292
edits
Hexatron93 (talk | contribs) No edit summary |
Hexatron93 (talk | contribs) (→Brief) |
||
| Line 4: | Line 4: | ||
Expansion of existing Salav jetty facility from present 235 m jetty length and 21 m mooring dolphin by adding additional jetty length of 500 m to handle cargoes from present 3.0 MPTA to 31.0 MPTA.<ref>https://environmentclearance.nic.in/writereaddata/Online/EDS/01_Apr_2017_1141463105I7UNU3UFormIJSWSalavPort.pdf</ref> | Expansion of existing Salav jetty facility from present 235 m jetty length and 21 m mooring dolphin by adding additional jetty length of 500 m to handle cargoes from present 3.0 MPTA to 31.0 MPTA.<ref>https://environmentclearance.nic.in/writereaddata/Online/EDS/01_Apr_2017_1141463105I7UNU3UFormIJSWSalavPort.pdf</ref> | ||
A special SPV named JSW Salav Port Limited has been operating the port | A special SPV named JSW Salav Port Limited(a part of JSW Infrastructure) has been operating the port | ||
==Salav Steel Plant== | ==Salav Steel Plant== | ||
edits