Created by Jeet Dev
Last edited October 4, 2025
Talk
UpdateBot (talk | contribs)
robot: Update article (please report if you notice any mistake or error in this edit)
m expanded content
 
Line 1: Line 1:
{{short description|Railway Station in West Bengal}}
{{short description|Railway Station in West Bengal}}
{{Use dmy dates|date=February 2023}}
{{Use Indian English|date=February 2023}}
{{Infobox station
{{Infobox station
| name = [[File:Indian_Railways_Suburban_Railway_Logo.svg|50px]]<br>{{font color|blue|Balgona}}
| name         = Balgona
| type = [[Indian Railways]] station and <br> [[Kolkata Suburban Railway]] station
| symbol        = s
| style = Kolkata Suburban Railway
| symbol_location = kolkata
| image =  
| system        = [[Kolkata Suburban Railway]]
| style         = Kolkata Suburban Railway
| image         =  
| image_caption =  
| image_caption =  
| address = Nityanandapur, [[Balgona]], [[Purba Bardhaman district]], [[West Bengal]]
| address       = Nityanandapur, [[Balgona]], [[Purba Bardhaman district]], [[West Bengal]]
| country = India
| country       = India
| coordinates = {{coord|23.457991|87.950423|type:railwaystation_region:IN|display=inline,title}}
| coordinates   = {{coord|23.457991|87.950423|type:railwaystation_region:IN|display=inline,title}}
| line = [[Bardhaman–Katwa line]]
| line         = [[Bardhaman–Katwa line]]
| other =  
| other         =  
| elevation = {{cvt|30|m}}
| elevation     = {{cvt|30|m}}
| structure = Standard (on-ground station)
| structure     = Standard (on-ground station)
| platform = 2
| platform     = 2
| depth =  
| depth         =  
| levels =  
| levels       =  
| tracks = 1
| tracks       = 1
| parking =  
| parking       =  
| bicycle =  
| bicycle       =  
| opened = 1915
| opened       = 1915
| closed = 2010
| closed       = 2010
| rebuilt = 2014–2018
| rebuilt       = 2014–2018
| electrified = 25 kV AC overhead
| electrified   = 25 kV AC overhead
| ADA =  
| accessible          =  
| code = {{Indian railway code
| code         = {{Indian railway code
   | code = BGNA
   | code = BGNA
   | zone = [[Eastern Railway zone|Eastern Railway]]
   | zone = [[Eastern Railway zone|Eastern Railway]]
   | division = {{rwd|Howrah}}
   | division = {{rwd|Howrah}}
   }}
   }}
| owned = [[Indian Railways]]
| owned         = [[Indian Railways]]
| operator = [[Eastern Railway zone|Eastern Railway]]
| operator     = [[Eastern Railway zone|Eastern Railway]]
| status = Functioning
| status       = Functioning
| former = [[McLeod's Light Railways]]
| former       = [[McLeod's Light Railways]]
| passengers =  
| passengers   =  
| pass_year =  
| pass_year     =  
| pass_percent =  
| pass_percent =  
| pass_system =  
| pass_system   =  
| mpassengers =  
| mpassengers   =  
| map_type      = India West Bengal#India
| map_type      = India West Bengal#India
| map_caption  = Location in [[West Bengal]]##Location in India
| map_dot_label = Balgona
| map_dot_label = Balgona
| map_size      = 300
| map_size      = 300
| services = {{s-rail|title=Kolkata Suburban Railway}}
| map_caption  = Location in [[West Bengal]]##Location in India
{{s-line|system=Kolkata Suburban Railway|previous= Bhatar|next= Saota|line=Eastern |branch= [[Bardhaman–Katwa line]]|rows1=1|type=Howrah Junction|type2= Katwa Junction}}
| services     = {{Adjacent stations|system=Kolkata Suburban Railway|line=Eastern|left=Bhatar|right=Saota|to-left=Howrah Junction|to-right=Katwa Junction|type=[[Bardhaman–Katwa line]]}}
| map_locator =  
| map_locator   =  
|route_map = {{Bardhaman–Katwa line}}
| route_map     = {{Bardhaman–Katwa line}}
|map_state = collapsed
| map_state     = collapsed
}}
}}


Line 52: Line 55:


