{{Infobox company
{{Infobox company
| name = MPPGCL
| name = Madhya Pradesh Power Generating Company Limited
| logo =
| logo =
| type = [[Government-owned corporation|Government-owned Corporation]]-[[Public Sector Undertaking|PSU]]
| type = [[Government-owned corporation|Government-owned Corporation]]-[[Public Sector Undertaking|PSU]]
Line 9: Line 9:
| key_people = Shri Sanjay Dubey (chairman)<br />Shri Manjeet Singh (managing director)
| key_people = Shri Sanjay Dubey (chairman)<br />Shri Manjeet Singh (managing director)
| services = [[Electricity Generation]]
| services = [[Electricity Generation]]
| area_served = State of [[Madhya Pradesh]],India
| area_served = State of [[Madhya Pradesh]], India
| foundation = The Company was incorporated on 22.11.2001 & started functioning independently from 01-06-2005
| foundation = The Company was incorporated on 22.11.2001 & started functioning independently from 01-06-2005
| location = [[Jabalpur, Madhya Pradesh]], India
| location = [[Jabalpur, Madhya Pradesh]], India
Line 17: Line 17:
}}
}}


'''M.P. Power Generation Company Limited''' ('''MPPGCL''') is the [[electricity]] generation company of the [[Government of Madhya Pradesh]] state in [[India]].
'''M.P. Power Generating Company Limited''' ('''MPPGCL''') is the [[electricity]] generation company of the [[Government of Madhya Pradesh]] state in [[India]].


== Generation capacity ==
== Generation capacity ==
The installed capacity of MPPGCL as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW.<ref name=":0">{{cite web|title=Archived copy|url=http://www.mppgcl.mp.gov.in/mppgenco-introduction.html|last=|first=|date=|website=|url-status=dead|archiveurl=https://web.archive.org/web/20100609195606/http://mppgenco.nic.in/mpgenco-install-detail.htm|archivedate=2010-06-09|accessdate=2010-08-28}}</ref>
The installed capacity of MPPGCL as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW.<ref name=":0">{{cite web|title=M.P.Power Generating Company Limited|url=http://www.mppgcl.mp.gov.in/mppgenco-introduction.html|last=|first=|date=|website=|url-status=dead|archiveurl=https://web.archive.org/web/20100609195606/http://mppgenco.nic.in/mpgenco-install-detail.htm|archivedate=2010-06-09|accessdate=2010-08-28}}</ref>
{| class="wikitable"
{| class="wikitable"
| colspan="6" |                            '''PLF (%) LAST 10 YEARS'''
| colspan="6" |                            '''PLF (%) Last 10 Years'''
|-
|-
|YEARS
|Years
|ATPS
|ATPS
|STPS
|STPS
|SGTPS
|SGTPS
|SSTPP
|SSTPP
|OVERALL
|Overall
|-
|-
|2009-10
|2009-10
Line 107: Line 107:
{| class="wikitable"
{| class="wikitable"
|-
|-
! Sr.No !! Project !! Capacity(in M.W.) !! Unit [[Megawatt|MW]] !! Status !! EPC Contractor(TG set and Boiler make)
! Sr.No !! Project !! Capacity (in M.W.) !! Unit [[Megawatt|MW]] !! Status !! EPC Contractor (TG set and Boiler make)
|-
|-
| 1 || [[Satpura Thermal Power Station]] || 1330 || 1×200 MW, 3x210 MW, 2x250 MW  ||All Unit Functional,however 200MW and 210 MW to be decommissioned soon ,1x660 MW under surveying || [[BHEL]]
| 1 || [[Satpura Thermal Power Station]] || 1330 || 1×200 MW, 3x210 MW, 2x250 MW  ||All Unit Functional, however 200MW and 210 MW to be decommissioned soon ,1x660 MW under surveying || [[Bharat Heavy Electricals Limited|BHEL]]
|-
|-
| 2 || [[Amarkantak Thermal Power Station]] ||210||  1×210 MW ||All Unit Functional ,1x660 MW under surveying || [[BHEL]]
| 2 || [[Amarkantak Thermal Power Station]] ||210||  1×210 MW ||All Unit Functional ,1x660 MW under surveying || BHEL
|-
|-
| 3 || [[Sanjay Gandhi Thermal Power Station]] || 1340 || 4×210 MW,1×500 MW || All Unit Functional || [[BHEL]](though ABL make boiler in 210MW units)
| 3 || [[Sanjay Gandhi Thermal Power Station]] || 1340 || 4×210 MW,1×500 MW || All Unit Functional || BHEL (though ABL make boiler in 210MW units)
|-
|-
| 4 || [[Shree Singaji Thermal Power Station]] || 2520 || 2x600 MW, 2×660 MW(super critical) || All Unit Functional.|| [[BHEL]] -600MW, [[L&T-MHPS]]-660MW
| 4 || [[Shree Singaji Thermal Power Station]] || 2520 || 2x600 MW, 2×660 MW (super critical) || All Unit Functional.|| BHEL -600MW, [[L&T-MHPS]]-660MW


