Kudlu Gate metro station: Difference between revisions

Created by Ajay Kumar
Last edited February 5, 2026
Creating a new article
 
minor edit
 
Line 1: Line 1:
{{Short description|Upcoming Namma Metro station under Yellow Line}}
{{Short description|Namma Metro's Yellow Line metro station}}
{{Use dmy dates|date=August 2023}}
{{Use dmy dates|date=December 2024}}
{{Use Indian English|date=August 2023}}
{{Use Indian English|date=December 2024}}
{{Infobox station
{{Infobox station
| name              = Kudlu Gate
| name              = Kudlu Gate
| type              = {{Namma Metro Infobox station line|line=Yellow}}
| type              = {{Namma Metro Infobox station line|line=Yellow}}
| style              = Namma Metro
| style              = Namma Metro
| image              =  
| image              = Kudlu Gate metro station (Apr '24).jpg
| image_size        =  
| image_size        =  
| image_caption      =  
| image_caption      = Final stages of this metro station as of April 2024
| address            = Hosur Rd, Kudlu Gate, Industrial Layout, Singasandra, Bengaluru, Karnataka 560068
| address            = Hosur Rd, Kudlu Gate, Industrial Layout, Singasandra, Bengaluru, Karnataka 560068
| coordinates        = {{coord|12.88992|77.63929|display=inline,title}}
| coordinates        = {{coord|12.88992|77.63929|display=inline,title}}
Line 14: Line 14:
| other              =  
| other              =  
| structure          = [[Elevated]], [[Double-track railway|Double track]]
| structure          = [[Elevated]], [[Double-track railway|Double track]]
| platform          = [[Side platform]]<br/>Platform-1 → [[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]<br/>Platform-2 → [[Bommasandra metro station|Bommasandra]] <br/><small>''Platform numbers (TBC)''</small>
| platform          = [[Side platform]]<br>Platform-1 → {{stl|Namma Metro|Rashtreeya Vidyalaya Road}}<br/>Platform-2 → [[Delta Electronics Bommasandra metro station|Delta Electronics Bommasandra]]
| depth              =  
| depth              =  
| levels            = '''''(TBC)'''''
| levels            = 2
| tracks            = '''''(TBC)'''''
| tracks            = 2
| parking            = '''''(TBC)'''''
| parking            = Two-Wheeler Parking only
| bicycle            =  
| bicycle            =  
| baggage_check      =  
| baggage_check      =  
| opening            = {{start date and age|December 2023|df=y}} '''''(TBC)'''''
| opened            = {{start date and age|10 August 2025|df=y}}
| opening            =
| closed            =  
| closed            =  
| rebuilt            =  
| rebuilt            =  
| electrified        = 750 [[Volt|V]] [[Direct current|DC]] [[third rail]] '''''(TBC)'''''
| electrified        = 750 [[Volt|V]] [[Direct current|DC]] [[third rail]]
| ADA                = '''''(TBC)'''''
| accessible        = Yes {{access icon}}
| status            = Under Construction
| status            = Operational and Staffed
| code              = '''''(TBC)'''''
| code              = MSRN
| owned              = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL)
| owned              = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL)
| operator          = [[Namma Metro]]
| operator          = [[Namma Metro]]
| architect          =  
| architect          = ITD - ITD Cementation India [[Joint Venture|JV]]
| architectural_style =  
| architectural_style =  
| wifi              =  
| wifi              =  
Line 43: Line 44:
| pass_system        =  
| pass_system        =  
| mpassengers        =  
| mpassengers        =  
| services          = {{Adjacent stations|system=Namma Metro|line=Yellow|left=Hongasandra|to-left=Rashtreeya Vidyalaya Road|note-mid=''(Future Service by December 2023)''|right=Singasandra|to-right=Bommasandra}}
| services          = {{Adjacent stations|system=Namma Metro|line=Yellow|left=Hongasandra|to-left=Rashtreeya Vidyalaya Road|right=Singasandra|to-right=Delta Electronics Bommasandra}}
| route_map          = {{BMR Yellow Line}}
| route_map          = {{BMR Yellow Line}}
| map_state          = collapsed
| map_state          = collapsed
Line 52: Line 53:
}}
}}


