Created by
Last edited August 31, 2023
Talk
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Manjunath Nagar
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. station
LocationArch No 45, Gomatha Complex Bagalgunte, next to Bagalgunte, Bengaluru, Karnataka 560073
Coordinates13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E / 13.05022; 77.49444
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Lua error in Module:Adjacent_stations at line 500: attempt to index local 'data' (a nil value).
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
Disabled access(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpenedDecember 2023; 2 years ago (December 2023)
Electrified750 V DC third rail
Services
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Map

Manjunath Nagar is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway leading towards the city of Nelamangala in Karnataka. This metro station is stated to be operational around December 2023.[1][2]

Station layout

Station Layout (TBC)

Manjunath Nagar track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute next station is Nagasandra
Platform 1
Northbound
Towards ← Madavara next station is Chikkabidarakallu
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

  1. ↑ "Bengaluru Metro: New Line to Open for Public in September, Says Karnataka CM". News18. 17 August 2023. Retrieved 30 August 2023.
  2. ↑ DHNS. "Will Nagasandra-Madavara metro be operational by October? Bengaluru Metro Green Line updates". Deccan Herald. Retrieved 30 August 2023.

External links