|-  
|-  
Line 124: Line 124:
{| class="wikitable"
{| class="wikitable"
|-
|-
! Sr.No !! Power Station !! Installed Capacity !! M.P.Share!!LOCATION/ RIVER
! Sr.No !! Power Station !! Installed Capacity !! M.P.Share!!Location / River
|-
|-
| 1 || Gandhi Sagar(5x23 MW)  || 115 || 57.5||DISTT. MANDSOUR/ CHAMBAL RIVER
| 1 || Gandhi Sagar (5x23 MW)  || 115 || 57.5||Distt. Mandsour / Chambal River
|-
|-
| 2 || Pench,Totladoh(2x80 MW) || 160|| 107||DISTT. NAGPUR/ PENCH RIVER
| 2 || Pench, Totladoh (2x80 MW) || 160|| 107||Distt. Nagpur / Pench River
|-
|-
| 3 || Rani Awanti Bai Bargi (2x45 MW)|| 90 || 90||BARGI, DISTT. JABALPUR/ NARMADA RIVE
| 3 || Rani Awanti Bai Bargi (2x45 MW)|| 90 || 90||Bargi, Distt. Jabalpur / Narmada River
|-
|-
| 4 ||Rajghat (3x15 MW) || 45 || 22.5||RAJGHAT, DISTT. ASHOKNAGAR/ BETWA RIVER
| 4 ||Rajghat (3x15 MW) || 45 || 22.5||Rajghat, Distt. Ashoknagar / Betwar River
|-
|-
| 5 || Birsinghpur(1x20 MW) ||20 || 20||BIRSINGHPUR, DISTT. UMARIYA/ JOHILA RIVER
| 5 || Birsinghpur (1x20 MW) ||20 || 20||Birsingpur, Distt. Umariya / Johila River
|-
|-
| 6 ||Ban Sagar I Tons(3x105 MW) ||315|| 315||SIRMOUR, DISTT. REWA BEEHAR RIVER
| 6 ||Ban Sagar I Tons (3x105 MW) ||315|| 315||Sirmour, Distt. Rewa Beehar River
|-
|-
| 7 ||Ban Sagar II Silpara(2x15 MW) || 30 || 30||SILPARA, DISTT. REWA/ CANA
| 7 ||Ban Sagar II Silpara (2x15 MW) || 30 || 30||Silpara, Distt. Rewa / Cana
|-
|-
| 8 || Bansagar -III Deolond (3x20 MW)|| 60 || 60||DEOLOND, DISTT. SHAHDOL/ SONE RIVER
| 8 || Bansagar -III Deolond (3x20 MW)|| 60 || 60||Deolond, Distt. Shahdol / Sone River
|-
|-
| 9 || Bansagar -IV Jhinna (2x10 MW)||20 || 20||JHINNA, DISTT. SATNA/ JHINNA DYKE
| 9 || Bansagar -IV Jhinna (2x10 MW)||20 || 20||Jhinna, Distt. Satna / Jhinna Dyke
|-
| 10 || Madhikheda (3x20 MW) || 60 || 60||Madhikheda, Distt. Shivpuri / Kalisindh River
|-
|-
| 10 || Madhikheda (3x20 MW) || 60 || 60||MADHIKHEDA, DISTT. SHIVPURI/ KALISINDH RIVER
|    || Total|| 1186 || 917.5
|    || Total|| 1186 || 917.5
|}
|}
Two proposed Hydel unit at Chhindwara(2x45MW) and Murena(270 MW)
Two proposed Hydel unit at Chhindwara (2x45MW) and Murena (270 MW)


