->WereSpielChequers m →top: Typo fixing, replaced: has became → has become using AWB |
expanded content as per guidelines |
||
| Line 1: | Line 1: | ||
{{Use dmy dates|date=May 2017}} | {{Use dmy dates|date=May 2017}} | ||
{{Use Indian English|date=May 2017}} | {{Use Indian English|date=May 2017}} | ||
'''Kushabhau Thakre Marg''' commonly known as | |||
{{Infobox road | |||
| country = IND | |||
| state = Madhya Pradesh | |||
| type = | |||
| route = | |||
| maint = | |||
| length_km = 12 | |||
| direction_a = North | |||
| terminus_a = Luv Kush Square | |||
| junction = | |||
| direction_b = South | |||
| terminus_b = Gandhi Nagar Square | |||
}} | |||
'''Kushabhau Thakre Marg''' commonly known as Super Corridor (MR10) is a road that connects [[AH47|AH47 Agra - Mumbai National Highway]] with [[Madhya Pradesh State Highway 27|MP SH 27]] and [[Indore Airport]]. Kushabhau Thakre Marg is one of the busiest roads of the city of [[Indore]] and has become a new hub in the city.<ref>[http://www.hindustantimes.com/indore/super-corridor-to-be-unveiled-as-financial-tech-hub-ida/story-3qVU6XD30rnzTtQHpDQFsJ.html Super Corridor to be unveiled as financial-tech hub: IDA]</ref><ref>[http://www.hindustantimes.com/indore/indore-super-corridor-fails-to-give-returns-but-future-is-bright/story-9IRFKhF9gl2ZUuXnUZNBNJ.html Indore Super Corridor fails to give returns, but future is bright]</ref><ref>[http://timesofindia.indiatimes.com/city/indore/major-roads-discussed-in-the-meet/articleshow/57350753.cms Major roads discussed in the meet]</ref><ref>{{cite news |title=Indore Super Corridor fails to give returns, but future is bright |url=https://www.hindustantimes.com/indore/indore-super-corridor-fails-to-give-returns-but-future-is-bright/story-9IRFKhF9gl2ZUuXnUZNBNJ.html |access-date=30 December 2022 |work=Hindustan Times |date=22 May 2016}}</ref> | |||
==Connectivity== | |||
===Metro=== | |||
The work for the Phase-1 of the [[Indore Metro]] is currently in full swing slated to be operational by late 2023. A depot is also being developed near Gandhi Nagar Square.<ref>{{cite news |title=Indore: First phase of metro rail to be operational in Sept, 2023, says Minister Bhupendra Singh |url=https://www.freepressjournal.in/indore/indore-first-phase-of-metro-rail-to-beoperational-in-sept-2023-says-minister-bhupendra-singh |access-date=30 December 2022 |work=The Free Press Journal |date=7 Oct 2022}}</ref><ref>{{cite news |title=Indore: MPMRCL faces hectic work schedule ahead of PBD, GIS |url=https://www.freepressjournal.in/pbd-indore/indore-mpmrcl-faces-hectic-workschedule-ahead-of-pbd-gis |access-date=30 December 2022 |work=The Free Press Journal |date=15 Dec 2022 |location=Indore, MP}}</ref><ref>{{cite news |title=Metro Rail construction: Segment work for viaduct between Super Corridor 3 and Super Corridor 2 started |url=https://www.freepressjournal.in/indore/metro-rail-construction-segment-work-for-viaduct-between-super-corridor-3-and-super-corridor-2-started |access-date=30 December 2022 |work=The Free Press Journal |date=23 Oct 2022 |language=English}}</ref> | |||
==References== | ==References== | ||
Latest revision as of 14:11, 30 December 2022
| Route information | |
|---|---|
| Length | 12 km (7 mi) |
| Major junctions | |
| North end | Luv Kush Square |
| South end | Gandhi Nagar Square |
| Highway system | |
|
| |
Kushabhau Thakre Marg commonly known as Super Corridor (MR10) is a road that connects AH47 Agra - Mumbai National Highway with MP SH 27 and Indore Airport. Kushabhau Thakre Marg is one of the busiest roads of the city of Indore and has become a new hub in the city.[1][2][3][4]
Connectivity[edit | edit source]
Metro[edit | edit source]
The work for the Phase-1 of the Indore Metro is currently in full swing slated to be operational by late 2023. A depot is also being developed near Gandhi Nagar Square.[5][6][7]
References[edit | edit source]
- ↑ Super Corridor to be unveiled as financial-tech hub: IDA
- ↑ Indore Super Corridor fails to give returns, but future is bright
- ↑ Major roads discussed in the meet
- ↑ "Indore Super Corridor fails to give returns, but future is bright". Hindustan Times. 22 May 2016. Retrieved 30 December 2022.
- ↑ "Indore: First phase of metro rail to be operational in Sept, 2023, says Minister Bhupendra Singh". The Free Press Journal. 7 October 2022. Retrieved 30 December 2022.
- ↑ "Indore: MPMRCL faces hectic work schedule ahead of PBD, GIS". The Free Press Journal. Indore, MP. 15 December 2022. Retrieved 30 December 2022.
- ↑ "Metro Rail construction: Segment work for viaduct between Super Corridor 3 and Super Corridor 2 started". The Free Press Journal. 23 October 2022. Retrieved 30 December 2022.