1,326
edits
>Kku m (link marine pollution using Find link) |
No edit summary |
||
Line 1: | Line 1: | ||
{{short description|Series of four survey vessels for the Indian Navy}} | {{short description|Series of four survey vessels for the Indian Navy}} | ||
{{Use dmy dates|date=November | {{Use dmy dates|date=November 2022}} | ||
{{Use Indian English|date=November | {{Use Indian English|date=November 2022}} | ||
{|{{Infobox ship begin|sclass=2 | {|{{Infobox ship begin|sclass=2 | ||
}} <!-- warship classes --> | }} <!-- warship classes --> | ||
{{Infobox ship image | {{Infobox ship image | ||
| Ship image = | | Ship image = [[File:Sandhayak (J18) during its launch ceremony.jpg|250px]] | ||
| Ship caption = | | Ship caption = Sandhayak (J18) during its launch ceremony | ||
}} | }} | ||
{{Infobox ship class overview | {{Infobox ship class overview | ||
| Builders = [[Garden Reach Shipbuilders and Engineers]] | | Builders = *[[Garden Reach Shipbuilders and Engineers]] | ||
| Operators = {{navy|India}} | | Operators = {{navy|India}} | ||
| Class before = {{sclass| | | Class before = {{sclass|Makar|survey catamaran|4}} | ||
| Class after = | | Class after = | ||
| Subclasses = | | Subclasses = | ||
Line 39: | Line 39: | ||
| Ship range = *{{convert|6500|nmi|abbr=on|lk=in}} at {{convert|14|kn}} to {{convert|16|kn}} | | Ship range = *{{convert|6500|nmi|abbr=on|lk=in}} at {{convert|14|kn}} to {{convert|16|kn}} | ||
| Ship complement = 231 | | Ship complement = 231 | ||
| Ship armament = | | Ship armament = [[CRN 91 Naval Gun|CRN 91]] naval gun | ||
| Ship sensors = *Autonomous Underwater Vehicles (AUVs) | |||
*Remote Operated Vehicles (ROVs) | |||
*Multi Beam Echo Sounders | |||
| Ship aircraft = 1 × [[HAL Chetak]] helicopter | | Ship aircraft = 1 × [[HAL Chetak]] helicopter | ||
| Ship aircraft facilities = [[Helipad]] | | Ship aircraft facilities = [[Helipad]] | ||
Line 51: | Line 54: | ||
== Design == | == Design == | ||
The ships have a displacement of {{convert|3300|t|LT|0}} and a length of {{Convert|110|m|ftin}}. They have a cruising speed of {{Convert|16|knot|lk=in}} with a maximum speed of {{Convert|18|knot}} and an operating range of {{Convert|6500|nmi|lk=in}} at a speed of {{Convert|14|to|16|knot}}. The ships have a complement of 231 and are equipped with [[Hydrography|hydrographic]] sensor equipment and a [[hangar]] which can accommodate one advanced light helicopter. In the secondary role, the ships can be fitted with a [[CRN 91 Naval Gun|CRN 91]] naval gun. In addition, the vessels will follow MARPOL ([[marine pollution]]) Standards of the [[International Maritime Organization|International Maritime Organisation]] and will be built per Classification Society Rules and Naval Ship Regulations. | The ships have a displacement of {{convert|3300|t|LT|0}} and a length of {{Convert|110|m|ftin}}. They have a cruising speed of {{Convert|16|knot|lk=in}} with a maximum speed of {{Convert|18|knot}} and an operating range of {{Convert|6500|nmi|lk=in}} at a speed of {{Convert|14|to|16|knot}}. The ships have a complement of 231 and are equipped with [[Hydrography|hydrographic]] sensor equipment and a [[hangar]] which can accommodate one advanced light helicopter. In the secondary role, the ships can be fitted with a [[CRN 91 Naval Gun|CRN 91]] naval gun. In addition, the vessels will follow MARPOL ([[marine pollution]]) Standards of the [[International Maritime Organization|International Maritime Organisation]] and will be built per Classification Society Rules and Naval Ship Regulations.<ref name=":0" /><ref name=":2" /><ref>{{Cite news|url=https://www.deccanchronicle.com/nation/current-affairs/301018/grse-bags-over-rs-2000-crore-contract-to-build-4-large-survey-vessels.html|title=GRSE bags over Rs 2,000 crore contract to build 4 large survey vessels for Navy|date=2018-10-30|work=Deccan Chronicle|access-date=2018-11-26|language=en}}</ref> | ||
== Development == | |||
The keel of the first ship ''Sandhayak ,''named after its predecessor {{INS|Sandhayak|J18|2}}, was laid down on 8 November 2019 and launched on 5 December 2021. It is expected to be commissioned by 2023.<ref name="sadhayak_launch">{{cite press release |url=https://pib.gov.in/PressReleasePage.aspx?PRID=1778276 |title=First of the four ships under Survey Vessel (Large) project for Indian Navy launched in the presence of Raksha Rajya Mantri at GRSE, Kolkata |publisher=PIB |date=2021-12-05}}</ref><ref name="3025_launch">{{cite tweet|number=1467495738791714823|user=indiannavy|title=Sandhayak and her three other sister ships are scheduled to be delivered between Oct 22 and Jan 24|date=2021-12-05}}</ref> | |||