'''Kudlu Gate''' is an upcoming elevated metro station on the North-South corridor of the [[Yellow Line (Namma Metro)|Yellow Line]] of [[Namma Metro]] in [[Bangalore]], India. Around this metro station holds the Hotel Ekaa Keys by Rivido and Pai Internationals Warehouse in Bengaluru. This metro station is stated to be operational around December 2023.<ref>{{Cite web |date=2023-07-26 |title=Namma Metro Update: Bengaluru’s biggest metro station, Jayadeva junction slated for year-end launch |url=https://www.financialexpress.com/business/infrastructure-namma-metro-update-bengalurus-biggest-metro-station-jayadeva-junctionnbspslated-for-year-end-launch-3187067/ |access-date=2023-08-31 |website=Financialexpress |language=en}}</ref><ref>{{Cite web |date=2023-07-25 |title=Namma Metro News: Bengaluru's Biggest Metro Station at Jayadeva Junction Set to Open by Year-End |url=https://www.timesnownews.com/bengaluru/namma-metro-news-bengalurus-biggest-metro-station-at-jayadeva-junction-set-to-open-by-year-end-article-102101344 |access-date=2023-08-31 |website=TimesNow |language=en}}</ref><ref>{{Cite web |last=Reporter |first=Staff |date=2023-07-24 |title=Bengaluru's Jayadeva Junction: Largest Metro Station Expected to Open by End of 2023 |url=https://www.metrorailnews.in/bengalurus-jayadeva-junction-largest-metro-station-expected-to-open-by-end-of-2023/ |access-date=2023-08-31 |website=Metro Rail News |language=en-US}}</ref>
'''Kudlu Gate''' is an elevated metro station on the North-South corridor of the [[Yellow Line (Namma Metro)|Yellow Line]] of [[Namma Metro]] in [[Bengaluru]], India.
 
== History ==
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Kudlu Gate metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation [[Joint venture|JV]] was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.<ref>{{Cite web |date=2017-04-25 |title=ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Hosa Rd - HSR Layout |url=https://themetrorailguy.com/2017/04/25/itd-itd-cem-jv-lowest-bidder-for-blore-metros-hosa-rd-hsr-layout/ |access-date=2024-10-24 |website=The Metro Rail Guy |language=en-US}}</ref> Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
 
