Line 5 (Mumbai Metro): Difference between revisions

Created by Vasaiakr25
Last edited May 24, 2025
>Vasaiakr25
No edit summary
 
improved article
 
Line 1: Line 1:
{{Use dmy dates|date=February 2019}}
#REDIRECT [[Orange Line (Mumbai Metro)]]
{{Use Indian English|date=February 2019}}
 
{{Infobox rail line
{{Redirect category shell|
| box_width                      =
{{R from move}}
| name                            = [[File:MMRDA_LOGO.jpg|60px|link=Mumbai Metro]]  Mumbai Metro Orange Line 5
| other_name                      =
| native_name                    =
| native_name_lang                =
| color                          = ffa500
| logo                            =
| logo_width                      =
| logo_alt                        =
| image                          = Maha Mumbai Metro.png
| image_width                    =
| image_alt                      =
| caption                        =
| type                            = [[Rapid transit|Metro]]
| system                          = [[Mumbai Metro]]
| status                          = Under Construction
| locale                          = [[Thane]], [[Mumbai]], [[Maharashtra]], India
| start                          = Thane
| end                            =
| stations                        = 17
| routes                          =
| daily_ridership                =
| ridership2                      =
| open                            = <!--{{Start date and age|YYYY|MM|DD|df=y}}-->
| planopen                        = {{start date and age|df=y|2022}}
| yearcommenced                  = {{start date and age|2019|October|18|df=y}}
| event1label                    =
| event1                          =
| event2label                    =
| event2                          =
| event3label                    =
| event3                          =
| owner                          = [[Mumbai Metropolitan Region Development Authority]] (MMRDA)
| operator                        =
| character                      = Elevated
| depot                          =
| stock                          =
| linelength_km                  = 24.9
| tracklength_km                  =
| tracks                          =
| gauge                          = {{RailGauge|sg|allk=on}}
| load_gauge                      =
| minradius                      =
| racksystem                      =
| routenumber                    =
| linenumber                      =
| electrification                =
| speed_km/h                      =
| elevation_m                    =
| elevation_ft                    =
| elevation                      =
| website                        = {{url|https://mmrda.maharashtra.gov.in/metro-line-5|Line 5}}
| map                            = {{MM Line 5}}
| map_state                      = collapsed
}}
}}
'''Orange Line 5''' of the [[Mumbai Metro]], or the '''Thane-Bhiwandi-Kalyan Line''', is part of the metro system for the city of [[Mumbai]], India. This line is fully elevated.
The 24.9 km-long Thane-Bhiwandi-Kalyan Metro-V corridor will have 17 stations and will cost Rs. 8,416 crore. It will be totally an elevated corridor. It will connect Thane to Bhiwandi and Kalyan in the eastern suburbs. The stations include Kapurbawdi in Thane (West), Balkum Naka, Kasheli, Kalher, Purna, Anjur Phata, Dhamankar Naka, Bhiwandi, Gopal Nagar, Temghar, Rajnouli Village, Govegaon MIDC, Kongaon, Durgadi Fort, Sahajanand Chowk, Kalyan Railway Station. The line was approved by the Maharashtra Cabinet on 24 October 2017.<ref>{{cite web |title=Mumbai Metro’s corridor 5 and 6 gets  Maharashtra cabinet approval |url=https://www.livemint.com/Politics/Z1VWUGDGga5lJjdm8llzKI/Mumbai-Metros-corridor-5-and-6-gets-Maharashtra-cabinet-ap.html |website=Livemint |access-date=9 October 2018 |date=24 October 2017}}</ref>
The MMRDA began carrying out survey work for the line by December 2017.<ref>{{cite web |title=Mumbai Metro-5 to move through crowded areas of Thane |url=http://www.asianage.com/metros/mumbai/281217/mumbai-metro-5-to-move-through-crowded-areas-of-thane.html |website=The Asian Age |access-date=9 October 2018 |date=28 December 2017}}</ref> Survey work was interrupted due to protests by some shopkeepers and residents of Bhiwandi.<ref>{{cite web |title=Bhiwandi residents oppose Metro 5 |url=http://www.asianage.com/metros/mumbai/010818/bhiwandi-residents-oppose-metro-5.html |website=The Asian Age |access-date=9 October 2018 |date=1 August 2018}}</ref>
==Stations==
There will be 17 stations on Line 5.
{| class="wikitable" style="text-align:center;"
|-
! style="background:#FFA500;" colspan="10" | <span style="color:White;">'''Orange Line 5'''</span>
|-
! rowspan="2"|#
! colspan="2"|Station Name
! rowspan="2"|Status
! rowspan="2"|Connections
! rowspan="2"|Layout
|-
! [[English language|English]]||[[Marathi language|Marathi]]
|-
| 1 || {{metro|Kapurbawdi}} || कापूरबावडी || Under Construction || {{color box|#008000; font-size:100%|[[Line 4 (Mumbai Metro)|<span style="color:white">'''Green Line 4'''</span>]]|}} (Under Construction) || Elevated
|-
| 2 || {{metro|Balkum Naka}} || बाळकुम नाका || Under Construction || None || Elevated
|-
| 3 || {{metro|Kasheli}}|| कशेळी || Under Construction || None || Elevated
|-
| 4 || {{metro|Kalher}} || काल्हेर || Under Construction || None || Elevated
|-
| 5 || {{metro|Purna}}  || पूर्णा || Under Construction || None || Elevated
|-
| 6 || {{metro|Anjur Phata}} || अंजूर फाटा || Under Construction || Indian Railways || Elevated
|-
| 7 || {{metro|Dhamankar Naka}} || धामणकर नाका || Under Construction || None || Elevated
|-
| 8 || {{metro|Bhiwandi}} || भिवंडी || Under Construction || None || Elevated
|-
| 9 || {{metro|Gopal Nagar}} || गोपाल नगर || Under Construction || None || Elevated
|-
| 10 || {{metro|Temghar}} || टेमघर || Under Construction || None || Elevated
|-
| 11 || {{metro|Rajnouli Village}} || राजनौली गाव || Under Construction || None || Elevated
|-
| 12 || {{metro|Govegaon MIDC}} || गोवेगाव एमआयडीसी || Under Construction || None || Elevated
|-
| 13 || {{metro|Kongaon}} || कोणगाव || Under Construction || None || Elevated
|-
| 14 || {{metro|Durgadi Fort}} || दुर्गाडी किल्ला || Under Construction || None || Elevated
|-
| 15 || {{metro|Sahajanand Chowk}} || सहजानंद चौक || Under Construction || None || Elevated
|-
| 16 || {{metro|Kalyan Railway Station}} || कल्याण रेल्वे स्थानक || Under Construction || [[Central line (Mumbai Suburban Railway)|Central line]], [[Indian Railways]] || Elevated
|-
| 17 || {{metro|Kalyan APMC}} || कल्याण एपीएमसी ||  Under Construction || {{color box|#FFA500; font-size:100%|[[Line 12 (Mumbai Metro)|<span style="color:white">'''Orange Line 12'''</span>]]|}} (Proposed)|| Elevated
|}
==References==
{{Reflist}}
{{Mumbai Metro navbox}}
[[Category:Mumbai Metro lines]]
{{India-rail-transport-stub}}

Latest revision as of 22:41, 24 May 2025