16,952
edits
(bold) Tags: Mobile edit Mobile web edit Advanced mobile edit |
CleanupBot (talk | contribs) m (clean up, added orphan, uncategorised, deadend tags) |
||
Line 1: | Line 1: | ||
{{Multiple issues| | |||
{{Dead end|date=October 2023}} | |||
{{Orphan|date=October 2023}} | |||
}} | |||
'''Vadinar Oil Terminal Ltd''' (VOTL) is an integrated oil terminal situated at Vadinar with a capacity of 58 million metric tonnes per annum (MMTPA) and handles crude oil and petroleum products.<ref>https://economictimes.indiatimes.com/industry/energy/oil-gas/panel-defers-green-nod-to-essar-firms-expansion-project/articleshow/49308838.cms</ref> | '''Vadinar Oil Terminal Ltd''' (VOTL) is an integrated oil terminal situated at Vadinar with a capacity of 58 million metric tonnes per annum (MMTPA) and handles crude oil and petroleum products.<ref>https://economictimes.indiatimes.com/industry/energy/oil-gas/panel-defers-green-nod-to-essar-firms-expansion-project/articleshow/49308838.cms</ref> | ||
Line 5: | Line 10: | ||
==Description== | ==Description== | ||
IOC currently operates two SPM terminals at Vadinar, in the south of the Gulf of Kutch for unloading of crude oil brought in tankers for transportation to shore tanks through pipelines, of which around 14 km is subsea. | IOC currently operates two SPM terminals at Vadinar, in the south of the Gulf of Kutch for unloading of crude oil brought in tankers for transportation to shore tanks through pipelines, of which around 14 km is subsea. | ||
<ref>https://energy.economictimes.indiatimes.com/news/oil-and-gas/indias-first-spm-facility-at-ioc-vadinar-berths-the-6000th-oil-tanker/94929170</ref> | <ref>https://energy.economictimes.indiatimes.com/news/oil-and-gas/indias-first-spm-facility-at-ioc-vadinar-berths-the-6000th-oil-tanker/94929170</ref> | ||
Line 18: | Line 23: | ||
== References == | == References == | ||
{{Reflist}} | {{Reflist}} | ||
{{Uncategorized|date=October 2023}} |