Created by ArianneNies1
Last edited April 24, 2026




Shatabdi Nagar
Template:RapidX Infobox station line
LocationShatabdi Nagar, Sector 5, MDA, Meerut, Uttar Pradesh 250002
 India
Coordinates28°56′51″N 77°40′25″E / 28.94761°N 77.67359°E / 28.94761; 77.67359
Owned byNCRTC
Operated byNCRTC
Line(s)Template:Rcb RRTS
Template:Rcb MRTS
PlatformsIsland platform
Platform-1 → Template:Stl
Platform-2 → Template:Stl
Tracks4
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
Other information
StatusOperational
History
Opened22 February 2026; 5 months ago (2026-02-22)
ElectrifiedTemplate:25 kV 50 Hz through overhead catenary (TBC)
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/RapidX' not found.Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Meerut Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Shatabdi Nagar RRTS station is an elevated Delhi–Meerut Regional Rapid Transit System and Meerut Metro station in Meerut district, Uttar Pradesh, India which serves as an elevated station for higher-speed trains on the Delhi–Meerut Regional Rapid Transit System that can reach speeds of up to 180 km/h. The station will be powered by solar energy, with 1,100 solar panels on the station's roof.

Shatabdi Nagar RRTS station is inaugurated on 22 February 2026.[1][2]

History[edit | edit source]

Station layout[edit | edit source]

The Shatabdi Nagar RRTS station will have 2 elevated station platforms, with the under constructed station building located underneath the platform level. The RRTS station will have 2 island platforms, which will serve 2 rail tracks for Meerut Metro services and 2 rail tracks for RapidX services.

It will have three levels – platform, concourse and street level. Shatabdi Nagar RRTS station will be 215 meters long and 26 meters wide. The rail tracks will be constructed at a height of 24 meters above the ground level.

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Platform 1
Meerut Metro
Towards → Modipuram
Next Station: Brahmapuri
Island platform | P1 Doors will open on the right | P2 Doors will open on the left
Platform 2
RRTS Line
Towards → Modipuram
Next Station: Begumpul
Platform 3
RRTS Line
Towards ← Template:Stl
Next Station: Meerut South
FOB, Island platform | P3 Doors will open on the left | P4 Doors will open on the right
Platform 4
Meerut Metro
Towards ← Template:Stl
Next Station: Rithani
L2

References[edit | edit source]

  1. "PM inaugurates India's fastest metro in Meerut, entire Namo Bharat corridor". India Today. 22 February 2026. Retrieved 22 February 2026.
  2. "Delhi–Meerut RRTS now fully operational: Will improved connectivity drive real estate demand along the corridor?". Hindustan Times. 22 February 2026. Retrieved 22 February 2026.

Template:RapidX