Created by Derekbridges
Last edited December 21, 2022
>Derekbridges
fix template links
 
robot: Create/upgrade articles. If there is a mistake please report on my talk page.
Line 1: Line 1:
{{short description|The second of the Indian Navy's six Kalvari-class submarines being built in India.}}
{{short description|The second of the Indian Navy's six Kalvari-class submarines being built in India.}}
{{other ships||INS Khanderi}}
{{other ships||INS Khanderi}}
{{Use dmy dates|date=July 2019}}
{{Use dmy dates|date=July 2022}}
{{Use Indian English|date=July 2019}}
{{Use Indian English|date=July 2022}}
{|{{Infobox ship begin}}
{|{{Infobox ship begin}}
{{Infobox ship image
{{Infobox ship image
Line 13: Line 13:
|Ship flag= {{shipboxflag|India|naval}}
|Ship flag= {{shipboxflag|India|naval}}
|Ship name= INS ''Khanderi''  
|Ship name= INS ''Khanderi''  
|Ship namesake=
|Ship namesake=[[INS Khanderi (1968)|INS ''Khanderi'' (1968)]]
|Ship ordered=2005
|Ship ordered=2005
|Ship builder= [[Mazagon Dock Limited]], [[Mumbai]]
|Ship builder= [[Mazagon Dock Limited]], [[Mumbai]]
Line 19: Line 19:
|Ship launched=12 January 2017<ref>{{cite press release|url=https://www.indiannavy.nic.in/content/submarine-khanderi-launched|title=Submarine 'Khanderi' Launched|publisher=Indian Navy|date=2017-01-12|accessdate=2017-01-12}}</ref>
|Ship launched=12 January 2017<ref>{{cite press release|url=https://www.indiannavy.nic.in/content/submarine-khanderi-launched|title=Submarine 'Khanderi' Launched|publisher=Indian Navy|date=2017-01-12|accessdate=2017-01-12}}</ref>
|Ship completed=
|Ship completed=
|Ship acquired= 20 September 2019<ref>{{cite web|url=https://www.jagranjosh.com/current-affairs/ins-khanderi-a-scorpene-class-submarine-handed-over-to-navy-1568961057-1|title=INS Khanderi: A Scorpene class submarine, handed over to Navy|access-date=12 November 2020|date=20 September 2019}}</ref>
|Ship acquired= 20 September 2019<ref>{{cite web|url=https://www.jagranjosh.com/current-affairs/ins-khanderi-a-scorpene-class-submarine-handed-over-to-navy-1568961057-1|title=INS Khanderi: A Scorpene class submarine, handed over to Navy|access-date=12 November 2020|date=20 September 2022}}</ref>
|Ship commissioned=28 September 2019<ref name="active" />
|Ship commissioned=28 September 2019<ref name="active" />
|Ship decommissioned=
|Ship decommissioned=
Line 26: Line 26:
|Ship struck=
|Ship struck=
|Ship reinstated=
|Ship reinstated=
|Ship identification=[[Pennant number]]: S22<ref>{{cite web |title=India commissions second Scorpène submarine, launches first Project 17A frigate |url=https://www.janes.com/article/91597/india-commissions-second-scorp%E8ne-submarine-launches-first-project-17a-frigate |website=Janes |accessdate=1 October 2019}}</ref>
|Ship identification=[[Pennant number]]: S22<ref>{{cite web |title=India commissions second Scorpène submarine, launches first Project 17A frigate |url=https://www.janes.com/article/91597/india-commissions-second-scorp%E8ne-submarine-launches-first-project-17a-frigate |website=Janes |accessdate=1 October 2022}}</ref>
|Ship motto= *[[Sanskrit]]: ''Akhand Abhedya Adrishya''<ref>{{cite web |title=Raksha Mantri Commissions INS Khanderi at Mumbai {{!}} Indian Navy |url=https://www.indiannavy.nic.in/content/raksha-mantri-commissions-ins-khanderi-mumbai |website=Indian Navy |accessdate=1 October 2019}}</ref>
|Ship motto= *[[Sanskrit]]: ''Akhand Abhedya Adrishya''<ref>{{cite web |title=Raksha Mantri Commissions INS Khanderi at Mumbai {{!}} Indian Navy |url=https://www.indiannavy.nic.in/content/raksha-mantri-commissions-ins-khanderi-mumbai |website=Indian Navy |accessdate=1 October 2022}}</ref>
|Ship fate=  
|Ship fate=  
|Ship status= In active service
|Ship status= In active service
Line 35: Line 35:
| Hide header =  
| Hide header =  
| Header caption =  
| Header caption =  
| Ship class = {{sclass|Kalvari|submarine|||2015}}
| Ship class = {{sclass|Kalvari|submarine|||2022}}
| Ship tonnage =  
| Ship tonnage =  
| Ship displacement = *'''Surfaced''': {{convert|1,615|t|ST}}
| Ship displacement = *'''Surfaced''': {{convert|1,615|t|ST}}
Line 50: Line 50:
| Ship range = *{{convert|6500|nmi|km|lk=in|abbr=on}} at {{convert|8|kn|km/h|abbr=on}} (surfaced)
| Ship range = *{{convert|6500|nmi|km|lk=in|abbr=on}} at {{convert|8|kn|km/h|abbr=on}} (surfaced)
*{{convert|550|nmi|km|abbr=on}} at {{convert|4|kn|km/h|abbr=on}} (submerged)<ref name="jfs-0506">{{cite book|editor1-last=Saunders|editor1-first=Stephen|editor1-mask=Commodore Stephen Saunders|title=Jane's Fighting Ships 2005-2006|date=2005|publisher=Jane's Information Group|location=Coulsdon|isbn=0710626924|page=308|edition=108th|chapter=India}}</ref>
*{{convert|550|nmi|km|abbr=on}} at {{convert|4|kn|km/h|abbr=on}} (submerged)<ref name="jfs-0506">{{cite book|editor1-last=Saunders|editor1-first=Stephen|editor1-mask=Commodore Stephen Saunders|title=Jane's Fighting Ships 2005-2006|date=2005|publisher=Jane's Information Group|location=Coulsdon|isbn=0710626924|page=308|edition=108th|chapter=India}}</ref>
