Jump to content

National Infrastructure Pipeline: Difference between revisions

no edit summary
->Venkat TL
(Undid revision 1049709915 by DiplomatTesterMan (talk) deleted)
 
No edit summary
 
Line 1: Line 1:
{{Short description|Infrastructure project in India}}
{{Infobox
{{Infobox
| name    = National Infrastructure Pipeline (NIP)
| name    = National Infrastructure Pipeline (NIP)
Line 28: Line 29:
  |header3 =  
  |header3 =  
  | label3 = Sanctioned
  | label3 = Sanctioned
  |  data3 = ₹102 lakh crore<br /> (US$1.4 trillion)
  |  data3 = ₹1.97 lakh crore<br /> (US$1.4 trillion)
  |header4 =  
  |header4 =  
  | label4 = Total Capital Outlay<br /> (Dec 2020)
  | label4 = Total Capital Outlay<br /> (Dec 2020)
Line 34: Line 35:
  |header5 =  
  |header5 =  
  | label5 = Projects<br /> (Dec 2020)
  | label5 = Projects<br /> (Dec 2020)
  |  data5 = 7320
  |  data5 = 7400


  |belowstyle = background:#ddf;
  |belowstyle = background:#ddf;
Anonymous user