Varkala Tunnel, Trivandrum
Former Chief minister VS Achudhananthan visiting Varkala Tunnel in 2006
Script error: The function "infobox_pushpin_map" does not exist.
Lua error in package.lua at line 80: module 'Module:Infobox dim' not found.
Overview
LocationVarkala, Trivandrum, Kerala
Coordinates8°44′11″N 76°43′48″E / 8.7365°N 76.730°E / 8.7365; 76.730
StatusClosed 2007; 19 years ago (2007)
RouteTrivandrum–Kollam
Start8°44′11″N 76°43′48″E / 8.7365°N 76.730°E / 8.7365; 76.730
End8°43′00″N 76°43′16″E / 8.7167°N 76.721°E / 8.7167; 76.721
Operation
Opened1877; 149 years ago (1877)
OwnerGovernment of Kerala
OperatorKerala Inland Waterways and Infrastructure Limited
TrafficNational Waterway 3
TollNo
Technical
Length1,069.848 m (0.664773 mi)
No. of lanes2
Operating speed
25 km/h (16 mph)
Tunnel clearance
10 metres (33 ft)
Width10

History[edit | edit source]

The Varkala Tunnel is a 19th-century canal tunnel system in Varkala, Trivandrum, Kerala, India. Constructed between 1867 and 1877 under the Kingdom of Travancore, it connected southern and northern waterways and supported inland trade. The tunnel was built under Dewan Sir T. Madhava Rao, with Chief Engineer Walthew Clarence Barton overseeing construction.

The twin tunnels, at Sivagiri (722 m) and Chilakkoor (350 m), enabled the transport of goods such as coir, rice, and cashew for nearly a century. By the mid-20th century, the rise of roads and railways led to disuse, and the tunnel was officially closed in 2007 due to siltation and encroachments.

Technical specifications[edit | edit source]

  • Length: 1,069.848 metres (0.664 mi)
  • Width: 10 metres (33 ft)
  • Height/Clearance: 10 metres (33 ft)
  • Number of lanes: 2
  • Operating speed: 25 km/h (16 mph)
  • Traffic: Part of National Waterway 3

Modern revival[edit | edit source]

The tunnel is part of the West Coast Canal (WCC) Project, managed by Kerala Waterways and Infrastructure Limited (KWIL). Restoration work includes dredging, structural reinforcement, and preparation for safe navigation. The project aims to integrate the tunnel into heritage tourism and eco-friendly inland waterway transport.

Key milestones[edit | edit source]

  • 2017 – KWIL incorporated for WCC project
  • 2020 – Initial dredging and de-silting at Varkala
  • 2023 – Structural certification of the tunnels by Konkan Railway Corporation
  • 2025 – Scheduled commissioning of Akkulam–Chettuva stretch, including Varkala Tunnel

Social rehabilitation under the Punargeham scheme has relocated over 400 families with financial packages exceeding ₹240 crore.

Tourism and cultural significance[edit | edit source]

The tunnel’s reopening will feature electric vessels offering zero-emission rides and light-and-sound shows narrating local history and heritage. The project is part of the Varkala Destination Development Master Plan, which aims to diversify tourism in the region beyond beaches, including canal cruises, walkways, and hospitality investments.