Mainpuri–Etawah line
The Mainpuri–Etawah line is a railway line in northern India. It connects Mainpuri to Etawah Junction via Saifai.
Mainpuri–Etawah line | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Owner | Indian Railways | ||
Locale | Uttar Pradesh | ||
Termini | Etawah Junction (ETW) Mainpuri (MNQ) | ||
Stations | 7 | ||
Service | |||
System | Branch line | ||
Operator(s) | North Central Railway | ||
History | |||
Opened | 28 December 2016 | ||
Technical | |||
Line length | 55.16 km (34 mi) | ||
Track length | 1,676 mm (5 ft 6 in) | ||
Number of tracks | 1 | ||
Character | At Grade | ||
Track gauge | Broad gauge | ||
Electrification | No | ||
Operating speed | 100 km/h (62 mph) | ||
|
HistoryEdit
Foundation stone of this railway track was laid in 2004 by then-President of India Dr. A. P. J. Abdul Kalam in Saifai.[1]
On December 28, 2016 first time a passenger train (71910-Agra Cantonment – Mainpuri DEMU) run on this railway track.[2][3][4]
In 2019, Bharat Heavy Electricals Limited got the order for electrification of the track.[5]
Route and haltsEdit
Mainpuri – Etawah line | |||
---|---|---|---|
# | Station Name | Station Code | Connections |
1 | Etawah Junction | ETW | Howrah–Delhi main line |
2 | Baidpur | BPUR | |
3 | Saifai | SIPI | |
4 | Karhal | KAHL | |
5 | Bhujia | BUJA | |
6 | Kiratpur | KAPU | |
7 | Mainpuri | MNQ | Farrukhabad–Shikohabad line |
ReferencesEdit
- ↑ "जल्द शुरू होगी इटावा-मैनपुरी रेल लाइन". Dainik Jagran (in हिन्दी). Retrieved 27 September 2019.
- ↑ "दौड़ने लगी इटावा-मैनपुरी लाइन पर पैसेंजर". Amar Ujala. Retrieved 27 September 2019.
- ↑ "18 साल बाद इटावा से चलकर मैनपुरी स्टेशन पहुंची सपनों की रेल". Hindustan Dainik (in hindi). Retrieved 27 September 2019.
{{cite web}}
: CS1 maint: unrecognized language (link) - ↑ "Mulayam's Saifai on railway map". The Times of India. 20 May 2016. Retrieved 30 May 2018.
- ↑ Singh, Sarita C. (1 February 2019). "BHEL wins Rs 350 crore order for railway line electrification". The Economic Times. Retrieved 27 September 2019.