Jump to content

Navjeevan Express: Difference between revisions

103 bytes removed ,  10 September 2021
(Loco)
 
->Kousik2009
 
Line 74: Line 74:
== Coach composition and position ==
== Coach composition and position ==


The train has highly refurbished LHB rakes with max speed of 110 kmph. The train consists of 22 coaches. Coach position, when the train leaves from Chennai Central bound for Ahmedabad Junction.
The train has highly refurbished [[LHB coaches]] with max speed of 110 kmph. The train consists of 22 coaches. Coach position, when the train leaves from [[Chennai Central]] bound for [[Ahmedabad Junction]].


* 1 AC First cum AC Two Tier
* 1 AC First cum AC Two Tier
Line 107: Line 107:
| href="Kalyan railway station" |HA1
| href="Kalyan railway station" |HA1
| href="Vasai Road railway station" |UR
| href="Vasai Road railway station" |UR
| href="Surat railway station" |EOG
| href="Surat railway station" |HOG
|}
|}


Line 123: Line 123:
==Traction==
==Traction==


Both trains are hauled by a [[Electric Loco Shed, Bhusawal|Bhusawal]]-based [[Indian locomotive class WAP-4|WAP-4]] locomotive on its entire journey. It is hauled by a Pune based WDM 3D between Daund and Wadi.
This Train Hauls [[Royapuram]] Loco Shed WAP 7 HOG From [[Chennai Central]] To [[Ahmedabad]]


== References ==
== References ==
Anonymous user