Barauni Thermal Power Station
Map
CountryIndia
LocationBihar
Coordinates25°27′58″N 85°59′13″E / 25.466°N 85.987°E / 25.466; 85.987
StatusOperational
Commission date1962
Operator(s)NTPC
Thermal power station
Primary fuelCoal
Power generation
Lua error in Module:Infobox_power_station at line 110: attempt to index field 'wikibase' (a nil value).
Nameplate capacity470 MW ,(Upcoming) 250 MW

Barauni Thermal Power Station is an existing 470 megawatt coal-fired power station earlier owned by Bihar State Electricity Board (BSEB).[1] The power station is located at Barauni in Begusarai district, Bihar, India.[2] Barauni thermal power station in Bihar came into existence in association with the Russian collaboration and came into operation in the year 1962.[3] Bihar Government was mulling over the idea to hand over Barauni Thermal Power Station to NTPC Limited.[4][5] On 17 April 2018, Bihar state cabinet , headed by chief minister Nitish Kumar, gave its nod to handing over of Barauni Thermal Power Station to National Thermal Power Corporation.[6] On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to National Thermal Power Corporation for a 33- years lease.[7][8][9] East Central Railway will provide uninterrupted supply of coal to thermal power station.[10] NTPC completed the acquisition of 720 MW Barauni thermal power plant with effect from 15 December 2018.[11][12] The units of Barauni power station will be progressively put under commercial operation.

History

Unit No. 1, 2 & 3 of 15MW units at the plant, which were commissioned in the early to mid-1960s have been decommissioned.[13] Barauni Thermal power station was set up in 86.85 acres, ash yard was set up in 340 acres and Residential colony was set up in 139.25 acres.

Unit No. 4 & 5 of 50 MW each, which are Polish made, were shut down in 1995 and 1996 "due to pollution problem."[14] BSEB states that it proposed recommissioning the units but the Central Electricity Authority "declared revival/R&M of these units not Techno-economically viable." Thus these units stand retired.

Unit No. 6 which was supplied by BHEL was renovated & modernized.

Unit No. 7 which too was supplied by Bharat Heavy Electricals was also renovated.[15] Commercial generation of 110 MW electricity started from Unit 7 on 4 November 2016. The unit started generation after NTPC takeover from 23.05.2019. The tariff of Barauni Thermal power station will be determined by CERC.[16][17]

Commercial generation of 250 MW electricity started from Unit 8 in January 2018.[18] Unit 9 is in advanced stages of construction as of January 2018.

Capacity

Unit# Installed Capacity (MW) Date of Commissioning Status
1 15 1977 May Retired
2 15 1978 August Retired
3 15 2012 February Retired
4 50 2013 October Retired
5 50 2013 October Retired
6 110 2016 November Operational
7 110 2018 Operational
8 250 2018 January Operational[18]
9 250 Under Construction

See also

References

  1. ↑ "Kanit, Barauni power plants to be ready by December". Business Standard. 31 March 2013. Retrieved 5 November 2013.
  2. ↑ "Bihar to get 5k MW by 2015". Times of India. Retrieved 11 August 2017.
  3. ↑ "Centre moots Barauni refinery expansion". Times of India. Retrieved 11 August 2017.
  4. ↑ "Power plant transfer".
  5. ↑ "बरौनी थर्मल पावर स्टेशन को भी एनटीपीसी के हाथों सौंपने की तैयारी".
  6. ↑ "Patna to hand over 3 power plants to NTPC".
  7. ↑ "State happy with power deal".
  8. ↑ "Bihar transfers 3 power plants to NTPC on lease for 30 years".
  9. ↑ "NTPC signs MoU with Government of Bihar; aims to improve performance of Power Sector in Bihar".
  10. ↑ "Railways assures NTPC of uninterrupted coal supply".
  11. ↑ "NTPC acquires 720 Mw (2x110+2x250) Barauni thermal power plant in Bihar".
  12. ↑ "Uniform Pricing of Power Ruled Out, Says Power Minister RK Singh".
  13. ↑ "Power Generation". bsphcl.bih.nic.in. Archived from the original on 15 October 2013. Retrieved 11 August 2017.
  14. ↑ Pratim Ranjan Bose. "Barauni Thermal Power expansion hits funding hurdle | Business Line". Thehindubusinessline.com. Retrieved 5 November 2013.
  15. ↑ "Kanit, Barauni power plants to be ready by December". Business Standard News. Retrieved 11 August 2017.
  16. ↑ "State's power generation up to 330MW now". Times of India. Retrieved 11 August 2017.
  17. ↑ "The seventh unit of barauni begain [sic] production of thermal power, Bihar Patna Hindi News". Hindustan. Retrieved 11 August 2017.
  18. ↑ 18.0 18.1 "BHEL Commissions 250 MW Thermal Power Unit In Bihar". Moneycontrol. 12 January 2018. Retrieved 27 March 2021.