Kalyani Nagar | |||||
|---|---|---|---|---|---|
| Template:Pune Metro Infobox station line | |||||
![]() | |||||
| Location | Kalyani Nagar, Pune, Maharashtra 411006 | ||||
| Coordinates | 18°32′40″N 73°54′21″E / 18.544367°N 73.905732°E | ||||
| Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||
| Operated by | Pune Metro | ||||
| Line(s) | Template:Rcb | ||||
| Platforms | Side platform Platform-1 → Ramwadi Platform-2 → Vanaz | ||||
| Tracks | 2 | ||||
| Construction | |||||
| Structure type | Elevated, Double track | ||||
| Platform levels | 2 | ||||
| Parking | 2 wheeler parking on the South Exit (towards Koregaon Park), 4 wheeler parking at request at the retail store Kalyani Metro Store. | ||||
| Bicycle facilities | Bicycle parking is available. On demand cycles are not available. | ||||
| Other information | |||||
| Station code | KNA | ||||
| History | |||||
| Opened | 6 March 2024 | ||||
| Electrified | Template:25 kV 50 Hz overhead catenary | ||||
| Services | |||||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Pune Metro' not found. | |||||
| |||||
| Location | |||||
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |||||
Kalyani Nagar metro station, is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. It is connected to Rainbow Bus Rapid Transit System. The station was opened on 6 March 2024 as an extension of Pune Metro Phase I.[1] Aqua Line operates between Vanaz and Ramwadi station.[2][3] Change over to the Purple Line, PCMC to Swargate stations (North - South corridor) is available at Civil Court station. In June 2024, Entry/Exit Gate no. 3 was opened for the commuters so that they could climb foot over the bridge without crossing the busy road.[4]
Station layout[edit | edit source]
| style="color:;background:#Template:Rail color;text-align:center;padding:5px"| Bund Garden track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
| ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 1 Eastbound |
Towards → Ramwadi | |
| Platform 2 Westbound |
Towards ← Vanaz Next Station: Yerwada | |
| Side platform | Doors will open on the left | ||
| L3 | ||
See also[edit | edit source]
References[edit | edit source]
- ↑ "PM Modi inaugurates Pune Metro route extension; these three new stations will be operational from today". The Indian Express. 6 March 2024. Retrieved 7 March 2024.
- ↑ "Comfortable, convenient & economic: Citizens on Metro launch till Ramwadi". The Times of India. 7 March 2024. ISSN 0971-8257. Retrieved 7 March 2024.
- ↑ Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times. Retrieved 4 August 2023.
- ↑ "Pune Metro Introduces New Entry/Exit Gates at Five Stations to Enhance Commuter Convenience and Accessibility". Free Press Journal. Retrieved 22 June 2024.
