Lucknow–Kanpur Expressway

From Bharatpedia, an open encyclopedia

Lucknow–Kanpur Expressway
Route information
Length66 km (41 mi)
Major junctions
FromLucknow
ToKanpur
Highway system


The Lucknow–Kanpur Expressway (लखनऊ–कानपुर एक्सप्रेसवे), designated as National Expressway 6, is an 66 km (41 mi), 6-lane access controlled expressway road project in India's Uttar Pradesh state. The expressway will connect Kanpur and Lucknow and will run parallel to NH-27 which connects Kanpur and Lucknow with a distance of about 8.5 km (5.3 mi) between existing and proposed parallel roads. The expressway will start from its junction with NH-27 near Shaheed Path (km 11.000 of existing NH-27) connecting Bani, Kantha, Amarsas and terminating at its junction with NH No. 27 (km 71.300 of existing NH-27) near Kanpur in the State of Uttar Pradesh.[1]

Status updates[edit]

  • Nov 2018: Detailed Project Report for 4500 crore project finalised and submitted to the Government of Uttar Pradesh .[2]
  • 07 Mar 2019: Foundation stone laid down by Union Ministers Rajnath Singh and Nitin Gadkari for this project.[3]
  • May 2019: 90% land to be acquired by June 2019 followed by tendering. Civil work is expected to start by August 2019.[4]
  • Feb 2020: Notification for land acquisition to be issued soon.[5]
  • Aug 2020: Construction to start by March 2021[6] and expressway to be ready by March 2023.[7]
  • Sep 2020: Land acquisition under progress. Civil construction work to start in April 2021 and expressway to be ready by October 2023.[8]
  • Dec 2020: Lucknow Kanpur Expressway, declared as NE 6 on December 15, 2020.[9]
  • Feb 2021: Land acquisition done.[10] Civil engineering work is expected to start in July 2021, and thereafter, it is expected to take 30 more months for project completion.[11]

See also[edit]

References[edit]

  1. Gazette of India notification dated 15 December 2020
  2. Pandey, Alok (13 November 2018). "बधाई हो : कानपुर-लखनऊ एक्सप्रेस-वे की डीपीआर हुई फाइनल" [Congratulations: Kanpur-Lucknow Expressway DPR final]. Rajasthan Patrika (in Hindi). Archived from the original on 29 April 2019.{{cite news}}: CS1 maint: unrecognized language (link)
  3. "Rajnath Singh & Nitin Gadkari laid the foundation stone". The Hans India. Indo-Asian News Service. 7 March 2019. Archived from the original on 7 December 2020. Retrieved 7 March 2019.
  4. Rastogi, Divyansh (22 May 2019). "Lucknow-Kanpur expressway: अगस्त में शुरू होगा निर्माण, 45 से 50 मिनट में पूरा होगा सफर" [Lucknow-Kanpur expressway: construction will start in August, the journey will take 45 to 50 minutes]. Dainik Jagran (in Hindi). Archived from the original on 29 August 2019.{{cite news}}: CS1 maint: unrecognized language (link)
  5. "लखनऊ-कानपुर एक्सप्रेस-वे को मिली हरी झंडी" [Lucknow-Kanpur Expressway gets green light]. Navbharat Times (in Hindi). 6 February 2020. Archived from the original on 7 December 2020.{{cite news}}: CS1 maint: unrecognized language (link)
  6. Gupta, Anurag (14 August 2020). "Kanpur Lucknow Expressway: छह माह में पूरा होगा निर्माण सितंबर 2023 में शुरू होगा वाहनों का दौड़ना" [Kanpur Lucknow Expressway: Construction will be completed in six months, vehicles will start running in September 2023]. Dainik Jagran (in Hindi). Archived from the original on 7 December 2020.{{cite news}}: CS1 maint: unrecognized language (link)
  7. Dash, Dipak K. (13 August 2020). "23 new expressways and highways coming up in next 5 years". The Times of India. Archived from the original on 23 August 2020.
  8. Chopra, Vijay (17 September 2020). "Lucknow to Kanpur trip in 50 minutes via expressway". The Times of India. Archived from the original on 18 September 2020.
  9. Gupta, Rajesh (15 December 2020). "Ministry of Road Transport & Highways Notification" (PDF). The Gazette of India (in Hindi and English). Archived (PDF) from the original on 19 February 2021.{{cite web}}: CS1 maint: unrecognized language (link)
  10. Mishra, Vivek (5 February 2021). "Lucknow-Kanpur Expressway: लखनऊ-कानपुर एक्सप्रेस-वे के लिए जमीन अधिग्रहण पूरा" [Lucknow-Kanpur Expressway: Land Acquisition Completed for Lucknow-Kanpur Expressway]. Navbharat Times (in Hindi). Archived from the original on 5 February 2021.{{cite news}}: CS1 maint: unrecognized language (link)
  11. "Work of New Expressway project worth Rs 4700 crore to begin in October". The Times of India. 18 February 2021. Archived from the original on 17 February 2021.


Information red.svg
Scan the QR code to donate via UPI
Dear reader, We kindly request your support in maintaining the independence of Bharatpedia. As a non-profit organization, we rely heavily on small donations to sustain our operations and provide free access to reliable information to the world. We would greatly appreciate it if you could take a moment to consider donating to our cause, as it would greatly aid us in our mission. Your contribution would demonstrate the importance of reliable and trustworthy knowledge to you and the world. Thank you.

Please select an option below or scan the QR code to donate
₹150 ₹500 ₹1,000 ₹2,000 ₹5,000 ₹10,000 Other