Sasan Ultra Mega Power Project

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



Sasan Ultra Mega Power Plant
(Sasan UMPP)
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value).
CountryIndia
LocationSasan village, Singrauli district, Madhya Pradesh
Coordinates23°57′56″N 82°37′30″E / 23.96556°N 82.62500°E / 23.96556; 82.62500Coordinates: 23°57′56″N 82°37′30″E / 23.96556°N 82.62500°E / 23.96556; 82.62500
StatusActive
Commission date19 March 2015 (all 6 units)
Construction cost25,186 crores
Owner(s)Reliance Power Limited
Operator(s)Sasan Power Limited
Thermal power station
Primary fuelCoal
Power generation
Script error: No such module "Infobox power station".
Nameplate capacity3,960 MW
External links
Websitehttps://www.reliancepower.co.in

Sasan Ultra Mega Power Plant or Sasan UMPP is one of the four Ultra Mega Power Projects awarded by the Ministry of Power, Government of India.[1][2] It is located in Sasan village near Waidhan in Singrauli district of Madhya Pradesh. Sasan UMPP is India's largest integrated power generation and coal mine project with 3,960 MW power plant and 20 MT per year coal mining capacity. It is presently the 4th largest electricity generation power plant in India after NTPC Vindhyachal (4,760 MW), Mundra Thermal Power (4,620 MW) and Mundra UMPP (4,000 MW). The total project value of Sasan UMPP is 25,186 crores (₹251.86 Billion).

The plant is estimated to have been one of the ten most carbon polluting coal-fired power plants in the world in 2018, at 27.2 million tons of carbon dioxide, and relative emissions are estimated at 1.4 kg per kWh.[3]

History[edit]

The plant is operated by Sasan Power Limited (SPL), a subsidiary of Reliance Power Limited. SPL was incorporated on 10 February 2006. The Letter of Intent (LoI) was awarded to Reliance Power on 01 August 2007 and the Power purchase agreement (PPA) was signed on 07 August 2007. As of March 2020, it provides electricity to 13 million customers across 7 states of India. The Engineering, procurement and construction (EPC) contract was given to Reliance Infrastructure.

Coal Mines[edit]

The Sasan UMPP is a pit-head power project, which has been allocated 3 captive coal mine blocks: Moher, Moher-Amlohri extension and Chhatrasal in Singrauli, Madhya Pradesh. Reserves are in excess of 750 million tonnes. Together, the mines produce 20 million tonnes of coal each year, making it the largest integrated power plant and coal mines project in India.

Installed capacity[edit]

Following is the unit-wise capacity of the 3,960 MW plant. There are 6 units of 660 MW each.

Stage Unit Number Installed Capacity (MW) Date of Commissioning Status
Stage I 1 660 16 Aug 2013 Running[4]
Stage I 2 660 28 Jan 2014 Running[5]
Stage I 3 660 12 Apr 2014 Running[6]
Stage I 4 660 27 May 2014 Running[7]
Stage I 5 660 12 Dec 2014 Running[8]
Stage I 6 660 19 Mar 2015 Running[9]

Achievements[edit]

  • The plant achieved the highest Plant Load Factor (PLF) of 90.84% in 2015-16 in the first year of its full operation.[4]
  • The Plant achieved 94.78% PLF in 2018-19, the highest among thermal power plants in India.
  • The Plant achieved 95.85% PLF in 2019-20, the highest among thermal power plants in India.

Status updates[edit]

  • Aug 2007: Reliance Power awarded the contract for this project.
  • Mar 2015: All 6 units of Sasan UMPP became operational.

See also[edit]

References[edit]

  1. "About Ultra Mega Power Projects" (PDF). Ministry of Power, India. Retrieved 1 June 2021.
  2. "About Ultra Mega Power Projects". Power Finance Corporation. Retrieved 1 June 2021.
  3. Grant, Don; Zelinka, David; Mitova, Stefania (2021). "Reducing CO2 emissions by targeting the world's hyper-polluting power plants". Environmental Research Letters. doi:10.1088/1748-9326/ac13f1. ISSN 1748-9326.
  4. 4.0 4.1 "Detailed Status of awarded Ultra Mega Power Projects (UMPPs)" (PDF). Central Electricity Authority (CEA). 11 July 2019.
  5. "Reliance Power starts generation from Sasan UMPP second unit". Livemint.com. Retrieved 2014-03-19.
  6. "Reliance Power commissions third unit of Sasan UMPP". Business Standard. 24 March 2014. Retrieved 30 May 2018.
  7. "Reliance Power commissions fourth 660 MW unit of Sasan UMPP". Business Standard. 20 May 2014. Retrieved 30 May 2018.
  8. "Reliance Power commissions 5th unit of its Sasan UMPP". The Economic Times. 26 August 2014. Retrieved 30 May 2018.
  9. "Reliance Power's Sasan UMPP fully commissioned". The Economic Times. 30 March 2015. Retrieved 30 May 2018.

External links[edit]