Last edited December 14, 2025
Talk
m robot: Create/update articles. If there is a mistake please report on my talk page.
m added info
 
Line 1: Line 1:
{{Use Indian English|date=February 2017}}
{{Use Indian English|date=February 2017}}
{{Use dmy dates|date=July 2022}}
{{Use dmy dates|date=July 2022}}
{|{{Infobox ship begin
{{Infobox ship
| sclass = 2
| sclass = 2
|section1={{Infobox ship/image
| image = Thane Creek and Elephanta Island 03-2016 - img08 Ships on Thane Creek.jpg
| image_caption = Coast Guard Interceptor boat C-154
}}
|section2={{Infobox ship/class overview
| name = Bharati-class interceptor craft
| builders = [[Bharati Shipyard]]
| operators = [[Indian Coast Guard]]
| class_before = [[AMPL-class interceptor boat]]
| class_after =
| subclasses =
| cost =
| built_range = 2009–present
| in_service_range =
| in_commission_range = 2013–present
| total_ships_building = 8
| total_ships_planned = 15
| total_ships_completed = 7
| total_ships_canceled =
| total_ships_active = 6<ref>{{Cite news|url=http://wap.business-standard.com/article/news-cm/bharati-defence-and-infrastructure-delivers-vessel-to-indian-coast-guard-117111601370_1.html|title=Bharati Defence and Infrastructure delivers vessel to Indian Coast Guard|newspaper=Business Standard India|date=16 November 2017|last1=Market|first1=Capital}}</ref>
| total_ships_laid_up =
| total_ships_lost =
| total_ships_retired =
| total_ships_scrapped =
| total_ships_preserved =
}}
|section3={{Infobox ship/characteristics
| hide_header =
| header_caption =
| type = Interceptor boat
| tonnage =
| displacement = {{Convert|107|t|lk=on}}
| length = {{Convert|27.6|m|ftin|abbr=on}}
| beam = {{Convert|6.17|m|ftin|abbr=on}}
| height =
| draught = {{Convert|1.2|m|ftin|abbr=on}}
| depth = {{Convert|3.1|m|ftin|abbr=on}}
| hold_depth =
| decks =
| deck_clearance =
| power =
| propulsion = * 2 × Caterpillar MTU Friedrichshafen Gmbh 1630KW engines
                * 2 × 69 kW 415 V 50 Hz AC
| speed = {{Convert|35|kn|lk=in}}
| range =
| endurance =
| troops =
| complement = 1 officer and 12 enlisted
| time_to_activate =
| sensors =
| EW =
| armament =
| armour =
| notes =
}}
}}
}}
{{Infobox ship image
| Ship image = Thane Creek and Elephanta Island 03-2016 - img08 Ships on Thane Creek.jpg
| Ship caption = Coast Guard Interceptor boat C-154
}}
{{Infobox ship class overview
|Name=Bharati-class interceptor craft
|Builders= [[Bharati Shipyard]]
|Operators=[[Indian Coast Guard]]
|Class before=
|Class after=
|Subclasses=
|Cost=
|Built range=2009–present
|In service range=
|In commission range=2013–present
|Total ships building=8
|Total ships planned=15
|Total ships completed=7
|Total ships cancelled=
|Total ships active=6<ref>{{Cite news|url=http://wap.business-standard.com/article/news-cm/bharati-defence-and-infrastructure-delivers-vessel-to-indian-coast-guard-117111601370_1.html|title=Bharati Defence and Infrastructure delivers vessel to Indian Coast Guard|newspaper=Business Standard India|date=16 November 2017|last1=Market|first1=Capital}}</ref>
|Total ships laid up=
|Total ships lost=
|Total ships retired=
|Total ships scrapped=
|Total ships preserved=
}}
{{Infobox ship characteristics
| Hide header =
| Header caption =
| Ship type = Interceptor boat
| Ship tonnage =
| Ship displacement = {{Convert|107|t|lk=on}}
| Ship length = {{Convert|27.6|m|ftin|abbr=on}}
| Ship beam = {{Convert|6.17|m|ftin|abbr=on}}
| Ship height =
| Ship draught = {{Convert|1.2|m|ftin|abbr=on}}
| Ship depth = {{Convert|3.1|m|ftin|abbr=on}}
| Ship hold depth =
| Ship decks =
| Ship deck clearance =
| Ship power =
| Ship propulsion = * 2 × Caterpillar MTU Friedrichshafen Gmbh 1630KW engines
* 2 × 69 kW 415 V 50 Hz AC
| Ship speed = {{Convert|35|kn|lk=in}}
| Ship range =
| Ship endurance =
| Ship troops =
| Ship complement = 1 officer and 12 enlisted
| Ship time to activate =
| Ship sensors =
| Ship EW =
| Ship armament =
| Ship armour =
| Ship notes =
}}
|}
'''Bharati-class of interceptor boats''' are a series of fifteen watercraft being built by [[Bharati Shipyard]] for the [[Indian Coast Guard]].<ref name=irclass>[http://www.irclass.org/ship_info# IR Class ship info] {{webarchive|url=https://web.archive.org/web/20130621234432/http://www.irclass.org/ship_info |date=21 June 2013 }}</ref>
'''Bharati-class of interceptor boats''' are a series of fifteen watercraft being built by [[Bharati Shipyard]] for the [[Indian Coast Guard]].<ref name=irclass>[http://www.irclass.org/ship_info# IR Class ship info] {{webarchive|url=https://web.archive.org/web/20130621234432/http://www.irclass.org/ship_info |date=21 June 2013 }}</ref>