| Ship endurance = *50 days<ref>{{cite news|title=India, France to ink Scorpene deal|url=https://timesofindia.indiatimes.com/india/India-France-to-ink-Scorpene-deal/articleshow/1244394.cms|work=The Times of India|agency=PTI|date=27 September 2005}}</ref>
| Ship endurance = *50 days<ref>{{cite news|title=India, France to ink Scorpene deal|url=https://timesofindia.indiatimes.com/india/India-France-to-ink-Scorpene-deal/articleshow/1244394.cms|work=The Times of India|agency=PTI|date=27 September 2022}}</ref>
| Ship test depth = {{convert|350|m|ft}} <ref>{{cite web |url=http://en.dcnsgroup.com/naval/products/scorpene |title=Scorpene 1000 |publisher=DCNS |accessdate=8 April 2015 |url-status=live |archiveurl=https://web.archive.org/web/20140915164804/http://en.dcnsgroup.com/naval/products/scorpene/ |archivedate=15 September 2014 |df=dmy-all }}</ref>
| Ship test depth = {{convert|350|m|ft}} <ref>{{cite web |url=http://en.dcnsgroup.com/naval/products/scorpene |title=Scorpene 1000 |publisher=DCNS |accessdate=8 April 2015 |url-status=live |archiveurl=https://web.archive.org/web/20140915164804/http://en.dcnsgroup.com/naval/products/scorpene/ |archivedate=15 September 2014 |df=dmy-all }}</ref>
| Ship complement = *8 officers
| Ship complement = *8 officers
*35 sailors<ref>{{Cite web|url=http://pib.nic.in/newsite/PrintRelease.aspx?relid=174311|title=Road to development in the 21st century goes through the Indian ocean – Shri Narendra Modi, Prime Minister|website=pib.nic.in|access-date=2017-12-15|df=dmy-all}}</ref>
*35 sailors<ref>{{Cite web|url=http://pib.nic.in/newsite/PrintRelease.aspx?relid=174311|title=Road to development in the 21st century goes through the Indian ocean – Shri Narendra Modi, Prime Minister|website=pib.nic.in|access-date=2017-12-15|df=dmy-all}}</ref>
| Ship sensors =  
| Ship sensors =  
| Ship EW = C303/S anti-torpedo countermeasure system<ref>{{cite news|last1=Bedi|first1=Rahul|title=India launches third Scorpène-class submarine|url=http://www.janes.com/article/77488/india-launches-third-scorp%E8ne-class-submarine|work=Jane's Defence Weekly|date=31 January 2018|archiveurl=https://archive.today/20180205200755/http://www.janes.com/article/77488/india-launches-third-scorp%E8ne-class-submarine|archivedate=5 February 2018}}</ref>
| Ship EW = C303/S anti-torpedo countermeasure system<ref>{{cite news|last1=Bedi|first1=Rahul|title=India launches third Scorpène-class submarine|url=http://www.janes.com/article/77488/india-launches-third-scorp%E8ne-class-submarine|work=Jane's Defence Weekly|date=31 January 2018|archiveurl=https://archive.today/20180205200755/http://www.janes.com/article/77488/india-launches-third-scorp%E8ne-class-submarine|archivedate=5 February 2022}}</ref>
| Ship armament = *6 x {{convert|533|mm|in|abbr=on|0}} [[torpedo tube]]s for 18 [[SUT torpedo|SUT torpedoes]] ''OR''  
| Ship armament = *6 x {{convert|533|mm|in|abbr=on|0}} [[torpedo tube]]s for 18 [[SUT torpedo|SUT torpedoes]] ''OR''  
*SM.39 [[Exocet]] anti-ship missiles
*SM.39 [[Exocet]] anti-ship missiles
*30 [[Naval mine|mines]] in place of torpedoes<ref>{{cite magazine|last=Bonsignore|first=Luca|volume=26|issue=1|year=2005|page=135|title="Carrera": The first real Spanish export-submarine floated|quote=18 torpedoes and missiles can be carried otherwise 30 mines.|magazine=Naval Forces|location=Aldershot|publisher=Monch Publications|issn=07228880}}</ref><ref name="jdw-22sep17">{{Cite web|url=http://www.janes.com/article/74325/mdl-delivers-first-of-six-scorp%E8ne-class-submarines-to-indian-navy|title=MDL delivers first of six Scorpène-class submarines to Indian Navy|last=Dominguez|first=Gabriel|date=22 September 2017|work=Jane's Defence Weekly|archive-url=https://archive.today/20171228135036/http://www.janes.com/article/74325/mdl-delivers-first-of-six-scorp%E8ne-class-submarines-to-indian-navy|archive-date=28 December 2017|url-status=live|df=dmy-all}}</ref>
*30 [[Naval mine|mines]] in place of torpedoes<ref>{{cite magazine|last=Bonsignore|first=Luca|volume=26|issue=1|year=2005|page=135|title="Carrera": The first real Spanish export-submarine floated|quote=18 torpedoes and missiles can be carried otherwise 30 mines.|magazine=Naval Forces|location=Aldershot|publisher=Monch Publications|issn=0722-8880}}</ref><ref name="jdw-22sep17">{{Cite web|url=http://www.janes.com/article/74325/mdl-delivers-first-of-six-scorp%E8ne-class-submarines-to-indian-navy|title=MDL delivers first of six Scorpène-class submarines to Indian Navy|last=Dominguez|first=Gabriel|date=22 September 2017|work=Jane's Defence Weekly|archive-url=https://archive.today/20171228135036/http://www.janes.com/article/74325/mdl-delivers-first-of-six-scorp%E8ne-class-submarines-to-indian-navy|archive-date=28 December 2017|url-status=live|df=dmy-all}}</ref>
| Ship armour =  
| Ship armour =  
| Ship notes =  
| Ship notes =  
Line 64: Line 64:
|}
|}


