Mumbai CST–Howrah Duronto Express
This article does not cite any sources.(February 2013) |
Mumbai CSMT–Howrah AC Duronto Express is a Duronto Express train plying in Mumbai–Howrah route.
![]() | |
Overview | |
---|---|
Service type | Duronto Express |
Locale | Maharashtra, Chhattisgarh, Orissa, Jharkhand & West Bengal |
First service | September 29, 2009 |
Current operator(s) | South Eastern Railway zone |
Route | |
Start | Chhatrapati Shivaji Maharaj Terminus |
End | Howrah Junction |
Distance travelled | 1,968.227712 km (1,223.000000 mi) |
Average journey time | 12261 – 26 hours, 35 minutes |
Service frequency | Four times a week |
Train number(s) | 12261 / 12262 |
On-board services | |
Class(es) | AC 1st Class, AC 2 Tier, AC 3 Tier |
Seating arrangements | No |
Sleeping arrangements | Yes |
Catering facilities | Yes |
Technical | |
Rolling stock | WAP-7/WAP-4 (HWH/SRC) |
Operating speed | 74.029824 km/h (46 mph) (Average Speed), including halts. 130 km/h (max. permissible) |
BackgroundEdit
Being the non-stop version of the Duronto train, it used to take fewest intermediate halts for operational/ technical purposes such as crew change, locomotive change, food pick-up, and water-filling. Later most of operational/ technical halts were made commercial halts.
Rake sharingEdit
It shares rakes with Pune Howrah Duronto Express, which has same timetable or runs between Manmad Junction and Howrah Junction.
Coach compositionEdit
Loco | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
EOG | A3 | A2 | A1 | H1 | PC | B10 | B9 | B8 | B7 | B6 | B5 | B4 | B3 | B2 | B1 | EOG |
12262 is the reverse composition of the above 12261.
B- Three Tier AC Sleeper/Third AC, A- Two Tier AC Sleeper/Second AC, H- AC First class cabins/First AC, PC-Pantry/Hot buffet car, EOG/GV-Generator van cum Guard van
LocomotiveEdit
It mostly gets WAP-4 loco of Howrah (ER) shed from Howrah Junction.
Before the conversion of Mumbai CSMT to Kasara from 1500 V DC to 25 kV AC, it was hauled by WCAM-3 of KYN shed for that section.
SpeedEdit
The maximum permissible speed is 130 km/h but it is less in many parts of the journey as many parts are not fit for 130 km/h speed. The maximum permissible speed is 105 km/h between Mumbai CSMT and Kasara where increasing up to 110 kmph in future is planned, 60 km/h between Kasara and Igatpuri, 110 km/h between Igatpuri and Wardha, 120 kmph between Wardha and Nagpur [1], 110 km/h in Nagpur - Jharsuguda - Tatanagar route but the speed in this part is under process to be increased to 130 kmph, 130 km/h between Tatanagar to Kharagpur and Kharagpur to Andul. 110 km/h between Andul and Howrah. [2] [3] [4] [5]
HaltsEdit
Igatpuri, Bhusaval, Nagpur, Bilaspur, Tatanagar.
Technical haltsEdit
12261 takes 1 technical halt at Kasara, It takes about 7 mins at Kasara for addition of banker engine WAG-7 for the run through the ghats, which is removed at Igatpuri.
12262 takes no technical halts.