Kakatiya Thermal Power Station: Difference between revisions
>BrownHairedGirl (added Category:2010 establishments in Andhra Pradesh using HotCat) |
m (Removed empty portal template using script) |
||
(One intermediate revision by one other user not shown) | |||
Line 31: | Line 31: | ||
| extra = | | extra = | ||
}} | }} | ||
'''Kakatiya Thermal Power Station''' is located near Chelpur village of [[ | '''Kakatiya Thermal Power Station''' is located near Chelpur village of [[Ghanpur, Warangal district|Ghanpur]] mandal in [[Warangal district]] of the Indian state of [[Telangana]]. The power plant is one of the [[Fossil fuel power station|coal based power plants]] of [[Telangana Power Generation Corporation|TSGENCO]] | ||
==Plant== | ==Plant== | ||
This power plant was developed in 2 stages. The first stage comprised one 500MW unit. The unit was synchronized to grid with oil firing on 31.03.2010 at 06:08 hrs. Coal firing was immediately taken up and the load was raised up to 84 MW and the unit was in service with this load for about 1 hour.<ref>{{cite web|url=http://www.cea.nic.in/power_sec_reports/Executive_Summary/2010_05/8.pdf|title=Kakatiya Thermal Power Station|publisher=Central Electricity Authority.|access-date=26 August 2010|archive-url=https://web.archive.org/web/20100926024825/http://cea.nic.in/power_sec_reports/Executive_Summary/2010_05/8.pdf|archive-date=26 September 2010|url-status=dead}}</ref> | This power plant was developed in 2 stages. The first stage comprised one 500MW unit. The unit was synchronized to grid with oil firing on 31.03.2010 at 06:08 hrs. Coal firing was immediately taken up and the load was raised up to 84 MW and the unit was in service with this load for about 1 hour.<ref>{{cite web|url=http://www.cea.nic.in/power_sec_reports/Executive_Summary/2010_05/8.pdf|title=Kakatiya Thermal Power Station|publisher=Central Electricity Authority.|access-date=26 August 2010|archive-url=https://web.archive.org/web/20100926024825/http://cea.nic.in/power_sec_reports/Executive_Summary/2010_05/8.pdf|archive-date=26 September 2010|url-status=dead}}</ref> | ||
Kakatiya TPP Unit-II 1X600MW, was synchronized to the grid at 03:00 hrs. on 22 | Kakatiya TPP Unit-II 1X600MW, was synchronized to the grid at 03:00 hrs. on 22 October 2015 and loaded to 105 MW. | ||
==Capacity== | ==Capacity== | ||
Line 50: | Line 50: | ||
== See also == | == See also == | ||
* [[List of Power Stations in Telangana]] | * [[List of Power Stations in Telangana]] | ||
Line 59: | Line 59: | ||
[[Category:Coal-fired power stations in Telangana]] | [[Category:Coal-fired power stations in Telangana]] | ||
[[Category: | [[Category:Hanamkonda district]] | ||
[[Category:2010 establishments in Andhra Pradesh]] | [[Category:2010 establishments in Andhra Pradesh]] | ||
{{India-powerstation-stub}} | {{India-powerstation-stub}} |
Latest revision as of 13:35, 14 August 2023
Kakatiya Thermal Power Station is located near Chelpur village of Ghanpur mandal in Warangal district of the Indian state of Telangana. The power plant is one of the coal based power plants of TSGENCO
Kakatiya Thermal Power Project at Bhupalpalle | |
---|---|
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value). | |
Official name | KTPP |
Location | Ghanpur, Warangal district, Telangana |
Coordinates | 18°23′15″N 79°50′22″E / 18.38750°N 79.83944°ECoordinates: 18°23′15″N 79°50′22″E / 18.38750°N 79.83944°E |
Status | Operational |
Commission date | Unit 1: February 2009 'Under implementation' Unit 2: 2013 |
Operator(s) | Telangana Power Generation Corporation Limited (TSGENCO) |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Script error: No such module "Infobox power station". | |
Nameplate capacity | 500 MW 'Under implementation' 600 MW |
PlantEdit
This power plant was developed in 2 stages. The first stage comprised one 500MW unit. The unit was synchronized to grid with oil firing on 31.03.2010 at 06:08 hrs. Coal firing was immediately taken up and the load was raised up to 84 MW and the unit was in service with this load for about 1 hour.[1]
Kakatiya TPP Unit-II 1X600MW, was synchronized to the grid at 03:00 hrs. on 22 October 2015 and loaded to 105 MW.
CapacityEdit
Stage | Unit Number | Installed Capacity (MW) | Date of Commissioning | Status |
---|---|---|---|---|
Stage I | 1 | 500 | May, 2010 | Running |
Stage II | 2 | 600 | Jan, 2016 | Running |
See alsoEdit
ReferencesEdit
- ↑ "Kakatiya Thermal Power Station" (PDF). Central Electricity Authority. Archived from the original (PDF) on 26 September 2010. Retrieved 26 August 2010.
- ↑ "BHEL commissions 600 MW Thermal Unit in Telangana | Central Chronicle". www.centralchronicle.com. Archived from the original on 25 April 2018. Retrieved 30 May 2017.