Manjunath Nagar | ||
|---|---|---|
| Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. station | ||
| Location | Arch No 45, Gomatha Complex Bagalgunte, next to Bagalgunte, Bengaluru, Karnataka 560073 | |
| Coordinates | 13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E | |
| Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | |
| Operated by | Namma Metro | |
| Line(s) | Lua error in Module:Adjacent_stations at line 500: attempt to index local 'data' (a nil value). | |
| Platforms | Side platform Platform-1 → Madavara Platform-2 → Silk Institute | |
| Tracks | 2 | |
| Construction | ||
| Structure type | Elevated, Double track | |
| Platform levels | 2 | |
| Parking | (TBC) | |
| Disabled access | (TBC) | |
| Other information | ||
| Status | Under Construction | |
| Station code | (TBC) | |
| History | ||
| Opened | December 2023 | |
| Electrified | 750 V DC third rail | |
| Services | ||
|
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. | ||
| Location | ||
![]() | ||
Manjunath Nagar is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway leading towards the city of Nelamangala in Karnataka. This metro station is stated to be operational around December 2023.[1][2]
Station layout[edit | edit source]
Station Layout (TBC)
Manjunath Nagar track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
| ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 2 Southbound |
Towards → Silk Institute next station is Nagasandra | |
| Platform 1 Northbound |
Towards ← Madavara next station is Chikkabidarakallu | |
| Side platform | Doors will open on the left | ||
| L2 | ||
Entry/Exits[edit | edit source]
This section is empty. You can help by adding to it. (August 2023) |
See also[edit | edit source]
- Bangalore
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
References[edit | edit source]
- ↑ "Bengaluru Metro: New Line to Open for Public in September, Says Karnataka CM". News18. 17 August 2023. Retrieved 30 August 2023.
- ↑ DHNS. "Will Nagasandra-Madavara metro be operational by October? Bengaluru Metro Green Line updates". Deccan Herald. Retrieved 30 August 2023.
External links[edit | edit source]
- Bangalore Metro Rail Corporation Ltd. (Official site)
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
