'''Kakatiya Thermal Power Station''' is located near  Chelpur village of [[Bhupalpalle]] mandal in [[Warangal]] district of  the Indian state of [[Telangana]]. The power plant is one of the [[Fossil fuel power station|coal based power plants]] of [[Telangana Power Generation Corporation|TSGENCO]]
'''Kakatiya Thermal Power Station''' is located near  Chelpur village of [[Ghanpur, Warangal district|Ghanpur]] mandal in [[Warangal district]] of  the Indian state of [[Telangana]]. The power plant is one of the [[Fossil fuel power station|coal based power plants]] of [[Telangana Power Generation Corporation|TSGENCO]]


==Plant==
==Plant==
This power plant was developed in 2 stages. The first stage comprised one 500MW unit. The unit was synchronized to grid with oil firing on 31.03.2010 at 06:08 hrs. Coal firing was immediately taken up and the load was raised up to 84 MW and the unit was in service with this load for about 1 hour.<ref>{{cite web|url=http://www.cea.nic.in/power_sec_reports/Executive_Summary/2010_05/8.pdf|title=Kakatiya Thermal Power Station|publisher=Central Electricity Authority.|access-date=26 August 2010|archive-url=https://web.archive.org/web/20100926024825/http://cea.nic.in/power_sec_reports/Executive_Summary/2010_05/8.pdf|archive-date=26 September 2010|url-status=dead}}</ref>
This power plant was developed in 2 stages. The first stage comprised one 500MW unit. The unit was synchronized to grid with oil firing on 31.03.2010 at 06:08 hrs. Coal firing was immediately taken up and the load was raised up to 84 MW and the unit was in service with this load for about 1 hour.<ref>{{cite web|url=http://www.cea.nic.in/power_sec_reports/Executive_Summary/2010_05/8.pdf|title=Kakatiya Thermal Power Station|publisher=Central Electricity Authority.|access-date=26 August 2010|archive-url=https://web.archive.org/web/20100926024825/http://cea.nic.in/power_sec_reports/Executive_Summary/2010_05/8.pdf|archive-date=26 September 2010|url-status=dead}}</ref>


Kakatiya TPP Unit-II 1X600MW, was synchronized to the grid at 03:00 hrs. on 22-10-2015 and loaded to 105 MW.
Kakatiya TPP Unit-II 1X600MW, was synchronized to the grid at 03:00 hrs. on 22 October 2015 and loaded to 105 MW.


==Capacity==
==Capacity==
Line 59: Line 59:


[[Category:Coal-fired power stations in Telangana]]
[[Category:Coal-fired power stations in Telangana]]
[[Category:Warangal Urban district]]
[[Category:Hanamkonda district]]
[[Category:2010 establishments in Andhra Pradesh]]
[[Category:2010 establishments in Andhra Pradesh]]




{{India-powerstation-stub}}
{{India-powerstation-stub}}

Revision as of 19:36, 28 August 2021

Kakatiya Thermal Power Project at Bhupalpalle
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).
Official nameKTPP
LocationGhanpur, Warangal district, Telangana
Coordinates18°23′15″N 79°50′22″E / 18.38750°N 79.83944°E / 18.38750; 79.83944
StatusOperational
Commission dateUnit 1: February 2009
'Under implementation'
Unit 2: 2013
Operator(s)Telangana Power Generation Corporation Limited (TSGENCO)
Thermal power station
Primary fuelCoal
Power generation
Script error: No such module "Infobox power station".
Nameplate capacity500 MW
'Under implementation'
600 MW

Kakatiya Thermal Power Station is located near Chelpur village of Ghanpur mandal in Warangal district of the Indian state of Telangana. The power plant is one of the coal based power plants of TSGENCO

Plant

This power plant was developed in 2 stages. The first stage comprised one 500MW unit. The unit was synchronized to grid with oil firing on 31.03.2010 at 06:08 hrs. Coal firing was immediately taken up and the load was raised up to 84 MW and the unit was in service with this load for about 1 hour.[1]

Kakatiya TPP Unit-II 1X600MW, was synchronized to the grid at 03:00 hrs. on 22 October 2015 and loaded to 105 MW.

Capacity

Stage Unit Number Installed Capacity (MW) Date of Commissioning Status
Stage I 1 500 May, 2010 Running
Stage II 2 600 Jan, 2016 Running

[2]

See also

References

  1. "Kakatiya Thermal Power Station" (PDF). Central Electricity Authority. Archived from the original (PDF) on 26 September 2010. Retrieved 26 August 2010.
  2. "BHEL commissions 600 MW Thermal Unit in Telangana | Central Chronicle". www.centralchronicle.com. Archived from the original on 25 April 2018. Retrieved 30 May 2017.