m Removed empty portal template using script |
m page fix |
||
| Line 1: | Line 1: | ||
{{Short description|Thermal power station in India}} | |||
{{Use dmy dates|date=July 2018}} | {{Use dmy dates|date=July 2018}} | ||
{{Use Indian English|date=July 2018}} | {{Use Indian English|date=July 2018}} | ||
| Line 15: | Line 16: | ||
|ps_electrical_capacity= 2820.00 MW | |ps_electrical_capacity= 2820.00 MW | ||
|commissioned = 1998 | |commissioned = 1998 | ||
|extra = Source: | |extra = Source: https://rvunl.com/ | ||
}} | }} | ||
'''Suratgarh Super Thermal Power Station''' is [[Rajasthan]]'s first [[super thermal power station]]. It is located 27 km away from [[Suratgarh]] town in [[Ganganagar]] district. The power plant is operated by Rajasthan Rajya Vidyut Utpadan Nigam Ltd ([[RVUNL]]). The power plant has 6 units that can produce 250 megawatt and 2 units can produce 660 MW. | '''Suratgarh Super Thermal Power Station''' is [[Rajasthan]]'s first [[super thermal power station]]. It is located 27 km away from [[Suratgarh]] town in [[Ganganagar]] district. The power plant is operated by Rajasthan Rajya Vidyut Utpadan Nigam Ltd ([[RVUNL]]). The power plant has 6 units that can produce 250 megawatt and 2 units can produce 660 MW. | ||
== Awards == | == Awards == | ||
| Line 31: | Line 28: | ||
! Stage !! Unit Number !! Installed Capacity ([[Watt#Megawatt|MW]]) !! Date of Commissioning !! Status | ! Stage !! Unit Number !! Installed Capacity ([[Watt#Megawatt|MW]]) !! Date of Commissioning !! Status | ||
|- | |- | ||
| Stage I || 1 || 250 || May | | Stage I || 1 || 250 || May 1998 || Running | ||
|- | |- | ||
| Stage I || 2 || 250 || March | | Stage I || 2 || 250 || March 2000 || Running | ||
|- | |- | ||
| Stage II || 3 || 250 || October | | Stage II || 3 || 250 || October 2001 || Running | ||
|- | |- | ||
| Stage II || 4 || 250 || March | | Stage II || 4 || 250 || March 2002 || Running | ||
|- | |- | ||
| Stage III || 5 || 250 || June | | Stage III || 5 || 250 || June 2003 || Running | ||
|- | |- | ||
| Stage IV || 6 || 250 || March | | Stage IV || 6 || 250 || March 2009 || Running | ||
|- | |- | ||
|Stage V || 7 || 660 || March | |Stage V || 7 || 660 || March 2016 || Running | ||
|- | |- | ||
|Stage V || 8 || 660 || 2016 || | |Stage V || 8 || 660 || 2016 ||Running | ||
|- | |- | ||
|} | |} | ||
== See also == | == See also == | ||
{{Portal|Energy|India}} | |||
* [[Kota Super Thermal Power Plant]] | * [[Kota Super Thermal Power Plant]] | ||
* [[Giral Lignite Power Plant]] | * [[Giral Lignite Power Plant]] | ||
| Line 61: | Line 58: | ||
{{Electricity generation|state=collapsed}} | {{Electricity generation|state=collapsed}} | ||
{{Power Plants of Rajasthan}} | {{Power Plants of Rajasthan}} | ||
[[Category:Coal-fired power stations in Rajasthan]] | [[Category:Coal-fired power stations in Rajasthan]] | ||
| Line 67: | Line 63: | ||
[[Category:Energy infrastructure completed in 1998]] | [[Category:Energy infrastructure completed in 1998]] | ||
[[Category:1998 establishments in Rajasthan]] | [[Category:1998 establishments in Rajasthan]] | ||
[[Category:20th-century architecture in India]] | |||
{{India-powerstation-stub}} | {{India-powerstation-stub}} | ||
Latest revision as of 07:14, 8 July 2025
| Suratgarh super thermal power station | |
|---|---|
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
| Country | India |
| Location | Suratgarh, Ganganagar, Rajasthan |
| Coordinates | 29°10′54″N 74°01′10″E / 29.1817°N 74.0194°E |
| Status | Operational |
| Commission date | 1998 |
| Operator(s) | RVUNL |
| Thermal power station | |
| Primary fuel | Coal |
| Power generation | |
| Script error: No such module "Infobox power station". | |
| Nameplate capacity | 2820.00 MW |
Source: https://rvunl.com/ | |
Suratgarh Super Thermal Power Station is Rajasthan's first super thermal power station. It is located 27 km away from Suratgarh town in Ganganagar district. The power plant is operated by Rajasthan Rajya Vidyut Utpadan Nigam Ltd (RVUNL). The power plant has 6 units that can produce 250 megawatt and 2 units can produce 660 MW.
Awards[edit | edit source]
The plant received a gold shield on 8 August 2004 from Hon'ble President for consistently outstanding performance during the years 2000 to 2004. It also received a bronze shield from Hon' Prime Minister for outstanding performance during the years 2005 and 2006.[1]
Installed capacity[edit | edit source]
Following is the unit wise capacity of the plant.[2]
| Stage | Unit Number | Installed Capacity (MW) | Date of Commissioning | Status |
|---|---|---|---|---|
| Stage I | 1 | 250 | May 1998 | Running |
| Stage I | 2 | 250 | March 2000 | Running |
| Stage II | 3 | 250 | October 2001 | Running |
| Stage II | 4 | 250 | March 2002 | Running |
| Stage III | 5 | 250 | June 2003 | Running |
| Stage IV | 6 | 250 | March 2009 | Running |
| Stage V | 7 | 660 | March 2016 | Running |
| Stage V | 8 | 660 | 2016 | Running |
See also[edit | edit source]
- Kota Super Thermal Power Plant
- Giral Lignite Power Plant
- Chhabra Thermal Power Plant
- Ramgarh Gas Thermal Power Station
References[edit | edit source]
- ↑ "Suratgarh Super Thermal Power Station". Rajasthan Rajya Vidyut Utpadan Nigam Ltd.
- ↑ "Suratgarh Super Thermal Power Station". Ganganagar District.