== References ==
== References ==

Latest revision as of 17:39, 29 September 2025


Madhya Pradesh Power Generating Company Limited
IndustryElectricity generation
FoundedThe Company was incorporated on 22.11.2001 & started functioning independently from 01-06-2005
HeadquartersJabalpur, Madhya Pradesh, India
Area served
State of Madhya Pradesh, India
Key people
Shri Sanjay Dubey (chairman)
Shri Manjeet Singh (managing director)
ServicesElectricity Generation
OwnerGovernment of Madhya Pradesh (100%)
Number of employees
4878
Websitewww.mppgcl.mp.gov.in

M.P. Power Generating Company Limited (MPPGCL) is the electricity generation company of the Government of Madhya Pradesh state in India.

Generation capacity[edit | edit source]

The installed capacity of MPPGCL as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW.[1]

PLF (%) Last 10 Years
Years ATPS STPS SGTPS SSTPP Overall
2009-10 45.89% 64.57% 65.99% N.A. 62.86%
2010-11 48.66% 60.51% 65.78% N.A. 61.10%
2011-12 54.66% 53.68% 70.20% N.A. 61.38%
2012-13 71.66% 55.26% 73.52% N.A. 66.24%
2013-14 74.3% 48.0% 67.8% N.A. 60.0%
2014-15 53.3% 52.9% 58.1% 26.23% 49.6%
2015-16 96.8% 47.2% 59.9% 40.4% 51.2%
2016-17 80.51% 31.28% 58.53% 23.54% 40.49%
2017-18 93.94% 43.09% 64.26% 35.90% 50.55%
2018-19 88.9% 64.1% 74.0% 61.1% 67.3%

Power stations[edit | edit source]

Thermal power stations coal based[edit | edit source]

Sr.No Project Capacity (in M.W.) Unit MW Status EPC Contractor (TG set and Boiler make)
1 Satpura Thermal Power Station 1330 1×200 MW, 3x210 MW, 2x250 MW All Unit Functional, however 200MW and 210 MW to be decommissioned soon ,1x660 MW under surveying BHEL
2 Amarkantak Thermal Power Station 210 1×210 MW All Unit Functional ,1x660 MW under surveying BHEL
3 Sanjay Gandhi Thermal Power Station 1340 4×210 MW,1×500 MW All Unit Functional BHEL (though ABL make boiler in 210MW units)
4 Shree Singaji Thermal Power Station 2520 2x600 MW, 2×660 MW (super critical) All Unit Functional. BHEL -600MW, L&T-MHPS-660MW

Total installed thermal capacity 5400 MW.

Hydel power stations[edit | edit source]

Sr.No Power Station Installed Capacity M.P.Share Location / River
1 Gandhi Sagar (5x23 MW) 115 57.5 Distt. Mandsour / Chambal River
2 Pench, Totladoh (2x80 MW) 160 107 Distt. Nagpur / Pench River
3 Rani Awanti Bai Bargi (2x45 MW) 90 90 Bargi, Distt. Jabalpur / Narmada River
4 Rajghat (3x15 MW) 45 22.5 Rajghat, Distt. Ashoknagar / Betwar River
5 Birsinghpur (1x20 MW) 20 20 Birsingpur, Distt. Umariya / Johila River
6 Ban Sagar I Tons (3x105 MW) 315 315 Sirmour, Distt. Rewa Beehar River
7 Ban Sagar II Silpara (2x15 MW) 30 30 Silpara, Distt. Rewa / Cana
8 Bansagar -III Deolond (3x20 MW) 60 60 Deolond, Distt. Shahdol / Sone River
9 Bansagar -IV Jhinna (2x10 MW) 20 20 Jhinna, Distt. Satna / Jhinna Dyke
10 Madhikheda (3x20 MW) 60 60 Madhikheda, Distt. Shivpuri / Kalisindh River
Total 1186 917.5

Two proposed Hydel unit at Chhindwara (2x45MW) and Murena (270 MW)