Mumbai CST–Howrah Duronto Express

Mumbai CSMT–Howrah AC Duronto Express is a Duronto Express train plying in Mumbai–Howrah route.

Mumbai CST–Howrah Duronto Express
12261 Howrah Duronto Express Trainboard.jpg
Overview
Service typeDuronto Express
LocaleMaharashtra, Chhattisgarh, Orissa, Jharkhand & West Bengal
First serviceSeptember 29, 2009; 15 years ago (2009-09-29)
Current operator(s)South Eastern Railway zone
Route
StartChhatrapati Shivaji Maharaj Terminus
EndHowrah Junction
Distance travelled1,968.227712 km (1,223.000000 mi)
Average journey time12261 – 26 hours, 35 minutes
Service frequencyFour times a week
Train number(s)12261 / 12262
On-board services
Class(es)AC 1st Class, AC 2 Tier, AC 3 Tier
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesYes
Technical
Rolling stockWAP-7/WAP-4 (HWH/SRC)
Operating speed74.029824 km/h (46 mph) (Average Speed), including halts. 130 km/h (max. permissible)

BackgroundEdit

Being the non-stop version of the Duronto train, it used to take fewest intermediate halts for operational/ technical purposes such as crew change, locomotive change, food pick-up, and water-filling. Later most of operational/ technical halts were made commercial halts.

Rake sharingEdit

It shares rakes with Pune Howrah Duronto Express, which has same timetable or runs between Manmad Junction and Howrah Junction.

 
12261 Howrah Duronto Express
 
Howrah Duronto Express with Santragachi WAP-4 loco at Raigarh

Coach compositionEdit

Loco 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
  EOG A3 A2 A1 H1 PC B10 B9 B8 B7 B6 B5 B4 B3 B2 B1 EOG

12262 is the reverse composition of the above 12261.

B- Three Tier AC Sleeper/Third AC, A- Two Tier AC Sleeper/Second AC, H- AC First class cabins/First AC, PC-Pantry/Hot buffet car, EOG/GV-Generator van cum Guard van

LocomotiveEdit

It mostly gets WAP-4 loco of Howrah (ER) shed from Howrah Junction.

Before the conversion of Mumbai CSMT to Kasara from 1500 V DC to 25 kV AC, it was hauled by WCAM-3 of KYN shed for that section.

SpeedEdit

The maximum permissible speed is 130 km/h but it is less in many parts of the journey as many parts are not fit for 130 km/h speed. The maximum permissible speed is 105 km/h between Mumbai CSMT and Kasara where increasing up to 110 kmph in future is planned, 60 km/h between Kasara and Igatpuri, 110 km/h between Igatpuri and Wardha, 120 kmph between Wardha and Nagpur [1], 110 km/h in Nagpur - Jharsuguda - Tatanagar route but the speed in this part is under process to be increased to 130 kmph, 130 km/h between Tatanagar to Kharagpur and Kharagpur to Andul. 110 km/h between Andul and Howrah. [2] [3] [4] [5]

HaltsEdit

Igatpuri, Bhusaval, Nagpur, Bilaspur, Tatanagar.

Technical haltsEdit

12261 takes 1 technical halt at Kasara, It takes about 7 mins at Kasara for addition of banker engine WAG-7 for the run through the ghats, which is removed at Igatpuri.

12262 takes no technical halts.

ReferencesEdit