Kalupur Railway Station | ||
|---|---|---|
| Ahmedabad Metro station | ||
![]() | ||
| Location | Saraspur, Ahmedabad, Gujarat 380002 | |
| Coordinates | 23°01′30″N 72°36′11″E / 23.02512°N 72.60305°E | |
| Owned by | Gujarat Metro Rail Corporation Limited | |
| Operated by | Ahmedabad Metro | |
| Line(s) | Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist. | |
| Platforms | Island platform Platform-1 → Vastral Gam Platform-2 → Thaltej | |
| Tracks | 2 | |
| Construction | ||
| Structure type | Underground, Double track | |
| Platform levels | 2 | |
| Disabled access | Yes | |
| Other information | ||
| Status | Operational | |
| History | ||
| Opening | 30 September 2022 | |
| Electrified | 750 V DC third rail | |
| Services | ||
|
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Ahmedabad Metro' not found. | ||
| Location | ||
<mapframe>: The JSON content is not valid GeoJSON+simplestyle. The list below shows all attempts to interpret it according to the JSON Schema. Not all are errors.
| ||
Kalupur Railway Station is an underground metro station on the East-West Corridor of the Blue Line of Ahmedabad Metro in Ahmedabad, India. It was opened to the public on 30 September 2022.[1][2][3][4]
Station Layout[edit | edit source]
Kalupur Railway Station track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform
** Skipping Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. metro station | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/ Entrance |
| M | Mezzanine | Fare control, station agent, Ticket/token, shops |
| P | <span style=color:#Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.>Platform 1 Eastbound |
Towards → Vastral Gam next station is Apparel Park |
| Island platform | Doors will open on the right | ||
| <span style=color:#Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.>Platform 2 Westbound |
Towards ← Thaltej next station is Gheekanta | |
Entry/Exit[edit | edit source]
This section is empty. You can help by adding to it. (August 2023) |
See also[edit | edit source]
References[edit | edit source]
- ↑ "PM Modi inaugurates Ahmedabad Metro first phase, takes a ride". Economic Times India Times. Retrieved 3 January 2022.
- ↑ www.ETRealty.com. "Prime minister inaugurates phase-1 of Ahmedabad Metro rail project - ET RealEstate". ETRealty.com. Retrieved 4 October 2022.
- ↑ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
- ↑ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.
External links[edit | edit source]
- REDIRECT Template:Ahmedabad Metro
|
