Gudur–Katpadi section

From Bharatpedia, an open encyclopedia

Gudur–Katpadi branch line
Track Diversion.jpg
Track diversion towards Gudur Junction at Renigunta Junction
Overview
StatusOperational
OwnerIndian Railways
LocaleAndhra Pradesh, Tamil Nadu
TerminiGudur Junction
Katpadi Junction
Service
Operator(s)South Central Railway zone
Technical
Line length198 km (123 mi)
Number of tracks2/1
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrificationyes

Template:Gudur–Chennai section

Gudur–Katpadi branch line connects Gudur of Andhra Pradesh town with Katpadi of Tamil Nadu City. This entire line is under the jurisdiction of Guntakal railway division. It is an electrified railway section[1]

Importance[edit]

This branch line further connects Mumbai–Chennai line at Renigunta Junction and Chennai Central–Bangalore City line at Katpadi Junction. This line also connects Dharmavarm–Pakala branch line at Pakala Junction. This line passes through pilgrim towns of Srikalahasti, Tirupati and also passes through the District Headquarters, Chittoor of Andhra Pradesh State. This line is double line up to Tirupati and single line thereafter up to Katpadi Junction.

References[edit]

  1. "Electrification". scrailways.blogspot.in. Retrieved 14 May 2017.