Created by The Banner
Last edited July 9, 2020
Talk
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Sewa-II is a hydroelectric power station located in the Himalayan region in Jammu and Kashmir state. It is constructed by NHPC Limited on the Sewa River, a tributary of the Ravi River. Commissioned in 2010, it has a surface power house with the capacity of 120 MW, comprising three Pelton wheel units of 40 MW each, which are fed through a 10km headrace tunnel from the Sewa II Reservoir, giving a maximum water head of 599m. The Sewa II Dam has a height of 53m. The power station generates 534 GW⋅h annually in a 90% dependable year. The beneficiary states of the project include Jammu & Kashmir, Punjab, Haryana, Uttar Pradesh, Uttarakhand, Delhi, Rajasthan and Union Territory of Chandigarh.[1]

References

  1. ↑ "Sewa II Hydroelectric Power Project India". Global Energy Observatory. Retrieved 9 April 2018.

External links

32°40′34″N 75°49′17″E / 32.6762°N 75.8215°E / 32.6762; 75.8215