Line 65: Line 66:
The vessels in the series have an aluminium hull, and have a length of 28 meters, with beam of 6 meters and draught of 1.2 meters.<ref name="irclass" /> They are powered by twin MTU Caterpillar engines having capacity of 1630&nbsp;kW each. They have Articulate Surface Piercing Propulsion and can attain a speed of more than 35 knots. The vessels can perform high-speed interception, close-coast patrol, low-intensity maritime operations, search-and-rescue and surveillance. They have a complement of one officer and 12 sailors. They are being constructed as per a {{INRConvert|2.81|b|0}} contract signed with the [[Ministry of Defence (India)|Ministry of Defence]], which was announced on 6 March 2009.<ref name=business>{{cite news|title=Bharati Shipyard bags Rs 281 cr defence contract|url=http://www.business-standard.com/india/news/bharati-shipyard-bags-rs-281-cr-defence-contract/56236/on|accessdate=31 January 2013|newspaper=Business Standard|date=6 March 2009|url-status=live|archiveurl=https://web.archive.org/web/20121015151534/http://www.business-standard.com/india/news/bharati-shipyard-bags-rs-281-cr-defence-contract/56236/on|archivedate=15 October 2012}}</ref>
The vessels in the series have an aluminium hull, and have a length of 28 meters, with beam of 6 meters and draught of 1.2 meters.<ref name="irclass" /> They are powered by twin MTU Caterpillar engines having capacity of 1630&nbsp;kW each. They have Articulate Surface Piercing Propulsion and can attain a speed of more than 35 knots. The vessels can perform high-speed interception, close-coast patrol, low-intensity maritime operations, search-and-rescue and surveillance. They have a complement of one officer and 12 sailors. They are being constructed as per a {{INRConvert|2.81|b|0}} contract signed with the [[Ministry of Defence (India)|Ministry of Defence]], which was announced on 6 March 2009.<ref name=business>{{cite news|title=Bharati Shipyard bags Rs 281 cr defence contract|url=http://www.business-standard.com/india/news/bharati-shipyard-bags-rs-281-cr-defence-contract/56236/on|accessdate=31 January 2013|newspaper=Business Standard|date=6 March 2009|url-status=live|archiveurl=https://web.archive.org/web/20121015151534/http://www.business-standard.com/india/news/bharati-shipyard-bags-rs-281-cr-defence-contract/56236/on|archivedate=15 October 2012}}</ref>


