Last edited July 22, 2025
Talk
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Kalyani Nagar
<div style="width:100%; height:6.25px; float:left; background:#Lua error: expandTemplate: template "Pune Metro color" does not exist.">
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Pune Metro' not found. station
Kalyani Nagar metro photo taken from the North side
LocationKalyani Nagar, Pune, Maharashtra 411006
Coordinates18°32′40″N 73°54′21″E / 18.544367°N 73.905732°E / 18.544367; 73.905732
Owned byMaharashtra Metro Rail Corporation Limited (MAHA-METRO)
Operated byPune Metro
Line(s)Lua error: expandTemplate: template "Pune Metro color" does not exist.
PlatformsSide platform
Platform-1 → Ramwadi
Platform-2 → Vanaz
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking2 wheeler parking on the South Exit (towards Koregaon Park), 4 wheeler parking at request at the retail store Kalyani Metro Store.
Bicycle facilitiesBicycle parking is available. On demand cycles are not available.
Other information
Station codeKNA
History
Opened6 March 2024; 2 years ago (2024-03-06)
ElectrifiedTemplate:25 kV 50 Hz overhead catenary
Services
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Pune Metro' not found.
Location
<mapframe>: The JSON content is not valid GeoJSON+simplestyle. The list below shows all attempts to interpret it according to the JSON Schema. Not all are errors.
  • /0/query: The property query is required
  • /0/ids: The property ids is required
  • /0: Failed to match at least one schema
  • /0/title: The property title is required
  • /0/service: The property service is required
  • /0: Failed to match exactly one schema
  • /0/type: Does not have a value in the enumeration ["ExternalData"]
  • /0/properties/marker-color: Does not match the regex pattern ^#?([0-9a-fA-F]{3}){1,2}$
  • /0/geometries: The property geometries is required
  • /0/type: Does not have a value in the enumeration ["GeometryCollection"]
  • /0/type: Does not have a value in the enumeration ["MultiPolygon"]
  • /0/type: Does not have a value in the enumeration ["Point"]
  • /0/type: Does not have a value in the enumeration ["MultiPoint"]
  • /0/type: Does not have a value in the enumeration ["LineString"]
  • /0/type: Does not have a value in the enumeration ["MultiLineString"]
  • /0/type: Does not have a value in the enumeration ["Polygon"]
  • /0/coordinates: The property coordinates is required
  • /0/features: The property features is required
  • /0/type: Does not have a value in the enumeration ["FeatureCollection"]

Kalyani Nagar metro station, is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. It is connected to Rainbow Bus Rapid Transit System. The station was opened on 6 March 2024 as an extension of Pune Metro Phase I.[1] Aqua Line operates between Vanaz and Ramwadi station.[2][3] Change over to the Purple Line, PCMC to Swargate stations (North - South corridor) is available at Civil Court station. In June 2024, Entry/Exit Gate no. 3 was opened for the commuters so that they could climb foot over the bridge without crossing the busy road.[4]

Station layout

Bund Garden track layout
to Lua error: expandTemplate: template "Pune Metro stations" does not exist.
P2
P1
to Lua error: expandTemplate: template "Pune Metro stations" does not exist.
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
<span style=color:#Lua error: expandTemplate: template "Pune Metro color" does not exist.>Platform 1
Eastbound
Towards → Ramwadi
<span style=color:#Lua error: expandTemplate: template "Pune Metro color" does not exist.>Platform 2
Westbound
Towards ← Vanaz
Next Station: Yerwada
Side platform | Doors will open on the left Disabled access
L3

See also

References

  1. ↑ "PM Modi inaugurates Pune Metro route extension; these three new stations will be operational from today". The Indian Express. 6 March 2024. Retrieved 7 March 2024.
  2. ↑ "Comfortable, convenient & economic: Citizens on Metro launch till Ramwadi". The Times of India. 7 March 2024. ISSN 0971-8257. Retrieved 7 March 2024.
  3. ↑ Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times. Retrieved 4 August 2023.
  4. ↑ "Pune Metro Introduces New Entry/Exit Gates at Five Stations to Enhance Commuter Convenience and Accessibility". Free Press Journal. Retrieved 22 June 2024.

External links