The [[Yellow Line (Namma Metro)|Yellow Line]] began operations from 10 August 2025 and has been officially inaugurated by Prime Minister [[Narendra Modi]], with four trainsets which are ready for operations after arriving from [[Titagarh Rail Systems]] in Kolkata.<ref>{{Cite web |last=Mishra |first=Anupriya |date=2025-08-10 |title=As PM Narendra Modi Inaugurates Namma Metro Yellow Line, Here’s All About This New Route |url=https://curlytales.com/india/ct-scoop/as-pm-narendra-modi-inaugurates-namma-metro-yellow-line-heres-all-about-this-new-route/ |access-date=2025-08-10 |website=Curly Tales |language=en-US}}</ref>'''<ref>{{Cite web |date=2025-08-03 |title=PM Modi to inaugurate Bengaluru metro Yellow Line, launch Phase-3 expansion on August 10 |url=https://indianexpress.com/article/cities/bangalore/pm-modi-inaugurate-bengaluru-metro-yellow-line-august-10-10166672/ |access-date=2025-08-03 |website=The Indian Express |language=en}}</ref>'''<ref>{{Cite web |title=Namma Metro Yellow Line Updates, Metro Delay Bengaluru: Yellow Line Launch Pushed to July-End Amid Snags {{!}} Bengaluru Metro News |url=https://www.deccanherald.com/india/karnataka/bengaluru/yellow-line-delayed-again-won-t-open-before-july-end-3558406 |access-date=2025-05-27 |website=Deccan Herald |language=en}}</ref><ref>{{Cite web |date=27 May 2025 |title=Bengaluru's Yellow Line Metro faces further delay, unlikely to open before July-end: Report |url=https://www.hindustantimes.com/cities/bengaluru-news/bengalurus-yellow-line-metro-faces-further-delay-unlikely-to-open-before-july-end-report-101748327183616.html |access-date=27 May 2025 |website=Hindustan Times}}</ref><ref>{{Cite web |date=2025-04-06 |title=Bengaluru Namma Metro Update: Yellow Line Operations To Start In June {{!}} Check Status, Key Stations |url=https://www.thedailyjagran.com/india/bengaluru-namma-metro-update-yellow-line-operations-to-start-in-june-check-status-key-stations-10228542 |access-date=2025-04-06 |website=English Jagran |language=en}}</ref><ref>{{Cite web |date=2025-04-05 |title=Bengaluru Metro Yellow Line: Operations To Start By June? Check Current Status & Key Stations |url=https://www.timesnownews.com/bengaluru/bangalore-metro-yellow-line-operations-to-start-in-june-check-current-status-and-key-stations-article-151355237 |access-date=2025-04-06 |website=Times Now |language=en}}</ref><ref>{{Cite web |last=Parangi |first=Shankrappa |date=2025-04-06 |title=Namma Metro Yellow line: ಏಪ್ರಿಲ್ ಅಂತ್ಯಕ್ಕೆ 3ನೇ ರೈಲು, ಹಳದಿ ಮಾರ್ಗ ಕಾರ್ಯಾಚರಣೆ ಅಪ್ಡೇಟ್ |url=https://kannada.oneindia.com/news/bengaluru/bengaluru-namma-metro-yellow-line-to-be-open-by-june-july-2025-407879.html |access-date=2025-04-06 |website=kannada.oneindia.com |language=kn}}</ref> The opening was delayed from May 2025 as previously announced by the [[Namma Metro]] Managing Director, Maheshwar Rao.<ref name=":522">{{Cite web |date=2025-03-11 |title=Bengaluru Metro Yellow Line To Become Operational By May 2025, Pink Line To Be Ready For Public Use By... |url=https://www.timesnownews.com/bengaluru/bangalore-metro-news-namma-metro-yello-line-and-pink-line-to-open-by-this-month-see-namma-metro-line-opening-news-article-118870216 |access-date=2025-03-12 |website=Times Now |language=en}}</ref><ref>{{Cite web |date=2025-03-10 |title=Bengaluru: Namma Metro Yellow Line From RV Road To Bommasandra, Connecting Electronics City, Set To Open By May 2025 |url=https://www.thedailyjagran.com/india/bengaluru-namma-metro-yellow-line-rv-road-to-bommasandra-connecting-electronics-city-set-to-open-by-may-2025-10222975 |access-date=2025-03-12 |website=English Jagran |language=en}}</ref><ref>{{Cite web |title=Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway |url=https://www.deccanherald.com/india/karnataka/bengaluru/bengaluru-metro-plans-to-open-yellow-line-in-april-with-4-trains-30-min-headway-3343856 |access-date=2025-01-07 |website=Deccan Herald |language=en}}</ref>