==History==
==History==
On 1 December 1915, [[McLeod's Light Railways]] set up narrow-gauge lines in the Burdwan-Katwa Railway route. This railway section was  handed over to the Eastern Railway in 1966. In 2010 the work started for conversion of 5&nbsp;ft 6 in (1,676&nbsp;mm) broad gauge.<ref>{{Cite web|url=https://www.thehindubusinessline.com/economy/logistics/It%E2%80%99s-journey%E2%80%99s-end-for-these-slow-coaches-with-a-long-history/article20920608.ece|title=It's journey's end for these slow coaches with a long history|last=Law|first=Abhishek|website=@businessline|access-date=2019-10-11}}</ref><ref>{{Cite web|url=https://timesofindia.indiatimes.com/city/kolkata/Villagers-stall-rail-project-in-Burdwan/articleshow/6021611.cms|title=Villagers stall rail project in Burdwan |date=June 8, 2010|website=The Times of India|access-date=2019-10-11}}</ref> Bardhaman to Balogna railway station was reopened in 2014 and Balgona to Katwa section was completed on 12 January 2018 for the public.<ref>{{Cite web|url=https://www.anandabazar.com/district/bardhaman/katwa-burdwan-broad-gauge-trains-started-at-last-1.739229|title='বড় রেল' কাটোয়ায়, জমল ভিড়|website=anandabazar.com|language=bn-IN|access-date=2019-10-11}}</ref>
On 1 December 1915, [[McLeod's Light Railways]] set up narrow-gauge lines in the Burdwan-Katwa Railway route. This railway section was  handed over to the Eastern Railway in 1966. In 2010 the work started for conversion of 5&nbsp;ft 6 in (1,676&nbsp;mm) broad gauge.<ref>{{Cite news|url=https://www.thehindubusinessline.com/economy/logistics/It%E2%80%99s-journey%E2%80%99s-end-for-these-slow-coaches-with-a-long-history/article20920608.ece|title=It's journey's end for these slow coaches with a long history|last=Law|first=Abhishek|newspaper=The Hindu Business Line|date=27 November 2014|access-date=2023-02-08}}</ref><ref>{{Cite web|url=https://timesofindia.indiatimes.com/city/kolkata/Villagers-stall-rail-project-in-Burdwan/articleshow/6021611.cms|title=Villagers stall rail project in Burdwan |date=8 June 2010|website=The Times of India|access-date=2019-10-11}}</ref> Bardhaman to Balogna railway station was reopened in 2014 and Balgona to Katwa section was completed on 12 January 2018 for the public.<ref>{{Cite web|url=https://www.anandabazar.com/district/bardhaman/katwa-burdwan-broad-gauge-trains-started-at-last-1.739229|title='বড় রেল' কাটোয়ায়, জমল ভিড়|website=anandabazar.com|language=bn-IN|access-date=2019-10-11}}</ref>


==References==
==References==
Line 59: Line 62:
{{Kolkata Suburban Railway, Eastern}}
{{Kolkata Suburban Railway, Eastern}}


[[Category:Railway stations in India opened in 1915]]
[[Category:Railway stations in Purba Bardhaman district]]
[[Category:Railway stations in Purba Bardhaman district]]
[[Category:Howrah railway division]]
[[Category:Howrah railway division]]
[[Category:1915 establishments in India]]
[[Category:Kolkata Suburban Railway stations]]
[[Category:Kolkata Suburban Railway stations]]
[[Category:Railway stations in India closed in 2010]]


 
{{PurbaBardhaman-railstation-stub}}
{{WestBengal-railstation-stub}}

Latest revision as of 19:57, 4 October 2025

Balgona
Script error: No such module "Rail-interchange multi".
LocationNityanandapur, Balgona, Purba Bardhaman district, West Bengal
India
Coordinates23°27′29″N 87°57′02″E / 23.457991°N 87.950423°E / 23.457991; 87.950423
Elevation30 m (98 ft)
Owned byIndian Railways
Operated byEastern Railway
Line(s)Bardhaman–Katwa line
Platforms2
Tracks1
Construction
Structure typeStandard (on-ground station)
Other information
StatusFunctioning
Station codeBGNA
Zone(s) Eastern Railway
Division(s) Howrah
History
Opened1915
Closed2010
Rebuilt2014–2018
Electrified25 kV AC overhead
Previous namesMcLeod's Light Railways
Services
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Kolkata Suburban Railway' not found.
Location
Location in West Bengal
Balgona is located in India
Balgona
Balgona
Location in India

Balgona railway station is a railway station in Bardhaman–Katwa line under Howrah railway division of Eastern Railway zone. It is situated at Nityanandapur, Balgona of Purba Bardhaman district in the Indian state of West Bengal.[2][3]

History[edit | edit source]

On 1 December 1915, McLeod's Light Railways set up narrow-gauge lines in the Burdwan-Katwa Railway route. This railway section was handed over to the Eastern Railway in 1966. In 2010 the work started for conversion of 5 ft 6 in (1,676 mm) broad gauge.[4][5] Bardhaman to Balogna railway station was reopened in 2014 and Balgona to Katwa section was completed on 12 January 2018 for the public.[6]

References[edit | edit source]

  1. ↑ "Howrah Division System Map". ER Railway.
  2. ↑ "Balgona Railway Station Map/Atlas ER/Eastern Zone – Railway Enquiry". India Rail Info. Retrieved 11 October 2019.
  3. ↑ "Balgona Railway Station (BGNA) : Station Code, Time Table, Map, Enquiry". NDTV. Retrieved 11 October 2019.
  4. ↑ Law, Abhishek (27 November 2014). "It's journey's end for these slow coaches with a long history". The Hindu Business Line. Retrieved 8 February 2023.
  5. ↑ "Villagers stall rail project in Burdwan". The Times of India. 8 June 2010. Retrieved 11 October 2019.
  6. ↑ "'বড় রেল' কাটোয়ায়, জমল ভিড়". anandabazar.com (in Bengali). Retrieved 11 October 2019.

Template:PurbaBardhaman-railstation-stub