Blue Line (Kanpur Metro)
| Blue Line | |||
|---|---|---|---|
| Overview | |||
| Status | Approved | ||
| Locale | Kanpur, Uttar Pradesh, India | ||
| Termini | Agriculture University Barra-8 | ||
| Stations | 8 | ||
| Service | |||
| Type | Rapid transit | ||
| System | Kanpur Metro | ||
| Operator(s) | Uttar Pradesh Metro Rail Corporation | ||
| Rolling stock | Alstom - Bombardier Movia | ||
| Technical | |||
| Line length |
| ||
| Character | Elevated & Underground | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| Electrification | 750 V DC third rail | ||
| Operating speed |
| ||
| |||
The Blue Line (Line 2) (Hindi: ब्लू लाइन) of the Kanpur Metro is an approved metro route of mass rapid transit system in Kanpur. It consists of 8 stations from Agriculture University to Barra-8 with a total distance of 8.6 km. Its construction is expected to begin by end of December 2023.[1][2][3]
List of stations[edit | edit source]
| colspan="8" style="background:#Template:Rcr;" | Blue Line | ||||
|---|---|---|---|---|
| # | Station Name | Connections | Layout | |
| English | Hindi | |||
| 1 | Agriculture University | कृषि विश्वविद्यालय | None | Underground |
| 2 | Template:Stl | रावतपुर | Rawatpur railway station Template:Rcb | Underground |
| 3 | Kakadeo | काकादेव | None | Underground |
| 4 | Double Pulia | डबल पुलिया | None | Underground |
| 5 | Vijay Nagar Chauraha | विजय नगर चौराहा | None | Elevated |
| 6 | Shastri Chowk | शास्त्री चौक | None | Elevated |
| 7 | Barra-7 | बर्रा-7 | None | Elevated |
| 8 | Barra-8 | बर्रा-8 | None | Elevated |
See also[edit | edit source]
References[edit | edit source]
- ↑ "Work on Kanpur Metro second corridor to begin by end of December". Retrieved 15 September 2023.
- ↑ "9 Bidders for Kanpur Metro Line-2's KNPCC-11 Underground Work". Retrieved 15 September 2023.
- ↑ "Kanpur Metro – Information, Route Maps, Fares, Tenders & Updates". Retrieved 15 September 2023.