Durg–Raipur–Arang Expressway: Difference between revisions

Created by 2409:4043:2297:1F30:83DC:C955:31C1:E11C
Last edited February 25, 2025
>ZI Jony
m v2.04b - Fix errors for CW project (DEFAULTSORT missing for titles with special letters)
No edit summary
 
Line 1: Line 1:
{{short description|Road in Chhattisgarh, India}}
{{short description|Road in Chhattisgarh, India}}
'''Durg–Raipur–Arang Expressway''' is a {{convert|92|km|mi|adj=on}} planned and upcoming green field access controlled expressway in [[Chhattisgarh]], India. The expressway will be part of [[Bharatmala Pariyojana]] and will pass from [[Durg]] through [[Anjora]], [[Patora]], [[Supkona]], [[Abhanpur]], [[Naya Raipur]], before terminating at [[Arang]].<ref>{{Cite web|url=https://www.patrika.com/durg-news/affected-farmers-of-durg-raipur-express-corridor-will-get-compensation-5655263/|title=दुर्ग-रायपुर एक्सप्रेस कॉरिडोर, मुआवजे के इंतजार में बैठे तीन जिले के 2330 किसानों के लिए राहत की खबर|website=Patrika News}}</ref> <ref>{{Cite web|url=https://www.patrika.com/durg-news/durg-to-raipur-six-lane-express-corridor-3244970/|title=इस नए एक्सप्रेस-वे से मात्र 20 मिनट में तय होगी दुर्ग से रायपुर की दूरी, 26 गांवों से गुजरेगी विकास की रफ्तार|website=Patrika News}}</ref>
{{Use dmy dates|date=May 2023}}
{{Use Indian English|date=May 2023}}
'''Durg–Raipur–Arang Expressway''' is underconstructed {{cvt|92|km}} long, six-lane, [[Controlled-access highway|access-controlled]] greenfield expressway in the state of [[Chhattisgarh]], [[India]]. The expressway is a part of [[Bharatmala Pariyojana]], and will pass from [[Durg]] through Anjora, Patora, Supkona, Abhanpur and [[Naya Raipur]] before terminating at [[Arang]].<ref>{{Cite web|url=https://www.patrika.com/durg-news/affected-farmers-of-durg-raipur-express-corridor-will-get-compensation-5655263/|title=दुर्ग-रायपुर एक्सप्रेस कॉरिडोर, मुआवजे के इंतजार में बैठे तीन जिले के 2330 किसानों के लिए राहत की खबर|website=Patrika News}}</ref><ref>{{Cite web|url=https://www.patrika.com/durg-news/durg-to-raipur-six-lane-express-corridor-3244970/|title=इस नए एक्सप्रेस-वे से मात्र 20 मिनट में तय होगी दुर्ग से रायपुर की दूरी, 26 गांवों से गुजरेगी विकास की रफ्तार|website=Patrika News}}</ref>


{{infobox road
{{infobox road
Line 12: Line 14:
|direction_a=  
|direction_a=  
|direction_b=  
|direction_b=  
|terminus_a= Tendesara [[Durg]]
|terminus_a= Tendesara, [[Rajnandgaon]]
|junction=
|junction=
|terminus_b= Mahanadi Bridge [[Arang]]
|terminus_b= Mahanadi Bridge, [[Arang]]
|formed=   
|formed=   
|maint=
|maint=
Line 21: Line 23:
==Status updates==
==Status updates==
* Aug 2020: The target date for completion of proposed expressway is set as March 2024.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/23-expressways-new-highways-coming-up-in-next-5-years/articleshow/77526921.cms|title=23 new expressways and highways coming up in next 5 years &#124; India News–Times of India|website=The Times of India}}</ref>
* Aug 2020: The target date for completion of proposed expressway is set as March 2024.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/23-expressways-new-highways-coming-up-in-next-5-years/articleshow/77526921.cms|title=23 new expressways and highways coming up in next 5 years &#124; India News–Times of India|website=The Times of India}}</ref>
* Dec 2022 : Mehrotra Buildcon, and Shelke Constructions Led Joint Ventures Emerge As Lowest Bidders For the Expressway each with 46 km stretch Total 92 km{{fact|date=May 2023}}
==See also==
* [[List of state highways in Chhattisgarh#Expressways|Expressways in Chhattisgarh]]
* [[Expressways in India]]


==References==
==References==
Line 29: Line 37:
[[Category:Expressways in Chhattisgarh]]
[[Category:Expressways in Chhattisgarh]]
[[Category:Proposed expressways in India]]
[[Category:Proposed expressways in India]]
[[Category:Transport in Durg]]
[[Category:Transport in Raipur, Chhattisgarh]]


{{India-road-stub}}
{{India-road-stub}}

Latest revision as of 15:57, 25 February 2025


Durg–Raipur–Arang Expressway is underconstructed 92 km (57 mi) long, six-lane, access-controlled greenfield expressway in the state of Chhattisgarh, India. The expressway is a part of Bharatmala Pariyojana, and will pass from Durg through Anjora, Patora, Supkona, Abhanpur and Naya Raipur before terminating at Arang.[1][2]

Durg-Raipur-Arang Expressway
Route information
Length92 km (57 mi)
Major junctions
FromTendesara, Rajnandgaon
ToMahanadi Bridge, Arang
Highway system

Status updates[edit | edit source]

  • Aug 2020: The target date for completion of proposed expressway is set as March 2024.[3]
  • Dec 2022 : Mehrotra Buildcon, and Shelke Constructions Led Joint Ventures Emerge As Lowest Bidders For the Expressway each with 46 km stretch Total 92 km[citation needed]

See also[edit | edit source]

References[edit | edit source]

  1. "दुर्ग-रायपुर एक्सप्रेस कॉरिडोर, मुआवजे के इंतजार में बैठे तीन जिले के 2330 किसानों के लिए राहत की खबर". Patrika News.
  2. "इस नए एक्सप्रेस-वे से मात्र 20 मिनट में तय होगी दुर्ग से रायपुर की दूरी, 26 गांवों से गुजरेगी विकास की रफ्तार". Patrika News.
  3. "23 new expressways and highways coming up in next 5 years | India News–Times of India". The Times of India.