Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.
Thank you for being part of the Bharatpedia family! 0% transparency: ₹0 raised out of ₹100,000 (0 supporter) |
Teesta Low Dam - IV | |
---|---|
Official name | Teesta Low Dam - IV Hydropower Plant |
Country | India |
Location | Kalimpong district, West Bengal |
Coordinates | 26°56′02″N 88°26′49″E / 26.9339354°N 88.4470021°ECoordinates: 26°56′02″N 88°26′49″E / 26.9339354°N 88.4470021°E |
Purpose | Power |
Status | Operational |
Opening date | 2016 |
Owner(s) | NHPC |
Dam and spillways | |
Impounds | Teesta River |
Height | 54 m (177 ft) |
Length | 530 m (1,739 ft) |
Power Station | |
Commission date | 2016[1] |
Type | Run-of-the-river |
Hydraulic head | 25.05 m (82 ft) (gross) |
Turbines | 4 X 40 MW |
Installed capacity | 160 MW[1] |
Annual generation | 720 MU[1] |
Teesta Low Dam - IV Hydropower Plant[2] is a run-of-the-river hydroelectric station built on the Teesta River.
Geography[edit]
Places in the Kalimpong Sadar subdivision in Kalimpong district CT: census town, R: rural/ urban centre, M: municipality, F: facility, NP: national park Abbreviations used in names – TG for Tea Garden (town/village) Owing to space constraints in the small map, the actual locations in a larger map may vary slightly |
Location[edit]
It is located in Kalimpong district, West Bengal, about 350 meters above the confluence of the Kalijora river Teesta River and in the 1.5 kilometer kiln of Teesta Bridge near Teesta Bazar village. 18.3 km downstream from the Teesta bridge near at Tista Bazar village. It is near Kalijhora.
The project[edit]
The project consists of a 45 m high dam with 4 penstocks of 45 m length and 7 m diameter each. The surface powerhouse with installed capacity of 160 MW houses 4 units of 40 MW capacity each designed to operate under the net rated head of 25.05 M and designed to generate 720 million units in a 90% dependable year with 95% machine availability. Unit I, II, III and IV were commissioned in the month of February, March, July and August 2016[1][3] respectively. The state of West Bengal is the sole beneficiary of this power station. With the construction of the project the area is also benefited by development infrastructure, education, medical facilities and employment avenues.
References[edit]
- ↑ 1.0 1.1 1.2 1.3 "NHPC completes Teesta Low Dam-IV hydro project". 19 August 2016. Retrieved 31 January 2020.
- ↑ "Teesta Low Dam - IV". nhpcindia.com. Retrieved 31 January 2020.
- ↑ "BHEL starts 40-mw hydro power unit in West Bengal". The Economic Times. Retrieved 31 January 2020.