Jump to content

Project 75 Alpha: Difference between revisions

robot: Create/update articles. If there is a mistake please report on my talk page.
->Derekbridges
(fix sclass)
(robot: Create/update articles. If there is a mistake please report on my talk page.)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:
| In commission range = 2030s
| In commission range = 2030s
| Total ships building =  
| Total ships building =  
| Total ships planned = 3+3
| Total ships planned = 6
| Total ships completed =  
| Total ships completed =  
| Total ships active = 0
| Total ships active =
| Total ships laid up =  
| Total ships laid up =  
| Total ships lost =  
| Total ships lost =  
Line 29: Line 29:
| Header caption =  
| Header caption =  
| Ship type = [[Nuclear submarine|Nuclear powered]] [[attack submarine]] ([[SSN (hull classification symbol)|SSN]])
| Ship type = [[Nuclear submarine|Nuclear powered]] [[attack submarine]] ([[SSN (hull classification symbol)|SSN]])
| Ship displacement = {{cvt|6000|t}}
| Ship displacement =
| Ship length =  
| Ship length =  
| Ship beam =  
| Ship beam =  
Line 49: Line 49:
| Ship sensors =  
| Ship sensors =  
| Ship EW =  
| Ship EW =  
| Ship armament = [[Varunastra (torpedo)|Varunastra]] heavyweight torpedo, [[Nirbhay]] / [[BrahMos]] / [[BrahMos-II]] land/anti-ship cruise missiles
| Ship armament = [[Varunastra (torpedo)|Varunastra]] heavyweight [[torpedo]], [[Nirbhay]], [[BrahMos]] and [[BrahMos-II]] [[land-attack missile|land-attack]]/[[anti-ship missile|anti-ship]] [[cruise missiles]]
| Ship notes =  
| Ship notes =  
}}
}}
Line 85: Line 85:
[[Category:Nuclear-powered submarines]]
[[Category:Nuclear-powered submarines]]
[[Category:Submarine classes]]
[[Category:Submarine classes]]
[[Category:2020s ships]]
[[Category:Attack submarines]]
[[Category:Attack submarines]]
[[Category:Submarines of the Indian Navy]]
[[Category:Submarines of the Indian Navy]]