The second vessel of the class, ''Nirdeshak'' , was laid on 1 December 2020 and was subsequently launched on 26 May 2022. | |||
The third ship, ''Ikshak'', was laid down on 6 August 2021 and launched on 26 November 2022.<ref name="pib-060821">{{cite web |date=2021-08-06 |title=KEEL LAYING CEREMONY FOR 1st WARSHIP OF ASW SHALLOW WATER CRAFT PROJECT AND 3rd WARSHIP OF SURVEY VESSEL LARGE PROJECT |url=https://pib.gov.in/PressReleasePage.aspx?PRID=1743323 |publisher=PIB}}</ref><ref>{{Cite web |date=2022-11-26 |title=GRSE launches 3rd Survey Vessel (Large) within a year |url=https://psuwatch.com/grse-launches-3rd-survey-vessel-large-within-a-year-after/ |access-date=2022-11-26 |language=en-US}}</ref> | |||
== Ships of the class == | == Ships of the class == | ||
{| class="wikitable" | {| class="wikitable" | ||
!Yard No | ! Name | ||
! Yard No | |||
! Pennant | ! Pennant | ||
! Laid down | ! Laid down | ||
Line 61: | Line 72: | ||
! Commissioned | ! Commissioned | ||
! Home-port | ! Home-port | ||
!Status | ! Status | ||
|- | |- | ||
|3025 | | {{INS|Sandhayak|2021|2}} | ||
| | | 3025 | ||
| J18 | |||
| 8 November 2019<ref>{{cite tweet|user=OfficialGRSE|number=1192733198821675010|title=Vice Admiral Ajay Kumar Saxena, PVSM, AVSM, VSM, Controller of Warship Production & Acquisition delivering his speech on the Keel Laying Ceremony of First Survey Vessel Large won on competitive bidding by GRSE|date=2019-11-08}}</ref> | | 8 November 2019<ref>{{cite tweet|user=OfficialGRSE|number=1192733198821675010|title=Vice Admiral Ajay Kumar Saxena, PVSM, AVSM, VSM, Controller of Warship Production & Acquisition delivering his speech on the Keel Laying Ceremony of First Survey Vessel Large won on competitive bidding by GRSE|date=2019-11-08}}</ref> | ||
| | | 5 December 2021<ref name="sadhayak_launch"/> | ||
| | | 2023 ''(expected)''<ref name="3025_launch"/> | ||
| | | | ||
| | | Fitting Out | ||
|- | |- | ||
|3026 | | ''Nirdeshak'' | ||
| | | 3026 | ||
|1 December 2020<ref>{{Cite web|last=Mathew|first=Arun|title=GRSE Lays Keel for Second Survey Vessel (Large) for Indian Navy|url=https://defpost.com/grse-lays-keel-for-second-survey-vessel-large-for-indian-navy/|access-date=2020-12-01|website=DefPost|language=en-GB}}</ref> | | J19 | ||
| | | 1 December 2020<ref>{{Cite web|last=Mathew|first=Arun|title=GRSE Lays Keel for Second Survey Vessel (Large) for Indian Navy|url=https://defpost.com/grse-lays-keel-for-second-survey-vessel-large-for-indian-navy/|access-date=2020-12-01|website=DefPost|language=en-GB}}</ref> | ||
| | | 26 May 2022<ref name="grse-icici">{{cite web|url=http://www.grse.in/images/press_news/EQUITYBULL20S.jpg|title=GRSE-ICIC security|publisher=GRSE|access-date=2021-06-05}}</ref> | ||
| 2023 ''(expected)'' | |||
| | | | ||
| | | Launched<ref>{{cite web|url=http://www.grse.in/pdf/investors/Annual%20Report%202019-20.pdf#page=25|title=Annual Report 2019-20|publisher=GRSE|access-date=25 September 2022}}</ref> | ||
|- | |- | ||
|3027 | | ''Ikshak'' | ||
| | | 3027 | ||
| | | J23 | ||
| | | 6 August 2021<ref name="pib-060821"/> | ||
| | | 26 November 2022 <ref>{{cite tweet|number=1594568061616812032|user=OfficialGRSE|title=Launch of the GRSE built 3rd Survey Vessel (Large) Yard 3027|date=2022-11-21}}</ref> | ||
| 2023 ''(expected)'' | |||
| | | | ||
| | | Launched<ref>{{cite tweet|user=OfficialGRSE|number=1328301982067507200|title=Production of Survey Vessel(Large),Yard 3027, has commenced today.|date=16 November 2022}}</ref> | ||
|- | |- | ||
| | | | ||
| 3028 | |||
| | | | ||
| 17 June 2022 <ref>{{cite tweet|user=OfficialGRSE|number=1537789888804057088|title=GRSE achieved a rare feat by laying the keels of three vessels -SVL(Yard 3028), ASWSWC (Yard 3030 & 3031) together for the Indian Navy on 17 Jun 22.|date=17 June 2022}}</ref> | |||
| Q2 2023 ''(expected)'' | |||
| 2024 ''(expected)'' | |||
| | | | ||
|Under construction<ref>{{cite tweet|user=OfficialGRSE|number=1356159728846598144|title=Production of 4th and last in the series of 04 Survey Vessel (Large), Yard 3028 has commenced today.|date=1 February 2021}}</ref> | | Under construction<ref>{{cite tweet|user=OfficialGRSE|number=1356159728846598144|title=Production of 4th and last in the series of 04 Survey Vessel (Large), Yard 3028 has commenced today.|date=1 February 2021}}</ref> | ||
|} | |} | ||