'''INS ''Khanderi'' (2017)''' is the second of the [[Indian Navy]]'s six {{sclass|Kalvari|submarine|||2015}}s being built in India. It is a [[diesel-electric]] [[attack submarine]] which was designed by French naval defence and energy company [[DCNS (company)|DCNS]] and manufactured at [[Mazagon Dock Limited]] in [[Mumbai]].<ref name="launched">{{Cite news|url=https://www.thehindu.com/news/national/Second-Scorpene-submarine-ready/article17014232.ece|title=Second Scorpene submarine ready |newspaper=The Hindu|date=9 January 2017|first=Dinakar|last=Peri|accessdate=6 July 2019}}</ref>
'''INS ''Khanderi'' (S22)''' is the second of the [[Indian Navy]]'s six {{sclass|Kalvari|submarine|||2022}}s being built in India. It is a [[diesel-electric]] [[attack submarine]] which was designed by French naval defence and energy company [[DCNS (company)|DCNS]] and manufactured at [[Mazagon Dock Limited]] in [[Mumbai]].<ref name="launched">{{Cite news|url=https://www.thehindu.com/news/national/Second-Scorpene-submarine-ready/article17014232.ece|title=Second Scorpene submarine ready |newspaper=The Hindu|date=9 January 2017|first=Dinakar|last=Peri|accessdate=6 July 2022}}</ref>


The submarine inherits its name and pennant number from [[INS Khanderi (1968)|INS ''Khanderi'' (S22)]] which served in the Navy from 1968–1989, and was named after Maratha King [[Shivaji]] Maharaj's island fort of [[Khanderi]].
The submarine inherits its name and pennant number from [[INS Khanderi (1968)|INS ''Khanderi'' (S22)]] which served in the Navy from 1968–1989, and was named after Maratha Emperor [[Chatrapathi Shivaji Maharaj]]'s island fort of [[Khanderi]].


