Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)


Coimbatore BRTS
Overview
LocaleKovai metropolitan area
Transit typeRapid transit
Number of lines1
Operation
Operator(s)Coimbatore City Municipal Corporation
Technical
System length27.6 kilometres (17.1 mi)

The Coimbatore BRTS was a proposed bus rapid transit system for the Kovai metropolitan area under the JNNURM scheme. Project stretch of about 18.6 km starting at Avinashi Road and ending at Mettupalayam Road running through Dr.Rajendra Prasath Road. After Avinashi road, the project road turns left from Stanes School and passes along Dr.Nanjappa road and joins at Dr. Rajendra Prasad Road (100 Ft. Road). Avinashi road, Dr. Rajendra Prasad Road and Mettupalyam road are provided with the exclusive lane for buses termed BRTS lane and the connecting links are allowed to flow with the mixed traffic.

A Dedicated Two Lane carriageway of width 7.0m is provided for BRTS corridor. A Dual Lane for Mixed Traffic of Width 7.0m is provided on either side of the BRTS corridor. The Mixed traffic lane is separated from the BRTS lane by providing 250mm wide CC block on both sides. 2.0m wide Cycle Track over and 2.0m wide Footpath over built-up drain is proposed on either side of Mixed Traffic Lane. The Cycle Track is separated from Mixed Traffic Lane by providing 250mm CC Buttons. Out of Total 17.6 km BRTS is passing at grade for a length of 6.64 km (dedicated) and 6.87 km is passing through elevated section. It is proposed to have 14 at grade bus stops and 3 elevated bus stops.

Coimbatore BRTS [1]

Corridors[edit]

Avinashi Road — Dr. Rajendra Prasad Road — Mettupalayam Road

Design Speed[edit]

The speed design for the BRTS corridor is proposed to be 50 km/h - 60 km/h.