East West Gas Pipeline (India): Difference between revisions

Created by Verbcatcher
Last edited February 26, 2026
m Removed empty portal template using script
quick refined information and fixed typos to improve readability
 
Line 1: Line 1:
{{Short description|Natural gas pipeline project}}
{{Use dmy dates|date=June 2019}}
{{Use dmy dates|date=June 2019}}
{{Use Indian English|date=June 2019}}
{{Use Indian English|date=June 2019}}
Line 23: Line 24:
| operator                  =  
| operator                  =  
| technical_service_provider =  
| technical_service_provider =  
| contractors                = [[China Petroleum Pipeline Bureau]], [[Punj Lloyd]], [[Stroytransgaz]]<ref name="cpc">{{cite news|title=China National Wins Reliance Gas Pipeline Contract in India|url=https://www.bloomberg.com/news/articles/2014-07-08/china-national-wins-reliance-gas-pipeline-contract-in-india|agency=Bloomberg|date=8 July 2014}}</ref><ref>{{Cite web |url=http://www.stroytransgaz.com/projects/india/east-west_gas_pipeline |title=East-West gas pipeline - Stroytransgaz<!-- Bot generated title --> |access-date=10 November 2013 |archive-url=https://archive.is/20131110081327/http://www.stroytransgaz.com/projects/india/east-west_gas_pipeline |archive-date=10 November 2013 |url-status=dead }}</ref>
| contractors                = [[China Petroleum Pipeline Bureau]], [[Punj Lloyd]], [[Stroytransgaz]]<ref name="cpc">{{cite news|title=China National Wins Reliance Gas Pipeline Contract in India|url=https://www.bloomberg.com/news/articles/2014-07-08/china-national-wins-reliance-gas-pipeline-contract-in-india|agency=Bloomberg|date=8 July 2014}}</ref><ref>{{Cite web |url=http://www.stroytransgaz.com/projects/india/east-west_gas_pipeline |title=East-West gas pipeline - Stroytransgaz<!-- Bot generated title --> |access-date=10 November 2013 |archive-url=https://archive.today/20131110081327/http://www.stroytransgaz.com/projects/india/east-west_gas_pipeline |archive-date=10 November 2013 |url-status=dead }}</ref>
| construction              = 2006
| construction              = 2006
| est                        = 2008<ref>{{Cite web |url=http://www.gie.com/experence/benchmark-projects/east-west-gas-pipeline-project |title=Gulf - East-West Gas Pipeline Project<!-- Bot generated title --> |access-date=10 November 2013 |archive-url=https://web.archive.org/web/20160304003604/http://www.gie.com/experence/benchmark-projects/east-west-gas-pipeline-project |archive-date=4 March 2016 |url-status=dead }}</ref>
| est                        = 2008<ref>{{Cite web |url=http://www.gie.com/experence/benchmark-projects/east-west-gas-pipeline-project |title=Gulf - East-West Gas Pipeline Project<!-- Bot generated title --> |access-date=10 November 2013 |archive-url=https://web.archive.org/web/20160304003604/http://www.gie.com/experence/benchmark-projects/east-west-gas-pipeline-project |archive-date=4 March 2016 |url-status=dead }}</ref>
Line 46: Line 47:


==System configuration==
==System configuration==
EWPL is a {{convert|48|inch|cm}} uniform diameter (API 5L Grade X-70) pipeline across the entire trunk length of around 1375 km with wall thicknesses 17.2, 20.7 and 25.4 mm depending on the code requirement. The pipeline is 3LPE (three layer polyethylene) coated; internally epoxy lined, helically spiral [[submerged arc welding|submerged arc welded]] (for 17.2 mm) and longitudinal submerged arc welded (for 20.7 mm and 25.4 mm). [[Cathodic protection#Impressed current systems|Impressed current cathodic protection]] system has been provided to supplement the coating system for protection against external [[corrosion]]. Maximum Allowable Operating Pressure (MAOP) of the pipeline is 98.0 bar(g).<ref>[http://pipelinesinternational.com/news/crossing_indias_narmada_river_using_hdd/055362/ Crossing India’s Narmada River using HDD — Pipelines International — The international pipeline magazine<!-- Bot generated title -->]</ref>
EWPL is a {{convert|48|inch|cm}} uniform diameter (API 5L Grade X-70) pipeline across the entire trunk length of around 1375 km with wall thicknesses 17.2, 20.7 and 25.4 mm depending on the code requirement. The pipeline is 3LPE (three layer polyethylene) coated; internally epoxy lined, helically spiral [[submerged arc welding|submerged arc welded]] (for 17.2 mm) and longitudinal submerged arc welded (for 20.7 mm and 25.4 mm). [[Cathodic protection#Impressed current cathodic protection (ICCP)|Impressed current cathodic protection]] system has been provided to supplement the coating system for protection against external [[corrosion]]. Maximum Allowable Operating Pressure (MAOP) of the pipeline is 98.0 bar(g).<ref>[http://pipelinesinternational.com/news/crossing_indias_narmada_river_using_hdd/055362/ Crossing India’s Narmada River using HDD — Pipelines International — The international pipeline magazine<!-- Bot generated title -->]</ref>