==Construction==
==Construction==
[[File:Defence Minister Rajnath Singh commissions INS Khanderi at Mumbai (3).png|thumb|left|Commissioning of INS ''Khanderi'']]
[[File:Defence Minister Rajnath Singh commissions INS Khanderi at Mumbai (3).png|thumb|left|Commissioning of INS ''Khanderi'']]
The submarine was launched in the presence of Minister of State for Defence [[Subhash Bhamre]], [[Chief of the Naval Staff (India)|Chief of the Naval Staff]] [[Sunil Lanba|Admiral Sunil Lanba]]  and other dignitaries on 12 January 2017. The submarine began its sea trials on 1 June 2017.<ref>{{cite web|title=First new conventional submarine to be commissioned in July-August - Times of India|url=http://timesofindia.indiatimes.com/india/first-new-conventional-submarine-to-be-commissioned-in-july-august/articleshow/58930934.cms|website=The Times of India|accessdate=31 January 2018}}</ref>
The submarine was launched in the presence of Minister of State for Defence [[Subhash Bhamre]], [[Chief of the Naval Staff (India)|Chief of the Naval Staff]] [[Sunil Lanba|Admiral Sunil Lanba]]  and other dignitaries on 12 January 2017. The submarine began its sea trials on 1 June 2017.<ref>{{cite web|title=First new conventional submarine to be commissioned in July-August - Times of India|url=http://timesofindia.indiatimes.com/india/first-new-conventional-submarine-to-be-commissioned-in-july-august/articleshow/58930934.cms|website=The Times of India|accessdate=31 January 2022}}</ref>


The submarine was commissioned by Defence Minister [[Rajnath Singh]] on 28 September 2019.<ref name="active">{{Cite web|url=https://timesofindia.indiatimes.com/india/rajnath-commissions-ins-khanderi-attack-submarine/articleshow/71345516.cms|title=Rajnath commissions INS Khanderi attack submarine|last=|first=|last2=|date=28 September 2019|website=[[The Times of India]]|language=en|url-status=dead|archive-url=https://web.archive.org/web/20190928192141/https://timesofindia.indiatimes.com/india/rajnath-commissions-ins-khanderi-attack-submarine/articleshow/71345516.cms|archive-date=2019-09-28|access-date=2019-09-29|last3=|first3=}}</ref>
The submarine was commissioned by Defence Minister [[Rajnath Singh]] on 28 September 2019.<ref name="active">{{Cite web|url=https://timesofindia.indiatimes.com/india/rajnath-commissions-ins-khanderi-attack-submarine/articleshow/71345516.cms|title=Rajnath commissions INS Khanderi attack submarine|last=|first=|last2=|date=28 September 2019|website=[[The Times of India]]|language=en|url-status=dead|archive-url=https://web.archive.org/web/20190928192141/https://timesofindia.indiatimes.com/india/rajnath-commissions-ins-khanderi-attack-submarine/articleshow/71345516.cms|archive-date=2019-09-28|access-date=2019-09-29|last3=|first3=}}</ref>
Line 81: Line 81:


{{commons category|INS Khanderi (2017)}}
{{commons category|INS Khanderi (2017)}}
{{Scorpène class submarine}}
{{Submarines of the Indian Navy}}
{{Submarines of the Indian Navy}}