The first Bharati-class interceptor boat has IRS no. 40567 and its pennant no. is C-154. It was commissioned in [[Mumbai]] on 22 February 2013 in the presence of Maharashtra Chief Secretary J.K. Banthia and S.P.S. Basra, Inspector General (IG), Coast Guard Region (West).<ref>{{cite news |url=http://www.thehindu.com/news/national/new-interceptor-boat-joins-coast-guard/article4442936.ece |title=New interceptor boat joins Coast Guard |newspaper=The Hindu |date=22 February 2013 |accessdate=2016-03-14 |url-status=live|archiveurl=https://web.archive.org/web/20130604022420/http://www.thehindu.com/news/national/new-interceptor-boat-joins-coast-guard/article4442936.ece |archivedate=4 June 2013 }}</ref> It was constructed by Bharati shipyards units at [[Vasco Da Gama]]
The first Bharati-class interceptor boat has IRS no. 40567 and its pennant no. is C-154. It was commissioned in [[Mumbai]] on 22 February 2013 in the presence of Maharashtra Chief Secretary J.K. Banthia and S.P.S. Basra, Inspector General (IG), Coast Guard Region (West).<ref>{{cite news |url=http://www.thehindu.com/news/national/new-interceptor-boat-joins-coast-guard/article4442936.ece |title=New interceptor boat joins Coast Guard |newspaper=The Hindu |date=22 February 2013 |accessdate=2016-03-14 |url-status=live|archiveurl=https://web.archive.org/web/20130604022420/http://www.thehindu.com/news/national/new-interceptor-boat-joins-coast-guard/article4442936.ece |archivedate=4 June 2013 }}</ref> It was constructed by Bharati shipyards units at [[Vasco da Gama, Goa|Vasco Da Gama]].{{citation needed|date=February 2024}}


== Ships of the class ==
== Ships of the class ==
Line 79: Line 80:
|C-155
|C-155
|14 May 2015
|14 May 2015
|Karwar<ref>{{Cite web|title = Coast Guard commissions four boats at Porbandar|url = http://articles.economictimes.indiatimes.com/2015-05-14/news/62165577_1_indian-coast-guard-ship-porbandar-boats|website = timesofindia-economictimes|accessdate = 2015-12-27}}</ref>
|Karwar<ref>{{Cite web|title = Coast Guard commissions four boats at Porbandar|url = http://articles.economictimes.indiatimes.com/2015-05-14/news/62165577_1_indian-coast-guard-ship-porbandar-boats|archive-url = https://web.archive.org/web/20151017095805/http://articles.economictimes.indiatimes.com/2015-05-14/news/62165577_1_indian-coast-guard-ship-porbandar-boats|url-status = dead|archive-date = 17 October 2015|website = timesofindia-economictimes|accessdate = 2015-12-27}}</ref>
|-
|-
|C-156
|C-156
Line 86: Line 87:
|-
|-
|C-158
|C-158
|12 April 2016<ref>{{Cite web|url=http://indiatoday.intoday.in/story/coast-guard-interceptor-boat-commissioned/1/641313.html|title=Coast Guard interceptor boat commissioned|website=indiatoday.intoday.in|access-date=2016-04-25|url-status=live|archiveurl=https://web.archive.org/web/20160421132247/http://indiatoday.intoday.in/story/coast-guard-interceptor-boat-commissioned/1/641313.html|archivedate=21 April 2016}}</ref>
|12 April 2016<ref>{{Cite web|url=https://www.indiatoday.in/pti-feed/story/coast-guard-interceptor-boat-commissioned-589149-2016-04-12|title=Coast Guard interceptor boat commissioned|website=indiatoday.intoday.in|date=12 April 2016 |access-date=2016-04-25|url-status=live|archive-url=https://web.archive.org/web/20160421132247/http://indiatoday.intoday.in/story/coast-guard-interceptor-boat-commissioned/1/641313.html|archive-date=21 April 2016}}</ref>
|Goa
|Goa
|-
|-
Line 95: Line 96:
|C-162
|C-162
|30 May 2018
|30 May 2018
|Vizhinjam<ref>{{Cite news|url=http://www.thehindu.com/news/cities/Thiruvananthapuram/coast-guard-ship-commissioned/article24025829.ece|title=Coast Guard ship commissioned|date=2018-05-29|work=The Hindu|access-date=2018-05-30|others=Special Correspondent|language=en-IN|issn=0971-751X}}</ref>
|Vizhinjam<ref>{{Cite news|url=http://www.thehindu.com/news/cities/Thiruvananthapuram/coast-guard-ship-commissioned/article24025829.ece|title=Coast Guard ship commissioned|date=2018-05-29|work=The Hindu|access-date=2018-05-30|language=en-IN|issn=0971-751X}}</ref>
|}
|}



