Bairabi Dam

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)


Bairabi Dam
Lua error in Module:Location_map at line 403: attempt to index field 'wikibase' (a nil value).
CountryIndia
LocationBairabi
Dam and spillways
Type of damEmbankment, earth-fill
ImpoundsTlawng River
Height67 m (220 ft)
Length182 m (597 ft)
Power Station
Turbines2x40MW
Installed capacity80 MW

Bairabi Dam is a proposed 80 MW dam[1] on the Tlawng river near Bairabi Village in Kolasib district in the state of Mizoram in India.

History[edit]

Bairabi Hydel Project is a 120 MW project initiated by Brig Ṭhenphunga Sailo[2] during Mizoram People's Conference government. National Hydroelectric Power Corporation had started the survey and investigation of Detailed Project Implementation in 1982. NHPC prepared the feasibility reported on the basis of field investigations which were completed in 1982-83.[3]

Due to the change in government in 1984, the Congress Government led by Pu Lalthanhawla came to power, Techno-Economic Clearance, Forest & Environment Clearance was pursued but not successful, hence Brahmaputra Board was asked to reinvestigate and prepare a DIPR, who reduced the power project from 120 MW to 80 MW.[4]

The Mizo National Front Government under Pu Zoramthanga came to power in 2000, even though Techno-Economic Clearance and Forest Environment Clearances were received, but due to non availability of funds, no progress was made.

The Congress Government led by Pu Lalthanhawla came back to power in 2008, A MoU was signed between the Government of Mizoram and Sikaria Power Ltd, Kolkata on 10 August 2012 out of which the State Government will receive 13% free and the remaining amount will be sold to the government.[5]

References[edit]

  1. "Detailed Status of Tenth Plan Hydro Power Projects (May 2005)". Infraline. Retrieved 13 August 2012.
  2. "Sailo among oldest active politicians". IBN Live. Archived from the original on 12 May 2014. Retrieved 13 August 2012.
  3. "POWER MAWLH HI". The Zozam Times. Archived from the original on 15 April 2013. Retrieved 13 August 2012.
  4. aijal1. "Bairabi O Bairabi!!". misual.com. Retrieved 13 August 2012.
  5. Lalfakzuala. "Bairabi Dam Project 80MW leh TLAWNG HEP 55MW TAN MOU ZIAKFEL". DIPR Mizoram. Archived from the original on 8 January 2014. Retrieved 13 August 2012.