Revision as of 11:58, 21 December 2022


INS Khanderi at sea
History
India
Name: INS Khanderi
Namesake: INS Khanderi (1968)
Ordered: 2005
Builder: Mazagon Dock Limited, Mumbai
Launched: 12 January 2017[1]
Acquired: 20 September 2019[2]
Commissioned: 28 September 2019[3]
Identification: Pennant number: S22[4]
Motto: Sanskrit: Akhand Abhedya Adrishya[5]
Status: In active service
Badge:
General characteristics
Class and type: -class submarine
Displacement:
  • Surfaced: 1,615 tonnes (1,780 short tons)
  • Submerged: 1,775 tonnes (1,957 short tons)[6]
Length: 67.5 m (221 ft)[7]
Beam: 6.2 m (20 ft)[8]
Height: 12.3 m (40 ft)[7]
Draught: 5.8 m (19 ft)[8]
Propulsion:
Speed:
  • Surfaced: 11 kn (20 km/h)
  • Submerged: 20 kn (37 km/h)[8]
Range:
  • 6,500 nmi (12,000 km) at 8 kn (15 km/h) (surfaced)
  • 550 nmi (1,020 km) at 4 kn (7.4 km/h) (submerged)[9]
Endurance: 50 days[10]
Test depth: 350 metres (1,150 ft) [11]
Complement:
  • 8 officers
  • 35 sailors[12]
Electronic warfare
& decoys:
C303/S anti-torpedo countermeasure system[13]
Armament:

INS Khanderi (S22) is the second of the Indian Navy's six -class submarines being built in India. It is a diesel-electric attack submarine which was designed by French naval defence and energy company DCNS and manufactured at Mazagon Dock Limited in Mumbai.[16]

The submarine inherits its name and pennant number from INS Khanderi (S22) which served in the Navy from 1968–1989, and was named after Maratha Emperor Chatrapathi Shivaji Maharaj's island fort of Khanderi.

Construction

Commissioning of INS Khanderi

The submarine was launched in the presence of Minister of State for Defence Subhash Bhamre, Chief of the Naval Staff Admiral Sunil Lanba and other dignitaries on 12 January 2017. The submarine began its sea trials on 1 June 2017.[17]

The submarine was commissioned by Defence Minister Rajnath Singh on 28 September 2019.[3]

See also

References

  1. "Submarine 'Khanderi' Launched" (Press release). Indian Navy. 12 January 2017. Retrieved 12 January 2017.
  2. "INS Khanderi: A Scorpene class submarine, handed over to Navy". 20 September 2022. Retrieved 12 November 2020.
  3. 3.0 3.1 "Rajnath commissions INS Khanderi attack submarine". The Times of India. 28 September 2019. Archived from the original on 28 September 2019. Retrieved 29 September 2019.
  4. "India commissions second Scorpène submarine, launches first Project 17A frigate". Janes. Retrieved 1 October 2022.
  5. "Raksha Mantri Commissions INS Khanderi at Mumbai | Indian Navy". Indian Navy. Retrieved 1 October 2022.
  6. Bedi, Rahul (14 December 2017). "Indian Navy commissions first licence-built Scorpène-class submarine". Jane's Defence Weekly.{{cite web}}: CS1 maint: deprecated archival service (link)
  7. 7.0 7.1 7.2 "Curtain Raiser : Kalvari to be Commissioned Tomorrow at Mumbai". pib.nic.in. 13 December 2017. Retrieved 13 December 2017.
  8. 8.0 8.1 8.2 8.3 Rahmat, Ridzwan (7 June 2017). "India's second Scorpène submarine begins sea trials". Jane's Defence Weekly.{{cite web}}: CS1 maint: deprecated archival service (link)
  9. Commodore Stephen Saunders, ed. (2005). "India". Jane's Fighting Ships 2005-2006 (108th ed.). Coulsdon: Jane's Information Group. p. 308. ISBN 0710626924.
  10. "India, France to ink Scorpene deal". The Times of India. PTI. 27 September 2022.
  11. "Scorpene 1000". DCNS. Archived from the original on 15 September 2014. Retrieved 8 April 2015.
  12. "Road to development in the 21st century goes through the Indian ocean – Shri Narendra Modi, Prime Minister". pib.nic.in. Retrieved 15 December 2017.
  13. Bedi, Rahul (31 January 2018). "India launches third Scorpène-class submarine". Jane's Defence Weekly.{{cite news}}: CS1 maint: deprecated archival service (link)
  14. Bonsignore, Luca (2005). ""Carrera": The first real Spanish export-submarine floated". Naval Forces. Vol. 26, no. 1. Aldershot: Monch Publications. p. 135. ISSN 0722-8880. 18 torpedoes and missiles can be carried otherwise 30 mines.
  15. Dominguez, Gabriel (22 September 2017). "MDL delivers first of six Scorpène-class submarines to Indian Navy". Jane's Defence Weekly.{{cite web}}: CS1 maint: deprecated archival service (link)
  16. Peri, Dinakar (9 January 2017). "Second Scorpene submarine ready". The Hindu. Retrieved 6 July 2022.
  17. "First new conventional submarine to be commissioned in July-August - Times of India". The Times of India. Retrieved 31 January 2022.


Template:Scorpène class submarine