Latest revision as of 03:28, 14 December 2025

Lua error in package.lua at line 80: module 'Module:Infobox_ship/data' not found. Bharati-class of interceptor boats are a series of fifteen watercraft being built by Bharati Shipyard for the Indian Coast Guard.[1]

Description[edit | edit source]

The vessels in the series have an aluminium hull, and have a length of 28 meters, with beam of 6 meters and draught of 1.2 meters.[1] They are powered by twin MTU Caterpillar engines having capacity of 1630 kW each. They have Articulate Surface Piercing Propulsion and can attain a speed of more than 35 knots. The vessels can perform high-speed interception, close-coast patrol, low-intensity maritime operations, search-and-rescue and surveillance. They have a complement of one officer and 12 sailors. They are being constructed as per a ₹2.81 billion (US$39 million) contract signed with the Ministry of Defence, which was announced on 6 March 2009.[2]

The first Bharati-class interceptor boat has IRS no. 40567 and its pennant no. is C-154. It was commissioned in Mumbai on 22 February 2013 in the presence of Maharashtra Chief Secretary J.K. Banthia and S.P.S. Basra, Inspector General (IG), Coast Guard Region (West).[3] It was constructed by Bharati shipyards units at Vasco Da Gama.[citation needed]

Ships of the class[edit | edit source]

Pennant No Commissioned Homeport
C-154 22 February 2013 Mumbai[4][5]
C-155 14 May 2015 Karwar[6]
C-156 12 March 2016 Pipavav[7][8]
C-158 12 April 2016[9] Goa
C-161 5 January 2018[10] Vadinar
C-162 30 May 2018 Vizhinjam[11]

See also[edit | edit source]

References[edit | edit source]

  1. ↑ 1.0 1.1 IR Class ship info Archived 21 June 2013 at the Wayback Machine
  2. ↑ "Bharati Shipyard bags Rs 281 cr defence contract". Business Standard. 6 March 2009. Archived from the original on 15 October 2012. Retrieved 31 January 2013.
  3. ↑ "New interceptor boat joins Coast Guard". The Hindu. 22 February 2013. Archived from the original on 4 June 2013. Retrieved 14 March 2016.
  4. ↑ "Nirmal New Online". 22 February 2013. Archived from the original on 25 January 2016.
  5. ↑ "New interceptor boat joins Coast Guard". The Hindu. 22 February 2013. ISSN 0971-751X. Archived from the original on 4 June 2013.
  6. ↑ "Coast Guard commissions four boats at Porbandar". timesofindia-economictimes. Archived from the original on 17 October 2015. Retrieved 27 December 2015.
  7. ↑ "Indian Coast Guard commissions new vessel at Porbandar". The Indian Express. 12 March 2016. Archived from the original on 13 March 2016. Retrieved 12 March 2016.
  8. ↑ "Indian Coast Guard Ship C- 156 commissioned at Porbandar". DeshGujarat. 12 March 2016. Archived from the original on 13 March 2016. Retrieved 12 March 2016.
  9. ↑ "Coast Guard interceptor boat commissioned". indiatoday.intoday.in. 12 April 2016. Archived from the original on 21 April 2016. Retrieved 25 April 2016.
  10. ↑ "Indian Coast Guard Ship C-161 commissioned in Porbandar". aninews.in. Retrieved 8 January 2018.
  11. ↑ "Coast Guard ship commissioned". The Hindu. 29 May 2018. ISSN 0971-751X. Retrieved 30 May 2018.

External links[edit | edit source]