6
edits
->Citation bot (Add: title. Changed bare reference to CS1/2. | Use this bot. Report bugs. | Suggested by BrownHairedGirl | Linked from User:BrownHairedGirl/Articles_with_bare_links | #UCB_webform_linked 1366/1407) |
No edit summary |
||
Line 23: | Line 23: | ||
| autorack = | | autorack = | ||
| catering = On-board Catering <br> E-Catering | | catering = On-board Catering <br> E-Catering | ||
| observation = | | observation = LHB coaches | ||
| entertainment = No | | entertainment = No | ||
| baggage = No | | baggage = No | ||
| other facilities= Below the seats | | other facilities= Below the seats | ||
| stock = | | stock = 1 | ||
| gauge = {{RailGauge|1676mm|al=on|allk=on}} | | gauge = {{RailGauge|1676mm|al=on|allk=on}} | ||
| electrification = | | electrification = | ||
Line 40: | Line 40: | ||
== Service== | == Service== | ||
The 22355/Patliputra–Chandigarh Express has an average speed of 55 km/hr and covers 1153 km in | The 22355/Patliputra–Chandigarh Express has an average speed of 55 km/hr and covers 1153 km in 20hr 50mins. The 22356/Chandigarh - Patliputra Express covers the same distance at an average speed of 55 km/hr but in 21hr. | ||
== Route and halts == | == Route and halts == | ||
Line 67: | Line 67: | ||
==Coach composite== | ==Coach composite== | ||
The train has standard | The train has standard LHB rakes with max speed of 130 kmph. The train consists of 22 coaches : | ||
* 1 AC I | |||
* 1 AC I Tier Coach | |||
* 2 AC II Tier Coaches | * 2 AC II Tier Coaches | ||
* | * 6 AC III Tier Coaches | ||
* | * 6 Sleeper Coaches | ||
* 1 Pantry Car Coach | |||
* 5 General Coaches | * 5 General Coaches | ||
* | * 1 Luggage Brake and Generator Car | ||
== Traction== | == Traction== | ||
Line 82: | Line 84: | ||
==News== | ==News== | ||
The train | The train was selected under the 2nd phase of project Utkrisht by East Central Railway to boost the comfort level for the passengers.<ref>{{Cite web|url=https://m.dailyhunt.in/news/india/english/z+business-epaper-zbusnes/indian+railways+project+utkrisht+swanky+makeover+these+trains+may+soon+come+in+new+avatar+check+list-newsid-106362602|title = Indian Railways Project Utkrisht: Swanky makeover? These trains may soon come in new avatar - Check list - Z Business}}</ref> | ||
But now LHBfied for extreme comfort for the passengers. | |||
== See also == | == See also == |