==Gas price==
==Gas price==
In 2020, Indian government fixed the natural gas price at producer end (on shore point) as US{{convert|4.06|$/MMBtu|$/MWh|2|lk=on}} on [[Heat of combustion|net calorific value]] (NCV) basis from KG-D6 field.<ref>{{cite web|title= Reliance, BP to get govt capped price of USD 4.06 for new gas from KG-D6|url=https://energy.economictimes.indiatimes.com/news/oil-and-gas/reliance-bp-to-get-govt-capped-price-of-usd-4-06-for-new-gas-from-kg-d6/79825230|access-date=20 December 2020}}</ref> However the enhanced price would be applicable only after compensating the shortfall gas in the previous years. The earlier price of $4.2  per million BTU on gross calorific value (GCV) basis is calculated already at maximum price cap of Brent crude of $60 per barrel (159 liters) under the applicable formula linking the price of gas per million BTU (GP) to the price of oil:
In 2020, Indian government fixed the natural gas price at producer end (on shore point) as US{{convert|4.06|$/MMBtu|$/MWh|2|lk=on}} on [[Heat of combustion|net calorific value]] (NCV) basis from KG-D6 field.<ref>{{cite web|title= Reliance, BP to get govt capped price of USD 4.06 for new gas from KG-D6|url=https://energy.economictimes.indiatimes.com/news/oil-and-gas/reliance-bp-to-get-govt-capped-price-of-usd-4-06-for-new-gas-from-kg-d6/79825230|access-date=20 December 2020}}</ref> However the enhanced price would be applicable only after compensating the shortfall gas in the previous years. The earlier price of $4.2  per million BTU on gross [[calorific value]] (GCV) basis is calculated already at maximum price cap of Brent crude of $60 per barrel (159 liters) under the applicable formula linking the price of gas per million BTU (GP) to the [[price of oil]]:


GP = 2.5 + (OP – 25) ^0.15
GP = 2.5 + (OP – 25) ^0.15
Line 71: Line 72:
* [https://web.archive.org/web/20131110090905/http://www.rgtil.com/index.html?2 Company website]
* [https://web.archive.org/web/20131110090905/http://www.rgtil.com/index.html?2 Company website]


 
{{Portal|India|Energy|Engineering}}


[[Category:Reliance Industries]]
[[Category:Reliance Industries]]
Line 78: Line 79:
[[Category:Energy in Gujarat]]
[[Category:Energy in Gujarat]]
[[Category:Energy in Telangana]]
[[Category:Energy in Telangana]]
[[Category:Brookfield Asset Management]]
[[Category:Brookfield Corporation]]
[[Category:2008 establishments in India]]
[[Category:2008 establishments in India]]
[[Category:Infrastructure completed in 2008]]
[[Category:Infrastructure completed in 2008]]

Latest revision as of 02:33, 26 February 2026


East West Gas Pipeline
Location
CountryIndia
StateAndhra Pradesh, Gujarat
General directionEast to West
FromKakinada, Andhra Pradesh
Passes throughTelangana, Karnataka & Maharashtra
ToBharuch, Gujarat
Runs alongside18 National Highways, 66 State Highways, 708 roads, 17 railway lines, and 372 rivers & canals.
General information
TypeGas Pipeline
OwnerIndia Infrastructure Trust[1]
ContractorsChina Petroleum Pipeline Bureau, Punj Lloyd, Stroytransgaz[2][3]
Construction started2006
Commissioned2008[4]
Technical information
Length1,386 km (861 mi)
Diameter1,219.2 mm (48 in)
No. of compressor stations11

