| Overview | |
|---|---|
| Service type | Passenger |
| Current operator(s) | Central Railway |
| Route | |
| Start | Amla Junction (AMLA) |
| Stops | 2 |
| End | Betul (BZU) |
| Distance travelled | 23 km (14 mi) |
| Average journey time | 35m |
| Service frequency | Daily [lower-alpha 1] |
| Train number(s) | 51239/51240 |
| On-board services | |
| Class(es) | Unreserved |
| Seating arrangements | Yes |
| Sleeping arrangements | No |
| Catering facilities | No |
| Observation facilities | ICF Coaches |
| Entertainment facilities | No |
| Baggage facilities | Below the seats |
| Technical | |
| Rolling stock | 2 |
| Track gauge | 5 ft 6 in (1,676 mm) |
| Electrification | No |
| Operating speed | 40 km/h (25 mph) average with halts |
The Amla - Betul Passenger is a passenger train belonging to Central Railway zone that runs between Amla Junction and Betul. It is currently being operated with 51239/51240 train numbers on a daily basis.[1][2][3]
Average speed and frequency[edit | edit source]
The 51239/Amla - Betul Passenger runs with an average speed of 40 km/h and completes 23 km in 35m. The 51240/Betul - Amla Passenger runs with an average speed of 35 km/h and completes 23 km in 40m.
Route and halts[edit | edit source]
The important halts of the train are:
Coach composite[edit | edit source]
The train has standard ICF rakes with max speed of 110 kmph. The train consists of 9 coaches:
- 7 General Unreserved
- 2 Seating cum Luggage Rake
Traction[edit | edit source]
Both trains are hauled by an Itarsi Loco Shed based WDM 3A or WDP-4 diesel locomotive from Amla to Betul and vice versa.
Rake Sharing[edit | edit source]
The train shares its rake with 51253/51254 Amla - Chhindwara Passenger and 51293/51294 Nagpur - Amla Passenger.
See also[edit | edit source]
- Amla Junction railway station
- Chhindwara Junction railway station
- Amla - Chhindwara Passenger
- Nagpur - Amla Passenger
Notes[edit | edit source]
- ↑ Runs seven days in a week for every direction.
References[edit | edit source]
- ↑ "Two projects for Nagpur figure in Railway Budget". Archived from the original on 11 February 2018. Retrieved 24 August 2017.
- ↑ 17 trains late in Nagpur division due to derailment of goods train in Madhya Pradesh
- ↑ Narrow gauge section closes from Oct 1 in Satputda valley
External links[edit | edit source]