== Station layout ==
== Station layout ==
'''''Station Layout (TBC)'''''
{{stack|{{Routemap
{{stack|{{Routemap
| title = Kudlu Gate track layout '''''(TBC)'''''
| title = Kudlu Gate track layout
| title color = black
| title color = black
| title-bg = #{{rail color|Namma Metro|Yellow}}
| title-bg = #{{rail color|Namma Metro|Yellow}}
Line 63: Line 68:
| collapsible = no
| collapsible = no
| map = vCONTgfa
| map = vCONTgfa
cBS\vSTR\cBS ~~ ~~ ~~ to {{stl|Namma Metro|Hongasandra}}
cPLT\vSTR\cPLT ~~ ~~ ~~ to {{stl|Namma Metro|Hongasandra}}
*'''P1'''\cBS\vSTR\cBS\*'''P2'''
*'''P1'''\cPLT\vSTR\cPLT\*'''P2'''
cBS\vSTR\cBS ~~ ~~ ~~ to {{stl|Namma Metro|Singasandra}}
cPLT\vSTR\cPLT ~~ ~~ ~~ to {{stl|Namma Metro|Singasandra}}
vCONTgfe
vCONTgfe
| bottom = <div style="width:23.5em;text-align:center">Station with two tracks and two side platforms
| bottom = <div style="width:23.5em;text-align:center">Station with two tracks and two side platforms</div>
}}}}
}}}}
{|table border=0 cellspacing=0 cellpadding=3
{|table border=0 cellspacing=0 cellpadding=3
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=50 valign=top|'''G'''
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=30 valign=top|'''G'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=100 valign=top|Street level
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=85 valign=top|Street level
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance
|-
|-
|valign=top|'''L1'''
|valign=top|'''L1'''
|valign=top|Mezzanine
|valign=top|Mezzanine
|valign=top|Fare control, station agent, Metro Card vending machines, crossover<br/>
|valign=top|Fare control, station agent, Metro Card vending machines, crossover<br>
|-
|-
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=50 rowspan=4 valign=top|'''L2'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=30 rowspan=4 valign=top|'''L2'''
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small>
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small>
|-
|-
|style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{rail color|Namma Metro|Yellow}}>'''Platform 2'''<br/>'''Southbound'''</span>
|style="border-bottom:solid 1px gray;" width=85|<span style=color:#{{rail color|Namma Metro|Yellow}}>'''Platform 2'''<br>'''Southbound'''</span>
|style="border-bottom:solid 1px gray;" width=500|Towards → [[Bommasandra metro station|Bommasandra]] <small>next station is [[Singasandra metro station|Singasandra]]</small>
|style="border-bottom:solid 1px gray;" width=500|Towards → [[Delta Electronics Bommasandra metro station|Delta Electronics Bommasandra]]<br><small>'''Next Station:''' {{stl|Namma Metro|Singasandra}}</small>
|-
|-
|<span style=color:#{{rail color|Namma Metro|Yellow}}>'''Platform 1'''<br/>'''Northbound'''</span>  
|<span style=color:#{{rail color|Namma Metro|Yellow}}>'''Platform 1'''<br>'''Northbound'''</span>  
|Towards ← [[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]] <small>next station is [[Hongasandra metro station|Hongasandra]]</small>
|Towards ← {{stl|Namma Metro|Rashtreeya Vidyalaya Road}}<br><small>'''Next Station:''' {{stl|Namma Metro|Hongasandra}}</small>
|-
|-
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2  align=center|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small>
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2  align=center|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small>
|-
|-
|style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|'''L2'''
|style="border-bottom:solid 1px gray;" width=30 rowspan=2 valign=top|'''L2'''
|style="border-bottom:solid 1px gray;" width=100|
|style="border-bottom:solid 1px gray;" width=85|
|style="border-bottom:solid 1px gray;" width=500|
|style="border-bottom:solid 1px gray;" width=500|
|-
|-
|}
|}


==Entry/Exits==
== Gallery ==
{{Empty section|date=August 2023}}
Here are some of the metro station captures shown below:-<gallery class="center" mode="packed-hover" heights="120" widths="195">
File:Kudlu Gate metro station (Sept '23).jpg|This metro station on {{Abbr|U/C|Under Construction}} as of September 2023
File:Kudlu Gate metro station.jpg|This metro station as of September 2024
File:Kudlu Gate metro station 3.jpg|This metro station as of September 2024
</gallery>


==See also==
==See also==
*[[Bangalore]]
*[[Bengaluru]]
*[[List of Namma Metro stations]]
*[[List of Namma Metro stations]]
*[[Transport in Karnataka]]
*[[Transport in Karnataka]]
Line 105: Line 114:
*[[Rapid transit in India|List of rapid transit systems in India]]
*[[Rapid transit in India|List of rapid transit systems in India]]
{{Clear}}
{{Clear}}
{{Portal bar|Bangalore|Transport|Engineering}}
{{Portal bar|Bengaluru|Transport|Engineering}}


==References==
==References==
Line 113: Line 122:
{{Commons|Namma Metro}}
{{Commons|Namma Metro}}
{{Wikivoyage|Bangalore}}
{{Wikivoyage|Bangalore}}
* [https://web.archive.org/web/20170629131050/http://www.bmrc.co.in/English/index.html Bangalore Metro Rail Corporation Ltd. (Official site)]  
* [https://english.bmrc.co.in Bangalore Metro Rail Corporation Ltd. (Official site)]  
* [http://www.urbanrail.net ''UrbanRail.Net''] – descriptions of all metro systems in the world, each with a schematic map showing all stations.
* [http://www.urbanrail.net ''UrbanRail.Net''] – descriptions of all metro systems in the world, each with a schematic map showing all stations.


