Bilaspur–Katni line: Difference between revisions
>Vatsmaxed (template updated) |
m (robot: Update article (please report if you notice any mistake or error in this edit)) |
||
Line 24: | Line 24: | ||
| depot = New Katni | | depot = New Katni | ||
| stock = [[Indian locomotive class WDM-2|WDM-2]], WDM-3A, WDG-3A, WDG-3C, [[Indian locomotive class WAG-5|WAG-5]] and [[Indian locomotive class WAG-7|WAG-7]], [[WAP-4]], [[WAP-5]], [[WAP-7]] | | stock = [[Indian locomotive class WDM-2|WDM-2]], WDM-3A, WDG-3A, WDG-3C, [[Indian locomotive class WAG-5|WAG-5]] and [[Indian locomotive class WAG-7|WAG-7]], [[WAP-4]], [[WAP-5]], [[WAP-7]] | ||
| linelength = {{convert|318.6|km|mi|0|abbr=on}} | | linelength = Main Line {{convert|318.6|km|mi|0|abbr=on}} <br /> Branch line: <br /> Anuppur Junction–Chirimiri line {{convert|96.1|km|mi|0|abbr=on}} <br /> Boridand Junction–Ambikapur line {{convert|119.025|km|mi|0|abbr=on}} | ||
| tracklength = {{convert|318.6|km|mi|0|abbr=on}} | | tracklength = {{convert|318.6|km|mi|0|abbr=on}} | ||
| gauge = {{Track gauge|5ft6in|lk=on}} [[broad gauge]] | | gauge = {{Track gauge|5ft6in|lk=on}} [[broad gauge]] | ||
Line 42: | Line 42: | ||
==History== | ==History== | ||
* In 1886, was constructed the first section from Katni to Umaria which was also known as ''Katni–Umaria Provincial State Railway''. | * In 1886, was constructed the first section from Katni to Umaria which was also known as ''Katni–Umaria Provincial State Railway''. | ||
* In 1891, the construction was completed by Bengal Nagpur Railway Katni branch with ''Bilaspur–Etawa Provincial State Railway'' with the extension up to Bilaspur Junction. | * In 1891, the construction was completed by Bengal Nagpur Railway Katni branch with ''Bilaspur–Etawa Provincial State Railway'' with the extension up to Bilaspur Junction.<ref name=ner>{{cite web |url= https://archive.org/details/in.ernet.dli.2015.36650|title= Indian Railways history |access-date=2012-11-06}}</ref> | ||
* In 1993, electrification was started from Katni to Anuppur.<ref>[https:// | * In 1993, electrification was started from Katni to Anuppur.<ref>[https://irfca.org/faq/faq-history5.html IRFCA], 20 April 2019</ref> | ||
==Electrification== | ==Electrification== | ||
Line 51: | Line 51: | ||
Mainline of Bilaspur–Katni Corridor consists of length with {{convert|318.6|km|mi|0|abbr=on}}. This line has two branches first branch line is from Anuppur Junction to Chirimiri with the length of {{convert|96.1|km|mi|0|abbr=on}} and second branch line is of Boridand Junction to Ambikapur with the length of {{convert|119.025|km|mi|0|abbr=on}}. | Mainline of Bilaspur–Katni Corridor consists of length with {{convert|318.6|km|mi|0|abbr=on}}. This line has two branches first branch line is from Anuppur Junction to Chirimiri with the length of {{convert|96.1|km|mi|0|abbr=on}} and second branch line is of Boridand Junction to Ambikapur with the length of {{convert|119.025|km|mi|0|abbr=on}}. | ||
The Branch line of Bilaspur–Katni Corridor is also known for the coal producer line because of the production of coal is more in Baikunthpur and Ambikapur. and on the other side the production of limestone is also there on the main line.<ref>[http://chhattisgarhmines.gov.in/sites/default/files/mininglarge.jpg]</ref> | The Branch line of Bilaspur–Katni Corridor is also known for the coal producer line because of the production of coal is more in Baikunthpur and Ambikapur. and on the other side the production of limestone is also there on the main line.<ref>[http://chhattisgarhmines.gov.in/sites/default/files/mininglarge.jpg Chhattisgarh Mines Map]</ref> | ||
==References== | ==References== | ||
Line 61: | Line 61: | ||
[[Category:Rail transport in Madhya Pradesh]] | [[Category:Rail transport in Madhya Pradesh]] | ||
[[Category:5 ft 6 in gauge railways in India]] | [[Category:5 ft 6 in gauge railways in India]] | ||
[[Category:South East Central Railway | [[Category:South East Central Railway zone]] | ||
[[Category:West Central Railway | [[Category:West Central Railway zone]] | ||
[[Category:Rail transport in Chhattisgarh]] | [[Category:Rail transport in Chhattisgarh]] |
Latest revision as of 05:02, 12 May 2022
Bilaspur–Katni line | |||
---|---|---|---|
![]() Bijuri railway station lies on Bilaspur–Katni line | |||
Overview | |||
Status | Operational | ||
Owner | Indian Railways | ||
Locale | Chhattisgarh & Madhya Pradesh | ||
Termini | Bilaspur Junction Katni Junction | ||
Service | |||
Operator(s) | South East Central Railway West Central Railway | ||
Depot(s) | New Katni | ||
Rolling stock | WDM-2, WDM-3A, WDG-3A, WDG-3C, WAG-5 and WAG-7, WAP-4, WAP-5, WAP-7 | ||
History | |||
Opened | 1891 | ||
Technical | |||
Line length | Main Line 318.6 km (198 mi) Branch line: Anuppur Junction–Chirimiri line 96.1 km (60 mi) Boridand Junction–Ambikapur line 119.025 km (74 mi) | ||
Track length | 318.6 km (198 mi) | ||
Track gauge | 5 ft 6 in (1,676 mm) broad gauge | ||
Operating speed | up to 130 km/h | ||
|
The Bilaspur–Katni line is a railway route on the West Central Railway & South East Central Railway section of Indian Railways. It is one of the hilly railway routes of the Indian Railways and is fully electrified.[1]
The Bilaspur–Katni line has consisted of hilly areas and reservoirs. The route of this line is via Anuppur, Shahdol & Umaria to Katni with bypassing Amarkantak hill range.
History[edit]
- In 1886, was constructed the first section from Katni to Umaria which was also known as Katni–Umaria Provincial State Railway.
- In 1891, the construction was completed by Bengal Nagpur Railway Katni branch with Bilaspur–Etawa Provincial State Railway with the extension up to Bilaspur Junction.[2]
- In 1993, electrification was started from Katni to Anuppur.[3]
Electrification[edit]
The electrification of Bilaspur–Katni line was done in the year 1995 and its branches was done in the year 1994.[4]
Main line & branches[edit]
Mainline of Bilaspur–Katni Corridor consists of length with 318.6 km (198 mi). This line has two branches first branch line is from Anuppur Junction to Chirimiri with the length of 96.1 km (60 mi) and second branch line is of Boridand Junction to Ambikapur with the length of 119.025 km (74 mi).
The Branch line of Bilaspur–Katni Corridor is also known for the coal producer line because of the production of coal is more in Baikunthpur and Ambikapur. and on the other side the production of limestone is also there on the main line.[5]
References[edit]
- ↑ India Rail Info, 20 April 2019
- ↑ "Indian Railways history". Retrieved 2012-11-06.
- ↑ IRFCA, 20 April 2019
- ↑ IRFCA, 20 April 2019
- ↑ Chhattisgarh Mines Map