{{Use dmy dates|date=August 2022}}
{{Use dmy dates|date=August 2015}}
{{Use Indian English|date=August 2022}}
{{Use Indian English|date=August 2015}}


{{more citations needed|date=May 2022}}
{{more citations needed|date=May 2010}}
{|{{Infobox ship begin}}
{|{{Infobox ship begin}}
{{Infobox ship image
{{Infobox ship image
Line 95: Line 95:
In 1986, the Cabinet Committee on Political Affairs (CCPA) decided to diversify India's warship building capability, and start an alternate production line to the ''Godavari''-class frigates that were built at [[Mazagon Dock Limited]] (MDL) in [[Bombay]]. 3 additional ''Godavari''-class frigates were to be built at [[Garden Reach Shipbuilders and Engineers]] (GRSE) in [[Calcutta]]. After a transfer of technology from MDL to GRSE, production was to start in 1988, with deliveries between 1993 and 1996.
In 1986, the Cabinet Committee on Political Affairs (CCPA) decided to diversify India's warship building capability, and start an alternate production line to the ''Godavari''-class frigates that were built at [[Mazagon Dock Limited]] (MDL) in [[Bombay]]. 3 additional ''Godavari''-class frigates were to be built at [[Garden Reach Shipbuilders and Engineers]] (GRSE) in [[Calcutta]]. After a transfer of technology from MDL to GRSE, production was to start in 1988, with deliveries between 1993 and 1996.


However, as the production was about to commence, the [[Indian Navy]]'s requirements were revised, which led to frequent changes in the design. The re-designed ship, christened '''Project 16A''', had its General Arrangement Drawings finalized only in September 1994.<ref name="gs-project16a">{{cite web|url=http://www.globalsecurity.org/military/world/india/f-godavari.htm |title=F 20 Godavari Class |publisher=globalsecurity.net |date=9 July 2011 |access-date=26 September 2022}}</ref>
However, as the production was about to commence, the [[Indian Navy]]'s requirements were revised, which led to frequent changes in the design. The re-designed ship, christened '''Project 16A''', had its General Arrangement Drawings finalized only in September 1994.<ref name="gs-project16a">{{cite web|url=http://www.globalsecurity.org/military/world/india/f-godavari.htm |title=F 20 Godavari Class |publisher=globalsecurity.net |date=9 July 2011 |access-date=26 September 2014}}</ref>


On 5 December 2016, [[INS Betwa (F39)|INS ''Betwa'']] was undergoing a refit at Mumbai's naval dockyard when it tipped over during undocking.<ref>{{cite news|url=http://www.hindustantimes.com/mumbai-news/ins-betwa-slips-at-naval-dockyard/story-XZvwjQ1qKlTSeHMI83HUGM.html|title=INS Betwa slips at Naval dockyard|last=Presley|first=Thomas|location=Mumbai|publisher=[[Hindustan Times]]|date=5 December 2016|access-date=5 December 2022}}</ref> The salvage and repair of the ship will take approximately two years.<ref>{{Cite web|url=http://www.ndtv.com/india-news/navy-plans-to-salvage-rs-600-crore-ins-betwa-which-lies-on-its-side-flooded-1634772|title=Navy Plans to Salvage Rs 600 Crore INS Betwa Which Lies on Its Side Flooded}}</ref>
On 5 December 2016, [[INS Betwa (F39)|INS ''Betwa'']] was undergoing a refit at Mumbai's naval dockyard when it tipped over during undocking.<ref>{{cite news|url=http://www.hindustantimes.com/mumbai-news/ins-betwa-slips-at-naval-dockyard/story-XZvwjQ1qKlTSeHMI83HUGM.html|title=INS Betwa slips at Naval dockyard|last=Presley|first=Thomas|location=Mumbai|publisher=[[Hindustan Times]]|date=5 December 2016|access-date=5 December 2016}}</ref> The salvage and repair of the ship will take approximately two years.<ref>{{Cite web|url=http://www.ndtv.com/india-news/navy-plans-to-salvage-rs-600-crore-ins-betwa-which-lies-on-its-side-flooded-1634772|title=Navy Plans to Salvage Rs 600 Crore INS Betwa Which Lies on Its Side Flooded}}</ref>


==Design==
==Design==
Line 105: Line 105:


===Design===
===Design===
The vessels are designed for a crew of 350 (including 40 officers + 13 aircrew). The ships are propelled by 2 [[Bharat Heavy Electricals Limited|BHEL]] ''Bhopal'' {{convert|15000|bhp|lk=in}} [[steam turbine]]s.<ref name="pib-beas">{{cite web|url=http://pib.nic.in/release/release.asp?relid=10124 |title=INS BEAS joins the Indian Navy |publisher=Press Information Bureau, Government of India |date=11 July 2005 |access-date=26 September 2022}}</ref>
The vessels are designed for a crew of 350 (including 40 officers + 13 aircrew). The ships are propelled by 2 [[Bharat Heavy Electricals Limited|BHEL]] ''Bhopal'' {{convert|15000|bhp|lk=in}} [[steam turbine]]s.<ref name="pib-beas">{{cite web|url=http://pib.nic.in/release/release.asp?relid=10124 |title=INS BEAS joins the Indian Navy |publisher=Press Information Bureau, Government of India |date=11 July 2005 |access-date=26 September 2014}}</ref>


===Command and control===
===Command and control===