Pipeline Infrastructure Limited[5] or East West Gas Pipeline (EWPL) is a project implemented to transport gas from Kakinada (Andhra Pradesh) to Bharuch (Gujarat) including various spurs and interconnects on the way. EWPL traverses through the Indian states of Andhra Pradesh, Telangana, Karnataka, Maharashtra and Gujarat. EWPL has been authorized as a common carrier pipeline.[6] It is a wholly owned subsidiary of India Infrastructure Trust, which is owned by Brookfield Asset Management.[7]
The East West Gas Pipeline supplies Natural gas to RIL's vast petrochemical complex at Gujarat and delivers gas to numerous customers via branch line connections along its length. The pipeline system features multiple compressor stations, numerous metering facilities at branch take-offs and an advanced control and communications network. The project is the first and largest privately owned cross-country pipeline in India and the backbone of India's burgeoning natural gas grid.

Gas source[edit | edit source]

The current gas source for EWPL is KG-D6 gas block located in Krishna Godavari Basin, 30 to 50 km offshore of the east coast of India. RIL has set up an Onshore Terminal at Gadimoga near Kakinada.

System configuration[edit | edit source]

EWPL is a 48 inches (120 cm) uniform diameter (API 5L Grade X-70) pipeline across the entire trunk length of around 1375 km with wall thicknesses 17.2, 20.7 and 25.4 mm depending on the code requirement. The pipeline is 3LPE (three layer polyethylene) coated; internally epoxy lined, helically spiral submerged arc welded (for 17.2 mm) and longitudinal submerged arc welded (for 20.7 mm and 25.4 mm). Impressed current cathodic protection system has been provided to supplement the coating system for protection against external corrosion. Maximum Allowable Operating Pressure (MAOP) of the pipeline is 98.0 bar(g).[8]

Gas price[edit | edit source]

In 2020, Indian government fixed the natural gas price at producer end (on shore point) as US$4.06 per million British thermal units ($13.85/MWh) on net calorific value (NCV) basis from KG-D6 field.[9] However the enhanced price would be applicable only after compensating the shortfall gas in the previous years. The earlier price of $4.2 per million BTU on gross calorific value (GCV) basis is calculated already at maximum price cap of Brent crude of $60 per barrel (159 liters) under the applicable formula linking the price of gas per million BTU (GP) to the price of oil:

GP = 2.5 + (OP – 25) ^0.15

where OP is the annual average Brent crude price for the previous FY, with a cap of $60 per barrel and a floor of $25 per barrel.[10] As the annual Brent price has always been above $60 from 2007 to 2014, the revised gas price at $5.61 during the year 2014 is in excess of the applicable maximum price by nearly 20%.

Controversies[edit | edit source]

Money laundering[edit | edit source]

EWPL is under investigation by the Indian regulators over potential laundering of $1.2 bn by the company.[11]

See also[edit | edit source]

References[edit | edit source]

  1. "Brookfield to acquire Mukesh Ambani's gas pipeline company for Rs 13,000 crore". Retrieved 5 June 2019.
  2. "China National Wins Reliance Gas Pipeline Contract in India". Bloomberg. 8 July 2014.
  3. "East-West gas pipeline - Stroytransgaz". Retrieved 10 November 2013.{{cite web}}: CS1 maint: deprecated archival service (link)
  4. "Gulf - East-West Gas Pipeline Project". Archived from the original on 4 March 2016. Retrieved 10 November 2013.
  5. "About PIL | PIL - Pipeline Infrastructure Limited". pipelineinfra.com. Retrieved 24 February 2021.
  6. "::Welcome To RGTIL website::". Archived from the original on 10 November 2013. Retrieved 10 November 2013.
  7. Pathak, Kalpana (14 March 2019). "Brookfield to acquire RIL's East-West Pipeline for ₹13,000 crore". mint. Retrieved 24 February 2021.
  8. Crossing India’s Narmada River using HDD — Pipelines International — The international pipeline magazine
  9. "Reliance, BP to get govt capped price of USD 4.06 for new gas from KG-D6". Retrieved 20 December 2020.
  10. Anne-Sophie Corbeau. "Natural Gas in India" (PDF). International Energy Agency. p. 27. Retrieved 25 October 2014.
  11. "PNGRB scanning EWPL records after reports of laundering of $1.2 billion". The Financial Express. 11 April 2019. Retrieved 10 March 2021.

External links[edit | edit source]