>Derekbridges fix sclass |
|||
| Line 33: | Line 33: | ||
|Hide header= | |Hide header= | ||
|Header caption= | |Header caption= | ||
|Ship class= {{sclass | |Ship class= {{sclass|Nilgiri|frigate|||1972}} | ||
|Ship type= | |Ship type= | ||
|Ship displacement=*2682 tons (standard) | |Ship displacement=*2682 tons (standard) | ||
| Line 67: | Line 67: | ||
'''INS ''Nilgiri'' (F33)''' was the lead ship of [[Nilgiri-class frigate (1972)|her class]] of [[frigate]]s. Commissioned on 3 June 1972 into the [[Indian Navy]], she was decommissioned in 1996. | '''INS ''Nilgiri'' (F33)''' was the lead ship of [[Nilgiri-class frigate (1972)|her class]] of [[frigate]]s. Commissioned on 3 June 1972 into the [[Indian Navy]], she was decommissioned in 1996. | ||
INS ''Nilgiri'' was the first major warship built in India keel up. | INS ''Nilgiri'' was the first major warship built in India keel up, with a displacement ~20x that of an Ajay class patrol vessel. INS Nilgiri was built at Mazagon Docks Limited, [[Mumbai]] in collaboration with Yarrow Shipbuilders, [[Glasgow]]. The collaboration involved designs of the [[Royal Navy]]'s improved Type 12 general purpose [[frigate]] and technical and training support for construction of 6 vessels. The project to build ''Nilgiri'' was led by Homi Sethna and Commander (later Rear Admiral) Prakash N Gour. The success of ''Nilgiri'' led to the Indian Navy along with Mazagon Docks redesigning the last two ships of the class – {{INS|Vindhyagiri}} and {{INS|Taragiri}} to add the [[Westland Sea King|Sea King]] helicopter, ILAS 324 mm torpedo tubes and Bofors ASW rocket launcher. | ||
The ship was fitted with the Agouti system to minimize | The ship was fitted with the Agouti system to minimize propeller [[cavitation]] noise.<ref>{{cite book|url=https://books.google.com/books?id=zFyMKROi46kC&pg=PA281|title=Transition to Triumph: History of the Indian Navy, 1965–1975|first=G. M.|last=Hiranandani|date=2000|publisher=Lancer Publishers|isbn=9781897829721}}</ref> | ||
==Decommissioning== | ==Decommissioning== | ||
| Line 78: | Line 78: | ||
{{Leander class frigate}} | {{Leander class frigate}} | ||
{{ | |||
{{Frigates of the Indian Navy}} | |||
{{DEFAULTSORT:Nilgiri (F33)}} | {{DEFAULTSORT:Nilgiri (F33)}} | ||
[[Category:Nilgiri-class frigates]] | [[Category:Nilgiri-class frigates]] | ||
| Line 85: | Line 86: | ||
[[Category:1968 ships]] | [[Category:1968 ships]] | ||
[[Category:Frigates of the Cold War]] | [[Category:Frigates of the Cold War]] | ||
{{mil-ship-stub}} | {{mil-ship-stub}} | ||
{{India-mil-stub}} | {{India-mil-stub}} | ||
Revision as of 15:12, 4 October 2021
This article needs additional citations for verification. (August 2010) |
| File:INS Nilgiri 1968 stamp of India.jpg Nilgiri on a 1968 stamp of India
| |
| History | |
|---|---|
| Error creating thumbnail: File missingIndia | |
| Name: | INS Nilgiri |
| Namesake: | Nilgiri Hills |
| Ordered: | 1964 |
| Builder: | Mazagon Docks Ltd, Mumbai |
| Laid down: | October 1966 |
| Launched: | October 1968 |
| Commissioned: | 3 June 1972 |
| Decommissioned: | 1996 |
| Fate: | Sunk in a Sea Eagle AShM test from a carrier-launched Sea Harrier in 1997 |
| General characteristics | |
| Class and type: | -class frigate |
| Displacement: |
|
| Length: | 113 m (371 ft) |
| Beam: | 13 m (43 ft) |
| Draught: | 4.3 m (14 ft) |
| Propulsion: |
|
| Speed: | 28 knots (52 km/h; 32 mph) |
| Range: | 4,000 nmi (7,400 km; 4,600 mi) at 12 kn (22 km/h; 14 mph) |
| Complement: | 267 (incl 17 officers)[1] |
| Sensors and processing systems: |
|
| Armament: |
|
| Aircraft carried: | 1 HAL Chetak |
INS Nilgiri (F33) was the lead ship of her class of frigates. Commissioned on 3 June 1972 into the Indian Navy, she was decommissioned in 1996.
INS Nilgiri was the first major warship built in India keel up, with a displacement ~20x that of an Ajay class patrol vessel. INS Nilgiri was built at Mazagon Docks Limited, Mumbai in collaboration with Yarrow Shipbuilders, Glasgow. The collaboration involved designs of the Royal Navy's improved Type 12 general purpose frigate and technical and training support for construction of 6 vessels. The project to build Nilgiri was led by Homi Sethna and Commander (later Rear Admiral) Prakash N Gour. The success of Nilgiri led to the Indian Navy along with Mazagon Docks redesigning the last two ships of the class – INS Vindhyagiri and INS Taragiri to add the Sea King helicopter, ILAS 324 mm torpedo tubes and Bofors ASW rocket launcher.
The ship was fitted with the Agouti system to minimize propeller cavitation noise.[2]
Decommissioning
INS Nilgiri was decommissioned in 1996. She was sunk on 24 April 1997, in a test firing of a Sea Eagle anti-ship missile by a Sea Harrier Frs Mk.51 taking off from the aircraft carrier INS Viraat.
References
- ↑ "GIRI CLASS (Himgiri, Dunagiri, Taragiri, Udaygiri, Vindhyagiri)". indiannavy.nic.in. Archived from the original on 15 February 2008. Retrieved 1 February 2011.
- ↑ Hiranandani, G. M. (2000). Transition to Triumph: History of the Indian Navy, 1965–1975. Lancer Publishers. ISBN 9781897829721.