Etah railway station

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



Indian Railways Suburban Railway Logo.svg
Etah railway station
Indian Railways station
Etah.jpg
Etah railway station
LocationNear Arsh Gurukul, Kasganj Road, Etah, Uttar Pradesh
India
Coordinates25°34′19″N 78°39′15″E / 25.5720°N 78.6543°E / 25.5720; 78.6543
Elevation174 metres (571 ft)
Owned byIndian Railways
Operated byNorth Central Railway
Line(s)Barhan–Etah branch line
Platforms1
Tracks3
Construction
Structure typeStandard on ground
ParkingNo
Bicycle facilitiesYES
Other information
StatusFunctioning
Station codeETAH
Division(s) Prayagraj
History
Opened1959
Rebuilt2019
Electrified2020–2021
Passengers
Present 500
Location
Etah railway station is located in India
Etah railway station
Etah railway station
Location in Uttar Pradesh
Etah railway station is located in Uttar Pradesh
Etah railway station
Etah railway station
Etah railway station (Uttar Pradesh)

Etah railway station is on the Barhan–Etah branch line. It is located in Etah district in the Indian state of Uttar Pradesh. It serves Etah and the surrounding areas.

History[edit]

Trains started running on the Howrah–Delhi main line of East Indian Railway Company in 1865–66. After independence, Etah railway station was established in 1949 by the State Railways minister Mr. Rohanlal Chaturvedi! Etah railway station was inaugurated by the first President of India Dr Rajendra Prasad. After this time passed but the railway resources remained there. From 2000 onwards, the demand for railway line expansion started gaining momentum, which became the major demand of every section since 2005. All the movements took place from Etah to the capital Delhi. How many memoranda and signatures have been sent to the President Prime Minister and the Ministry of Railways, but till now the railway line expansion remains the hope.

Train[edit]

Etah - Tundla passenger train started. Which used to take two rounds daily. After that, for the first time in 2019, the Etah-Agra Fort train ran. Which was closed after just 6 months. The Etah-Tundla passenger was also discontinued at Lockdon. But now this train has started in 2021 again. It is a matter of happiness that Etah - Agra Fort has also started running again. But sadly, despite Etah being a district, the station here is small with not many trains available. Only two trains run. There are no long distance trains.

Development[edit]

  • Etah–Kasganj[1][2][3] new line work has been sanctioned in the Budget 2017–2018.
  • New[when?] passenger train service started from Etah to Agra Fort railway station.
  • Work is underway on the new railway line between Etah to Malawan for the ultra mega power plant being built in Etah.
  • A New route has been surveyed from Etah to Aligarh and there is a demand for connecting it to Mainpuri and Gursahaiganj(kannuj).
  • Work is also underway to electrify the track on Barhan–Etah line.[4][5]
  • Work is currently underway at its station to make Etah a big junction and to increase the number of train and freight train.the goal is to connect Etah to Dedicated Freight Corridor.[6][7]
Etah Station.jpg

The railway is now going to make Etah railway station a hub for goods trains. So far, only one track has been laid from Barhan to Agra. Its electrification work is on the verge of ending. At the same time, a new track will be laid to erect goods trains on the south side of the railway station. Two tracks will be laid here, so that freight trains can be easily erected. At the same time, the length of the platform will be increased and the signals will be repaired.

See also[edit]

References[edit]

  1. "Important Railway Projects over N.E.Railway in Budget-2017–18". 10 February 2017.
  2. "एटा-कासगंज रेल लाइन को मंजूरी – Amarujala". Amar Ujala. Retrieved 24 March 2017.
  3. "Uttam Rail: A Progressive Journey since 2014" (PDF). Etah Parliamentary Constituency.
  4. "Etah Barhan railway line electrification" (PDF).
  5. "बरहन-एटा रेलवे ट्रैक विद्युतीकरण की प्रक्रिया शुरू" [Barhan-Etah railway track electrification process started] (in Hindi). 3 February 2020.{{cite news}}: CS1 maint: unrecognized language (link)
  6. "Story". epaper.jagran.com. Archived from the original on 19 April 2017. Retrieved 18 April 2017.
  7. yashm. "04191/Agra Fort – Etah Passenger Special (unreserved) – Barhan/BRN to Etah/ETAH NCR/North Central Zone – Railway Enquiry". India Rail Info. Retrieved 18 April 2017.
Preceding station   Indian Railways   Following station
TerminusNorth Central Railway zone
toward ?