{{Namma Metro}}
{{Namma Metro|yellow line=yes}}


[[Category:Namma Metro stations]]
[[Category:Namma Metro stations]]
[[Category:Proposed railway stations in India]]
[[Category:Proposed railway stations in India]]

Latest revision as of 10:01, 5 February 2026


Kudlu Gate
Template:Namma Metro Infobox station line
Final stages of this metro station as of April 2024
LocationHosur Rd, Kudlu Gate, Industrial Layout, Singasandra, Bengaluru, Karnataka 560068
Coordinates12°53′24″N 77°38′21″E / 12.88992°N 77.63929°E / 12.88992; 77.63929
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb
PlatformsSide platform
Platform-1 → Template:Stl
Platform-2 → Delta Electronics Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
ParkingTwo-Wheeler Parking only
ArchitectITD - ITD Cementation India JV
Other information
StatusOperational and Staffed
Station codeMSRN
History
Opened10 August 2025; 11 months ago (10 August 2025)
Electrified750 V DC third rail
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Kudlu Gate is an elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

History[edit | edit source]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Kudlu Gate metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[1] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[2][3][4][5][6][7][8] The opening was delayed from May 2025 as previously announced by the Namma Metro Managing Director, Maheshwar Rao.[9][10][11]

Station layout[edit | edit source]

style="color:black;background:#Template:Rail color;text-align:center;padding:5px"|
Kudlu Gate track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics Bommasandra
Next Station: Template:Stl
Platform 1
Northbound
Towards ← Template:Stl
Next Station: Template:Stl
Side platform | Doors will open on the left Disabled access
L2

Gallery[edit | edit source]

Here are some of the metro station captures shown below:-

See also[edit | edit source]

References[edit | edit source]

  1. "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Hosa Rd - HSR Layout". The Metro Rail Guy. 25 April 2017. Retrieved 24 October 2024.
  2. Mishra, Anupriya (10 August 2025). "As PM Narendra Modi Inaugurates Namma Metro Yellow Line, Here's All About This New Route". Curly Tales. Retrieved 10 August 2025.
  3. "PM Modi to inaugurate Bengaluru metro Yellow Line, launch Phase-3 expansion on August 10". The Indian Express. 3 August 2025. Retrieved 3 August 2025.
  4. "Namma Metro Yellow Line Updates, Metro Delay Bengaluru: Yellow Line Launch Pushed to July-End Amid Snags | Bengaluru Metro News". Deccan Herald. Retrieved 27 May 2025.
  5. "Bengaluru's Yellow Line Metro faces further delay, unlikely to open before July-end: Report". Hindustan Times. 27 May 2025. Retrieved 27 May 2025.
  6. "Bengaluru Namma Metro Update: Yellow Line Operations To Start In June | Check Status, Key Stations". English Jagran. 6 April 2025. Retrieved 6 April 2025.
  7. "Bengaluru Metro Yellow Line: Operations To Start By June? Check Current Status & Key Stations". Times Now. 5 April 2025. Retrieved 6 April 2025.
  8. Parangi, Shankrappa (6 April 2025). "Namma Metro Yellow line: ಏಪ್ರಿಲ್ ಅಂತ್ಯಕ್ಕೆ 3ನೇ ರೈಲು, ಹಳದಿ ಮಾರ್ಗ ಕಾರ್ಯಾಚರಣೆ ಅಪ್ಡೇಟ್". kannada.oneindia.com (in ಕನ್ನಡ). Retrieved 6 April 2025.
  9. "Bengaluru Metro Yellow Line To Become Operational By May 2025, Pink Line To Be Ready For Public Use By..." Times Now. 11 March 2025. Retrieved 12 March 2025.
  10. "Bengaluru: Namma Metro Yellow Line From RV Road To Bommasandra, Connecting Electronics City, Set To Open By May 2025". English Jagran. 10 March 2025. Retrieved 12 March 2025.
  11. "Bengaluru Metro plans to open yellow line in April with 4 trains, 30-min headway". Deccan Herald. Retrieved 7 January 2025.

External links[edit | edit source]

Template:Namma Metro