MW (2×500 MW) coal-based thermal plant in the Tuticorin District of Tamil Nadu. The project is a joint venture of TANGEDCO and NLC India Limited. The units were commissioned in March and April 2015, respectively.[1]
References[edit]
- ↑
- Broad Status Report, Archived 2012-05-10 at the Wayback Machine India Central Electrical Authority, February 2015
- "It is a victory for people of Uttara Kannada district: Hanakon plant shifted to Tuticorin", Deccan Herald, January 2, 2010.